Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

OH & UG Line Work: City of Washougal - Evergreen Way & 32nd St

Open
733State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

Clark Public Utilities is soliciting bids for the OH & UG Line Work project located at Evergreen Way & 32nd St in the City of Washougal, Washington. The scope of work comprises overhead installations, including 11 transmission poles with distribution underbuild, 10 distribution poles, various switches, anchors, and AAC wire, as well as underground work involving trenching, boring, and the installation of conduits, primary conductors, and fiber optic infrastructure. The project requires strict adherence to technical specifications, such as using 100% crushed rock backfill for poles and ensuring guy/anchor installations are perpendicular to the BNSF Railway. The contract will be awarded to the low responsible bidder. To be eligible, contractors must be prequalified by Clark Public Utilities for the construction or improvement of electrical facilities per RCW 54.04.085. Responsible bidders must possess a current Washington Unified Business Identifier (UBI) number, maintain industrial insurance and state excise tax registration, and comply with Washington state apprenticeship utilization requirements. Bids must be submitted via ProcureWare or as a sealed physical package by December 8, 2026. Required documentation includes a Bid Form, and the successful bidder must provide payment, performance, and retainage bonds. There is no specified set-aside status for this solicitation.

General Info

Bids for overhead and underground electrical line work in Washougal, Washington.

Documents

10
PDF, High priority: read this firstspecifications
High
PDF, High priority: read this firstspecifications
High
PDF, High priority: read this firstspecifications
High
PDF, High priority: read this firstspecifications
High
PDF, High priority: read this firstrfb
High
PDF, High priority: read this firstspecifications
High
PDF, High priority: read this firstspecifications
High
PDF, High priority: read this firstspecifications
High
PDF, Low prioritycertification-form
Low
PDF, Low prioritycertification-form
Low

Read all 10 documents

Due in 20 days

Every page of every file, in your free workspace.

Read the documents

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown
Due in 20 days

Everything you need to bid on this one

Open the full contract in your free workspace.

  • 10 solicitation documentsRead every page
  • AI contract breakdown13 sections, Uniform Contract Format
Open the full contract

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

1 update
PhaseSolicitation
Posted

Solicitation

Notice updated

The notice description changed.

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyWashington → Clark Public Utilities
ContactsNo contacts available
OfficeWA, USA
Office AddressWA, USA
ContactsNo contact information available

Full Description

Show more
Return to Bid List Bid NUMBER B733 TITLE OH & UG Line Work: City of Washougal - Evergreen Way & 32nd St PROCESS One Step Unsealing BASE CURRENCY USD STATUS Open for Bidding CLOSES IN 19 days: 19 hours: 48 minutes: 42 seconds DESCRIPTION BID DOCUMENTS BIDDERS CALENDAR
You must log in to register for Bid Events and to view Bid Question and Response information.
NUMBER B733 TITLE OH & UG Line Work: City of Washougal - Evergreen Way & 32nd St AVAILABLE DATE 11/18/2026 11:23 AM DUE DATE 12/8/2026 11:00 AM CONTACT INFORMATION BID TYPE Contractor Services - Public DESCRIPTION
The project includes the following work: Overhead work includes installation of (11) transmission poles with distribution underbuild,(10) distribution poles and framing, (3) pole mount distribution switches, (3) guy stub poles, (26) anchors, 2,000 circuit feet of (3) 795 AAC wire, 2,200 circuit feet of (3) 397AAC wire with (1) 2/0 neutral, 100 conductor feet of 2/0ACSR, 200 linear feet of single-phase #2ACSR, 470 conductor feet of #6 duplex, (13) span guys, (13) spans of secondary conductor,  (5) single-phase transformers, (1) 3-phase bank of transformers, and transferring or removal of facilities and top/abandon distribution/transmission poles per design.
Underground work includes trenching and/or boring in City of Washougal ROW and installing conduits, installing and energizing approx. 120 linear feet of (3) jacketed 1000MCM AL primary conductor, 245 linear feet of (3) 1/0 AL primary conductor, 190 linear feet of (1) jacketed 1/0 AL primary conductor, 275 linear feet of conduit for fiber optics, risers, junction boxes, secondary pedestal, secondary conduits, fiber vaults, and other work as more fully described in the Summary of Work.
BID CATEGORIES (2 records) CODE TITLE FULL NAME 010 Electrical Work >600v, OH & UG Trans. & Dist., Substation Construction 01 Contractor Services > 010 Electrical Work >600v, OH & UG Trans. & Dist., Substation Construction 200 UG Utilities Boring 01 Contractor Services > 200 UG Utilities Boring

Similar Contracts

Same NAICS industry code

NAICS: 237130
New
ACT-1427-00 Construction Cycle 10 (CC10) Concrete Test Pavement Construction at Wm. J. Hughes Technical Center Atlantic City, NJ
Solicitation # act-1427-00-construction-cycle-10-cc10-concrete-test-pavement-construction-wm-j-hughes-technical
This contract is for the Construction Cycle 10 concrete test pavement project at the William J. Hughes Technical Center in Atlantic City, New Jersey, supporting the Federal Aviation Administration's Pavement Research and Development Section. The scope of work involves the controlled demolition of existing pervious runway test pavement and the construction of new concrete test slabs and pavement structures, measuring approximately 310 feet by 52.5 feet with a thickness of 15.5 inches. The contractor is responsible for providing aggregate subbase, updating the asphalt base course to a stabilized drainable base, and performing minor design adjustments to plans and specifications. The project includes comprehensive material characterization tests, such as California Bearing Ratio and Plate Load tests, and requires the procurement of materials and the removal of construction waste. Professional services for geotechnical design, inspection, and roadway materials testing laboratories are also required. Work is generally scheduled for normal business hours, Monday through Friday, from 6:00 a.m. to 6:00 p.m. This opportunity is set aside for Small Business (SB), SBA certified Veteran Owned Small Business (VOSB), SBA certified Service-Disabled Veteran Owned Small Business (SDVOSB), SBA certified Women-Owned Small Business (WOSB), and SBA certified HUBZone Small Business (HUBZone SB).
Parsons Corporation

POSTED

about 6 hours ago

DEADLINE

in 2 months
View Details
NAICS: 237130
New
SLED
Phase 2 – Transit Electrification
Solicitation # C02507
The City of Santa Rosa's Transportation and Public Works Department is soliciting bids for the Phase 2 Transit Electrification project, identified as solicitation C02507. The scope of work involves the installation and construction of Electric Vehicle Supply Equipment at the Municipal Services Center South Corporate Yard located at 55 Stony Point Road. The project includes the installation of five ABB 391kW triple port chargers designed to support 13 electric transit buses and 13 medium duty vehicles. Key deliverables include the provision of as-built plans in PDF format, commissioning documentation, and performance testing records. All work must adhere to the State Building Code and specific UL standards for programmable components, AC to DC charging equipment, and personnel protection systems. The procurement process requires a bid bond of 10% of the maximum bid amount, with the successful contractor required to provide performance and payment bonds for 100% of the contract price. Financial terms include a 5% retention on progress payments and a requirement for monthly invoicing that details expenditures from GGRF and SB 1 funds. The project is subject to California prevailing wage laws and strict compliance with the Global Warming Solutions Act of 2006, requiring quarterly TIRCP and semi-annual CARB reporting. Evaluation for award is based on a competitive process prioritizing greenhouse gas emission reductions and ridership increases. Bidders must submit sealed proposals to the Transportation and Public Works Department office by the December 15, 2026 deadline.
Transportation and Public Works Department of City of Santa Rosa

POSTED

about 14 hours ago

DEADLINE

in 27 days
View Details
NAICS: 237130
New
SLED
Copper Replacement Project
Solicitation # PE-66397-NONST-2027-000000019
The City of Sylvania is soliciting sealed bids for the Copper Replacement Project to enhance the reliability and resilience of its electrical distribution system in Georgia. The scope of work involves replacing approximately 3.9 miles of overhead copper electrical conductor with 1 AWG aluminum wire and replacing roughly 95 failing electrical distribution poles. The selected contractor will be responsible for all labor, equipment, installation, removal, testing, and commissioning, including the upgrade of connectors, insulators, crossarms, and grounding components. The project requires strict coordination with the City to maintain service continuity during planned outages and necessitates final system testing to verify proper load distribution and functionality. Bids must be submitted by January 13, 2027, and will be evaluated based on total project cost, relevant electrical distribution experience, the ability to meet the schedule, references from at least three similar projects, and overall responsiveness. Required documentation includes proof of Georgia licensing, E-Verify compliance, and a non-collusion affidavit. Financial guarantees include a bid bond of at least 10% of the total bid, with 100% performance and payment bonds required upon award. Additionally, if the project is federally funded, the contractor must comply with the Davis-Bacon Act for prevailing wages and Build America, Buy America (BABA) sourcing requirements.
City of Sylvania

POSTED

1 day ago

DEADLINE

in about 2 months
View Details
NAICS: 237130
New
SLED
Wood Pole Inspection, Treatment, Repair, and UAV Inspection Services
Solicitation # 2026-RFP-0272
The City of Pasadena Water and Power Department is soliciting proposals for professional wood pole inspection, treatment, repair, and UAV inspection services for its electric distribution system. The scope of work involves approximately 11,000 wood poles and includes visual, intrusive, and below-ground inspections to identify decay, mechanical damage, and safety hazards. Selected contractors will provide preservative treatments, minor field repairs, and reinforcement work, while utilizing FAA-compliant drone services for high-resolution imagery of pole tops and difficult-access areas. All activities must adhere to CPUC General Orders 95 and 165, with hazardous conditions reported to the city within 24 hours. The contract features an initial four-year term with two optional one-year extensions. Award selection is based on a weighted scoring system that evaluates technical approach, qualifications, safety and quality control, data management, and UAV capabilities, with cost accounting for 30 percent of the total score. Proposers must submit a technical proposal and a separate price proposal via the city's eProcurement portal. Key requirements include compliance with California Prevailing Wage laws, the provision of a comprehensive quality assurance plan, and strict prohibitions against using city data to train AI or machine learning models.
Water & Power Department, Power Delivery

POSTED

2 days ago

DEADLINE

in 14 days
View Details

More opportunities from Washington → Clark Public Utilities

Same awarding agency

NAICS: 334514
New
SLED
AMI-Enabled Water Meters
Solicitation # RFP509
Clark Public Utilities is seeking proposals for an annual supply of AMI-enabled water meters compatible with the Sensus FlexNet 522M water module and Sensus UI-1203 communications protocol. This best value procurement, conducted under RCW 39.04.270, requires meters with specific technical capabilities, including a minimum nine-digit read/storage capacity, 20-year battery life, and real-time alerts for leaks, backflow, and burst pipes. The hardware must be NSF 61 certified, feature unique 13-digit identification numbers, and be delivered with preinstalled encoder/registers and factory accuracy test results. The resulting contract will have an initial term of two years with the option for three one-year extensions. Pricing must remain firm for the first 12 months, with proposed annual escalations for the subsequent four years. Award criteria are prioritized by the ability to meet technical requirements, experience and reputation, and total lifecycle cost. The successful supplier must provide a performance bond for 100 percent of the contract award amount plus Washington State Sales Tax within ten business days of execution. Proposals are due by 2:00 PM PDT on December 22, 2026, and must include a cover letter, completed requirements and pricing workbooks, a signed certification page, and the supplier's standard commercial agreement.
Totalizing Fluid Meter and Counting Device Manufacturing

POSTED

7 days ago

DEADLINE

in about 1 month
View Details

Get AI-powered intelligence on this solicitation and the ones like it

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS