Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

State Route 138 Widening Project from Avenue T to State Route 18 Through Palmdale, Littlerock, Pearblossom and Llano

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The State Route 138 Widening Project (Segment 13) is a forecast infrastructure initiative managed by Caltrans District 7 in Los Angeles County. The primary scope of work involves widening SR 138 from post mile 66.0 to 68.5, expanding the roadway from two lanes to four lanes. This configuration will include two 12-foot lanes and an 8-foot shoulder in each direction, separated by a 16-foot two-way left-turn median to increase overall capacity. Additionally, the project includes traffic striping improvements without additional capacity increases on SR 138 from post mile 68.5 to 70.1 and on SR 18 from post mile 3.4 to 4.5. The project was approved by the California Transportation Commission on December 4-5, 2025, following the completion of an Environmental Impact Report and Addendum in accordance with CEQA. As a condition of approval, specific mitigation measures and a Statement of Overriding Considerations have been adopted. Administrative oversight is provided by the California Transportation Commission, with Chris Benz-Blumberg serving as the lead agency contact and Cherry Zamora as the associate deputy director. The project is categorized under NAICS code 237310 for highway, street, and bridge construction.

General Info

Widen SR 138 to four lanes, add striping on SR 138 and SR 18, environmental approval secured, Caltrans District 7 overseeing.

Agency

California → Caltrans, District 7 - Los Angeles

NAICS

237310 - Highway, Street, and Bridge ConstructionView NAICS

Place of Performance

CA

Set-Aside

NONE

Documents

(1)

SR-138 Widening Project Notice of Determination

PDFnotice-of-determination

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Caltrans, District 7 - Los Angeles
Contacts2 people available
OfficeN/A
Organization / Agency
California → Caltrans, District 7 - Los Angeles
Office AddressN/A
Contacts
Cherry ZamoraAssociate Deputy Director
Chris Benz-BlumbergSenior Environmental Planner

Full Description

Show more
Widen SR 138 from PM 66.0 to 68.5 from 2 lanes to 4 lanes, consisting of two 12-foot lanes and an 8-foot shoulder in each direction divided by a 16-foot two way left-turn median, creating additional capacity. Additionally, provide traffic striping improvements only (no additional capacity) on SR 138 from PM 68.5 to 70.1 and SR 18 from PM 3.4 to 4.5.

Similar Contracts

Same NAICS industry code

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS