State Route 246 CAPM and Robinson Bridge Replacement

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

Caltrans District 5 is proposing the State Route 246 CAPM and Robinson Bridge Replacement project in Lompoc, California. The primary scope of work involves replacing the Santa Ynez River Bridge at post mile 9.82 and preserving 21.7 lane miles of flexible Class 2 pavement using Capital Preventive Maintenance strategies, including rubberized hot mix asphalt overlays. Additional infrastructure improvements include the installation of approximately 1,680 linear feet of 6-foot-wide sidewalk, the rehabilitation of 653 linear feet of culverts across seven locations, and the upgrade of 12 curb ramps to ADA standards. The project also includes updating sign panels, pavement markings, and guardrails to current safety standards. Construction is expected to begin in Spring 2030 and last for two years, with a subsequent three-year plant establishment period. Due to environmental protections, in-stream work and culvert activities are restricted to the window between June 1 and October 31. The project is subject to several critical regulatory permits, including Section 401 and 404 certifications and consultations with the U.S. Fish and Wildlife Service and National Marine Fisheries Service to protect species such as the Southern California steelhead and California red-legged frog. Preliminary construction cost estimates for various design alternatives range from 86.5 million to 114 million dollars. The project has been cleared through an Initial Study with a Mitigated Negative Declaration, concluding that it will not have a significant environmental effect provided that biological mitigation and monitoring plans are implemented.

General Info

Caltrans replaces Robinson Bridge with cost-saving design, eco-friendly measures, and 458-day construction starting Spring 2030.

Agency

California → Caltrans, District 5 - San Luis Obispo/Santa Barbara

NAICS

237310 - Highway, Street, and Bridge ConstructionView NAICS

Place of Performance

North 12th Street and Domingos Road, Lompoc, CA, 93436

Set-Aside

NONE

Documents

(3)

Route 246 CAPM and Robinson Bridge Initial Study with Mitigated Negative Declaration Oct 2025

PDFmitigated-negative-declaration

2025 Environmental Document Filing Fee Cash Receipt - State Route 246 CAPM and Robinson Bridge Project

PDFreceipt

Notice of Determination for State Route 246 CAPM and Robinson Bridge Replacement

PDFdetermination-and-findings

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Caltrans, District 5 - San Luis Obispo/Santa Barbara
Contacts1 person available
OfficeN/A
Organization / Agency
California → Caltrans, District 5 - San Luis Obispo/Santa Barbara
Office AddressN/A
Contacts
Lucas MarsalekSenior Environmental Scientist Supervisor

Full Description

Show more
Caltrans proposes to replace the Santa Ynez River Bridge, known locally as Robinson Bridge, at post mile 9.82. The project will also preserve 21.7 lane miles of flexible Class 2 pavement using Capital Preventive Maintenance strategies, add a small portion of sidewalk to State Route 246, rehabilitate culverts, upgrade sign panels, and upgrade existing curb ramps and guardrails to current safety standards.

Similar Contracts

Same NAICS industry code

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS