Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

State Route 12 Pavement Rehabilitation Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

Caltrans plans to rehabilitate pavement and improve infrastructure along State Route 12 between postmile 0.0 to 3.31 in Napa County and postmile 0.0 to 7.90 in Solano County, including drainage enhancements, installation of pedestrian islands, and updates to various system elements. The project is being evaluated under a proposed Negative Declaration, indicating that Caltrans anticipates no significant environmental impacts from the proposed work. Based on an Initial Study, the project is not expected to substantially affect aesthetics, agriculture, air quality, cultural resources, energy, geology, hydrology, land use, mineral resources, population, housing, public services, recreation, tribal cultural resources, utilities, wildfire risk, greenhouse gas emissions, hazards, noise, transportation, traffic, or biological resources. While the project may result in minor or less than significant effects in certain areas, it is not anticipated to trigger the need for an Environmental Impact Report. The project is formally listed under the title State Route 12 Pavement Rehabilitation Project with a forecast posting date of June 24, 2026, and is managed by Caltrans District 4 – Bay Area/Oakland. Public and agency comments may still influence the final determination of the Negative Declaration, and the decision is not yet final. The primary point of contact for environmental inquiries is Matthew Coughlin, Environmental Scientist, reachable via email or phone. The project’s official documentation and updates can be accessed through the provided online link.

General Info

Caltrans to rehabilitate SR-12 pavement and improve infrastructure with minor environmental impacts under Negative Declaration.

Agency

California → Caltrans, District 4 - Bay Area/Oakland

Place of Performance

Napa County: Airport Blvd and Broadway Blvd. Solano County: SR 12 and Pennsylvania Ave, CA, 94503

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

1 update
Posted

forecast

Notice updated

The notice description changed.

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Caltrans, District 4 - Bay Area/Oakland
Contacts1 person available
OfficeN/A
Organization / Agency
California → Caltrans, District 4 - Bay Area/Oakland
Office AddressN/A
Contacts
Matthew CoughlinEnvironmental Scientist

Full Description

Show more
This project proposes to rehabilitate pavement, restore drainage systems, and enhance multimodal access on state route (SR) 12 in Napa County, postmile (PM) 0.0/3.31 and in Solano County, PM 0.0/7.90. The goal of this project is preserve and extend the service life of the pavement by addressing significant pavement cracks along the SR 12, in addition to restoring drainage system capacity, providing updates to pedestrian and bike infrastructure, and additional highway improvements such as replacement of road signs and guardrail.

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
Joliet Job Corps-Request for Quote Parking Lot and Road Repairs
Solicitation # joliet-job-corps-request-quote-parking-lot-road-repairs
Management & Training Corporation (MTC) is seeking a subcontractor for road and parking lot repairs at the Joliet Job Corps Center in Illinois. This fixed-price, single lump sum project has an estimated value between $100,000 and $250,000. The scope of work includes asphalt pavement replacement for approximately 62,500 square feet across the Dorm Parking Lot, West Side of Dorms, Kitchen/BCT, and Dumpster/Maintenance areas, as well as the repair of five storm sewer drains and five potholes. The selected contractor must complete all work within 90 consecutive business days following a written Notice to Proceed. Bids will be awarded based on overall best value, and interested parties must conduct a physical site visit and sign the attendance roster to be eligible. Required submission documents include the MTC Bid for Lump Sum Contract form, a detailed cost breakout on company letterhead, proof of insurance, and a completed MTC Supplier Packet. Because the project exceeds $25,000, a bid bond of 20% of the base bid is required, and the awarded contractor must provide performance and payment bonds from a surety company with at least an A- rating. Compliance with Construction Wage Rate Requirements is mandatory, requiring the payment of prevailing wages and the submission of weekly certified payroll. The contract incorporates various Federal Acquisition Regulation clauses, including those regarding small business utilization and the prohibition of trafficking in persons. Final payment is contingent upon a successful final inspection by the Buyer and the submission of two complete sets of Operation and Maintenance manuals and manufacturer warranties.
Joliet Job Corps

POSTED

about 7 hours ago

DEADLINE

in about 7 hours
View Details
NAICS: 237310
New
SLED
CN-0938-23BR BRIDGE 67
Solicitation # CN-0938-23BR
The Cherokee Nation Department of Transportation and Infrastructure is soliciting bids for Project CN-0938-23BR, which involves the replacement and reconstruction of Bridge 67 over Pecan Creek in Cherokee County, Oklahoma. The scope of work includes the removal of the existing bridge and the installation of a 13x40x20/40/20 Fast Cast Bridge with associated approaches. Additional project requirements include the construction of asphalt pavement, placement of sod, installation of fencing and mailboxes, and the application of traffic stripes and signage. This is a Fixed Completion Date Contract that adheres to the 2019 ODOT Standard Specifications as amended by the Cherokee Nation. Prospective bidders must attend a mandatory pre-bid conference on October 20, 2026, at 10:00 a.m. at the CNDOT building in Tahlequah, Oklahoma, as failure to attend will result in the rejection of the bid. All inquiries must be submitted in writing via Bid Express by October 27, 2026. Sealed bids must be submitted through the Bid Express website no later than 10:00 a.m. on November 10, 2026. The contract will be awarded to the lowest responsive and responsible bidder, with a strong emphasis on Indian preference requirements and TERO certifications. Contractors are required to provide a written Quality Control Plan one week prior to the pre-work conference and must utilize a certified independent testing firm. Mandatory submissions include a bid bond, and the successful awardee must provide performance, payment, and maintenance bonds, as well as proof of comprehensive insurance. Labor must comply with Davis-Bacon Wage Determinations, and all work must meet OSHA safety standards. The project is managed by the Cherokee Nation Director and Resident Engineer, who are responsible for inspection and final acceptance.
Cherokee Nation Department of Transportation & Infrastructure

POSTED

about 17 hours ago

DEADLINE

in 20 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS