North South Transmission Systems Interconnection

Open
1017485International

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The North South Transmission System Interconnection Project, managed by the Saskatchewan Power Corporation, aims to connect SaskPower's northern and southern grid systems to eliminate the current reliance on wheeling power through Manitoba Hydro. The project involves the construction of two parallel transmission lines spanning approximately 250 kilometres, running from the E.B. Campbell Switching Station to the Island Falls Switching Station. This infrastructure will traverse the boreal plain, shield ecosites, and western portions of the Saskatchewan River Delta, areas characterized by limited or no road access. Additionally, the scope includes building a new eight position 230 kV switching station south of the E.B. Campbell facility. This solicitation, identified by number 1017485, emphasizes the need for reliable power supply to meet forecast demand in the far north and a commitment to transparent engagement with the public and Indigenous communities. Interested parties can access the opportunity and any subsequent amendments via Merx. The response deadline for this solicitation is December 14, 2026, with the primary point of contact being Aayoush Neupane.

General Info

SaskPower project building 250km transmission lines and switching station by December 2026.

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Due in 27 days

Get what you need to respond

No documents were posted with this contract.

  • Buyer contactEmail and phone
  • Original solicitationLink to the source posting
Get the buyer contact

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencySaskatchewan Public Sector → Saskatchewan Power Corporation
Contacts1 person available
OfficeN/A

Full Description

Show more
Currently SaskPower’s northern and southern grid systems are not connected, and power is “wheeled” through Manitoba in partnership with Manitoba Hydro. SaskPower is exploring new transmission lines to connect its northern and southern transmission systems to improve the supply of reliable and safe power to the far north to meet forecast demand in the northern region. This is a complex project, and SaskPower is committed to meaningful and transparent engagement with Indigenous communities and the public. SaskPower is considering two parallel approximately 250-kilometre transmission lines to connect the northern and southern systems. In addition to the two new lines, the project is expected to include the construction of a new eight position 230 kV switching station south of E.B. Campbell switching station with the northern terminal point tying into existing E.B. Campbell switching station. The proposed transmission lines would start near the E.B. Campbell Switching Station and connect to the northern grid at the Island Falls Switching Station. To do this, SaskPower would need to build the lines through western portions of the Saskatchewan River Delta and through the boreal plain and shield ecosites with limited or no road access. (all work collectively called the “Project”, the “North South Transmission System Interconnection Project”).
This opportunity is available for download at www.merx.com/saskpower, and all amendments, addenda, clarifications, and further instructions will also be posted on Merx.

Similar Contracts

Same NAICS industry code

NAICS: 237130
New
ACT-1427-00 Construction Cycle 10 (CC10) Concrete Test Pavement Construction at Wm. J. Hughes Technical Center Atlantic City, NJ
Solicitation # act-1427-00-construction-cycle-10-cc10-concrete-test-pavement-construction-wm-j-hughes-technical
Parsons Corporation is seeking a subcontractor for the Construction Cycle 10 project at the William J. Hughes Technical Center in Atlantic City, New Jersey, supporting the FAA Airport Technology Research and Development branch. The scope of work involves the controlled demolition of existing runway test pavement and the construction of new concrete test slabs measuring approximately 310 by 52.5 feet with a thickness of 15.5 inches. Key technical requirements include providing aggregate subbase, updating the asphalt base course to a stabilized drainable base, and performing minor design adjustments to plans and specifications. The project requires the subcontractor to manage material procurement, waste removal, and the integration of professional testing laboratories and geotechnical engineering services. Construction will be subject to rigorous material characterization tests, including California Bearing Ratio and Plate Load tests, with critical operations phased to allow for continuous subgrade adjustments. Work is primarily scheduled for normal business hours, Monday through Friday, though some after-hours and weekend work may be required. This solicitation is set aside for various small business categories, including VOSB, SDVOSB, WOSB, and HUBZone certified firms.
Parsons Corporation

POSTED

about 3 hours ago

DEADLINE

in 2 months
View Details
NAICS: 237130
New
SLED
Copper Replacement Project
Solicitation # PE-66397-NONST-2027-000000019
The City of Sylvania is soliciting sealed bids for the Copper Replacement Project to enhance the reliability and resilience of its electrical distribution system in Georgia. The scope of work involves replacing approximately 3.9 miles of overhead copper electrical conductor with 1 AWG aluminum wire and replacing roughly 95 failing electrical distribution poles. The selected contractor will be responsible for all labor, equipment, installation, removal, testing, and commissioning, including the upgrade of connectors, insulators, crossarms, and grounding components. The project requires strict coordination with the City to maintain service continuity during planned outages and necessitates final system testing to verify proper load distribution and functionality. Bids must be submitted by January 13, 2027, and will be evaluated based on total project cost, relevant electrical distribution experience, the ability to meet the schedule, references from at least three similar projects, and overall responsiveness. Required documentation includes proof of Georgia licensing, E-Verify compliance, and a non-collusion affidavit. Financial guarantees include a bid bond of at least 10% of the total bid, with 100% performance and payment bonds required upon award. Additionally, if the project is federally funded, the contractor must comply with the Davis-Bacon Act for prevailing wages and Build America, Buy America (BABA) sourcing requirements.
City of Sylvania

POSTED

about 11 hours ago

DEADLINE

in about 2 months
View Details
NAICS: 237130
New
SLED
Wood Pole Inspection, Treatment, Repair, and UAV Inspection Services
Solicitation # 2026-RFP-0272
The City of Pasadena Water and Power Department is soliciting proposals for professional wood pole inspection, treatment, repair, and UAV inspection services for its electric distribution system. The scope of work involves approximately 11,000 wood poles and includes visual, intrusive, and below-ground inspections to identify decay, mechanical damage, and safety hazards. Selected contractors will provide preservative treatments, minor field repairs, and reinforcement work, while utilizing FAA-compliant drone services for high-resolution imagery of pole tops and difficult-access areas. All activities must adhere to CPUC General Orders 95 and 165, with hazardous conditions reported to the city within 24 hours. The contract features an initial four-year term with two optional one-year extensions. Award selection is based on a weighted scoring system that evaluates technical approach, qualifications, safety and quality control, data management, and UAV capabilities, with cost accounting for 30 percent of the total score. Proposers must submit a technical proposal and a separate price proposal via the city's eProcurement portal. Key requirements include compliance with California Prevailing Wage laws, the provision of a comprehensive quality assurance plan, and strict prohibitions against using city data to train AI or machine learning models.
Water & Power Department, Power Delivery

POSTED

1 day ago

DEADLINE

in 15 days
View Details
NAICS: 237130
New
International
314E-2026 132-11 kV MAIN SUBSTATIONS AT AJMAN CITY (ACMN) IN AJMAN AREA AND 132-11 KV AWAFI (AWMN) IN RAK AREA, AND 132KV UNDERGROUND CABLING WORKS
Solicitation # 314E/2026
Etihad Water & Electricity has issued solicitation 314E/2026 for a lump-sum turnkey project involving the design, engineering, supply, construction, installation, testing, and commissioning of 132/11kV main substations and associated 132kV underground cabling works in the United Arab Emirates. The scope of work is divided into several key components, including the construction of new main substations at Ajman City (ACMN) and Awafi (AWMN), protection modifications for BYMN-SAMN, and LILO connections for both ACMN and AWMN. Additionally, the project includes approximately 22 km of new 132kV underground cabling works for BYMN-SAMN and approximately 5 km of LILO connections for AWMN. Eligible bidders must be registered in the SAP Ariba e-procurement system and hold a valid EtihadWE Prequalification Certificate, a requirement that also extends to all proposed subcontractors for electrical, civil, MEP, and underground cable works. Proposals must be submitted via SAP Ariba with separate technical and commercial uploads by December 14, 2026. Each quoted lot must be accompanied by an irrevocable and unconditional bank guarantee issued by a UAE-based bank, valid for at least 180 days from the tender opening date. All works must adhere to EtihadWE standards and specifications.
Etihad Water & Electricity

POSTED

1 day ago

DEADLINE

in 26 days
View Details

More opportunities from Saskatchewan Public Sector → Saskatchewan Power Corporation

Same awarding agency

Get AI-powered intelligence on this solicitation and the ones like it

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS