Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Washington was posted on August 13, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Statement of Qualifications - Paradise Point Well 2 & 3 Pump and Wellhouse

Closed
RFQ 507State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 541330
New
Consulting Services for Chino Basin Program Aquifer Replenishing Facilities Design
Solicitation # RFP-JV-26-013
The Inland Empire Utilities Agency is soliciting engineering consulting services for the Chino Basin Program Aquifer Replenishing Facilities Design Project in California. The scope of work involves the design of four monitoring wells and nine injection wells (seven operating and two standby) to replenish purified water into the Chino Groundwater Basin at an anticipated volume of 15,000 acre-feet per year. Key deliverables include a Basis of Design Report at the 30 percent design level, detailed design documents, and procurement packages for drilling and construction. The project must adhere to California Code of Regulations Title 22 for indirect potable reuse and follow ASCE (2007) guidelines for the Geotechnical Baseline Report. Construction for injection and monitoring wells is targeted to begin by May 2028, with well equipping starting by July 2029. This solicitation is a set-aside for Small Business (SB), SBA certified Veteran Owned Small Business (VOSB), SBA certified Service-Disabled Veteran Owned Small Business (SDVOSB), SBA certified Women-Owned Small Business (WOSB), and SBA certified HUBZone Small Business (HUBZone SB). The selection process ranks consultants based on a 100-point scale, evaluating the team's qualifications and the consultant's understanding of the scope and efficiency. The top-ranked consultant will negotiate a not-to-exceed contract subject to approval by the IEUA Board of Directors. Compliance requirements include the Davis-Bacon Act, the Buy America Preference for Infrastructure Projects, and DBE requirements. Invoicing is conducted monthly via a standard Excel template with payments made through ACH.
Inland Empire Utilities Agency

POSTED

about 3 hours ago

DEADLINE

in 2 months
NAICS: 541330
New
RFP-JV-26-014 Consulting Services for Chino Basin Program Purified Water Conveyance Design Project
Solicitation # EN25022.03 AND EN28004
The Inland Empire Utilities Agency is soliciting consulting services for the Chino Basin Program Purified Water Conveyance Design Project in California. The scope of work involves providing professional engineering services to design a system that delivers purified water from the Advanced Water Purification Facility to injection wells. Key responsibilities include conducting utility research and field investigations, developing a basis of design across multiple disciplines, creating design drawings at 30, 60, 90, and final levels, and providing engineering support during the bid award process. The contract is structured as a not-to-exceed agreement, with the final fee to be negotiated with the top-ranked consultant. This opportunity is set aside for Small Business (SB), SBA certified Veteran Owned Small Business (VOSB), SBA certified Service-Disabled Veteran Owned Small Business (SDVOSB), SBA certified Women-Owned Small Business (WOSB), and SBA certified HUBZone Small Business (HUBZone SB). Proposals must be submitted via PlanetBids by January 26, 2027. Evaluation is based on a 100-point scale, including a 20-point interview component for the top three ranked firms. Consultants must comply with strict DBE requirements, federal and state grant funding mandates, and the Agency's Engineering Design Guidelines. All payments are processed via ACH, and the Agency retains ownership of all project materials and data.
Inland Empire Utilities Agency

POSTED

about 3 hours ago

DEADLINE

in 2 months
NAICS: 541330
New
SLED
Rail Crossing Elimination Program
Solicitation # 675
The City of Fort Lauderdale is seeking a qualified contractor to perform a Railroad Safety and Congestion Analysis for its Transportation and Mobility Department. The project focuses on 15 rail crossings within the city to detect and document train activity, quantify motorist delays, analyze vehicle emissions, and assess impacts on emergency responders. The contractor will be responsible for developing data-driven recommendations to improve safety and reduce congestion, including potential solutions such as grade separation, crossing consolidation, or the establishment of quiet zones. Key deliverables include a Draft Alternatives Analysis Report, a Final Alternatives Analysis Report, capital cost estimates, and a comprehensive Final Report. This solicitation is governed by the Federal Railroad Administration (FRA) Grant Agreement No. 69A36525420230RCEFL and must comply with federal regulations, including 2 CFR Part 200 and the Build America, Buy America Act. Proposals are evaluated based on a weighted criteria system where the firm with the lowest average final ranking score is recommended for the award. There is no specific set-aside status for this contract. Bidders must certify they are not currently debarred or suspended from federal transactions and must adhere to strict data governance and non-discrimination laws. All pricing must be submitted through the City's INFOR strategic sourcing platform.
City of Fort Lauderdale

POSTED

about 12 hours ago

DEADLINE

in 20 days

AI Contract Overview

Show more

Clark Public Utilities is soliciting Statements of Qualifications from professional engineering firms for the design of the Paradise Point Well 2 and 3 pump and wellhouse in Clark County, Washington. The project scope encompasses preliminary and final engineering design, the creation of bid-ready plans and specifications, contract documents, construction cost estimates, and the production of a Washington Department of Health Project Report. The selected consultant will also provide technical and construction management support. The project is funded by water rates from the 2026 through 2028 capital funds, with a timeline targeting preliminary design by December 2026, final documents by September 2027, and a construction start date in January 2028. Submissions must be delivered as a PDF via email by 2:00 P.M. Pacific Time on September 3, 2026, and must not exceed eight single-sided pages. Evaluation is based on a point system focusing on professional qualifications and specialty equipment experience (40 points), project understanding and approach (35 points), the viability of the design schedule (15 points), and three client references (10 points). The Utility will select the most qualified firm based on the highest total score, followed by negotiations for a fair and reasonable fee. Technical documentation, including geotechnical investigations and GPS monitoring reports, is provided to support the design process, and all work must be compatible with AutoCAD and Civil 3D.

General Info

Engineering design for Paradise Point Well 2 and 3 pump and wellhouse.

Place of Performance

WA, USA

Set-Aside

NONE

Documents

9
PDF, High priority: read this firstgeotechnical-report
High
PDF, High priority: read this firstgeotechnical-investigation-report
High
PDF, High priority: read this firstspecifications
High
PDF, High priority: read this firstrfq
High
PDF, High priority: read this firstcontract-document
High
PDF, Low priorityother
Low
PDF, Low priorityspecifications
Low
PDF, Low priorityother
Low
PDF, Low priorityspecifications
Low

Read all 9 documents

Every page of every file, in your free workspace.

Read the documents

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • Consulting Services for Chino Basin Program Aquifer Replenishing Facilities DesignOpen now, due in 63 days
  • DBE Subconsultant Opportunity - Qualifications for E Wells PFAS Groundwater Treatment ImprovementsOpen now, due in 8 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

1 update
PhaseClosed
Posted

Solicitation

Notice updated

The notice description changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyWashington → Clark Public Utilities
ContactsNo contacts available
OfficeWA, USA
Office AddressWA, USA
ContactsNo contact information available

Full Description

Show more
Return to Bid List Bid NUMBER RFQ507 TITLE Statement of Qualifications - Paradise Point Well 2 & 3 Pump and Wellhouse PROCESS Offline BASE CURRENCY USD STATUS Open for Bidding CLOSES IN 20 days: 16 hours: 44 minutes: 46 seconds DESCRIPTION BID DOCUMENTS BIDDERS CALENDAR
You must log in to register for Bid Events and to view Bid Question and Response information.
NUMBER RFQ507 TITLE Statement of Qualifications - Paradise Point Well 2 & 3 Pump and Wellhouse AVAILABLE DATE 8/13/2026 9:30 AM DUE DATE 9/3/2026 2:00 PM CONTACT INFORMATION BID TYPE Request for Quote DESCRIPTION
 Clark Public Utilities (the Utility) requests Statements of Qualifications (SOQ) from professional engineering firms for the engineering design of the Paradise Point Well 2 & 3 pump and wellhouse.
 
The scope of the project includes preliminary and final engineering design, specifications, contract documents, construction cost estimates, design reports, technical support, and construction support.
BID EVENTS (1 record) TITLE ATTENDANCE REQUIRED TO BID DESCRIPTION LOCATION REGISTRATION CUTOFF DATE EVENT START DATE EVENT END DATE CANCELLED ATTACHED FILE FILE DESCRIPTION Non-mandatory Informational Meeting No A non-mandatory pre-proposal conference will be held at the Paradise Point Wellfield on Wednesday, August 19, 2026 at 10:00 A.M. Pacific Time. Access will be provided to the existing well buildings. The entrance to the wellfield is located on NW Toenjes Road immediately after crossing under I-5, south of the property at 34908 NW Toenjes Road. Paradise Point Wellfield 8/19/2026 10:00 AM 8/19/2026 11:00 AM No

More opportunities from Washington → Clark Public Utilities

Same awarding agency

NAICS: 334514
SLED
AMI-Enabled Water Meters
Solicitation # RFP509
Clark Public Utilities is seeking proposals for the annual supply of AMI-enabled water meters compatible with the Sensus FlexNet 522M water module and Sensus UI-1203 communications protocol. The procurement is a best value selection process based on technical requirements, supplier reputation, and total lifecycle cost. The resulting contract will have an initial term of two years, with the utility reserving the right to extend the agreement for three additional one-year periods. Proposals must be submitted by December 22, 2026, and include a cover letter, a technical requirements workbook, a pricing workbook, a signed signature page, and the supplier's standard commercial agreement. Technical specifications require meters to have a minimum nine-digit read capability, a 20-year battery life, and the ability to transmit pressure and temperature data along with real-time alerts for leaks, backflow, and other pipe events. Meters must be NSF 61 certified, feature unique 13-digit identification numbers, and be delivered FOB to the utility's operations center in Vancouver, Washington. The successful bidder must provide a performance bond for 100 percent of the contract award amount plus applicable sales tax within ten business days of execution. Payment will be made via ACH on a Net 30 basis following the receipt and acceptance of materials.
Totalizing Fluid Meter and Counting Device Manufacturing

POSTED

12 days ago

DEADLINE

in 29 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Get AI-powered intelligence on the opportunities still open

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS