Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

Copper Replacement Project

Open
PE-66397-NONST-2027-000000019State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The City of Sylvania is soliciting sealed bids for the Copper Replacement Project to enhance the reliability and resilience of its electrical distribution system in Georgia. The scope of work involves replacing approximately 3.9 miles of overhead copper electrical conductor with 1 AWG aluminum wire and replacing roughly 95 failing electrical distribution poles. The selected contractor will be responsible for all labor, equipment, installation, removal, testing, and commissioning, including the upgrade of connectors, insulators, crossarms, and grounding components. The project requires strict coordination with the City to maintain service continuity during planned outages and necessitates final system testing to verify proper load distribution and functionality. Bids must be submitted by January 13, 2027, and will be evaluated based on total project cost, relevant electrical distribution experience, the ability to meet the schedule, references from at least three similar projects, and overall responsiveness. Required documentation includes proof of Georgia licensing, E-Verify compliance, and a non-collusion affidavit. Financial guarantees include a bid bond of at least 10% of the total bid, with 100% performance and payment bonds required upon award. Additionally, if the project is federally funded, the contractor must comply with the Davis-Bacon Act for prevailing wages and Build America, Buy America (BABA) sourcing requirements.

General Info

Sylvania seeks bids to replace electrical conductors and poles for system reliability.

Documents

3
PDF, High priority: read this firstifb
High
PDF, High priority: read this firstspecifications
High
DOCX, High priority: read this first1 page · specifications
High

Read all 3 documents

Due in 57 days

Every page of every file, in your free workspace.

Read the documents

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown
Due in 57 days

Everything you need to bid on this one

Open the full contract in your free workspace.

  • 3 solicitation documentsRead every page
  • AI contract breakdown13 sections, Uniform Contract Format
  • Buyer contactEmail and phone
Open the full contract

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyGeorgia → City of Sylvania
Contacts1 person available
OfficeN/A

Full Description

Show more
The City of Sylvania is soliciting sealed bids from qualified contractors for the replacement of approximately 3.9 miles of existing overhead copper electrical conductor with 1 AWG aluminum wire and the replacement of approximately 95 failing electrical distribution poles, together with associated electrical distribution hardware upgrades. The project is intended to improve the reliability and resilience of the City of Sylvania's electrical distribution system. The contractor will be responsible for all labor, equipment, installation, removal, testing, commissioning, and related services necessary to complete the project in accordance with the bid documents and applicable requirements.

Similar Contracts

Same NAICS industry code

NAICS: 237130
New
ACT-1427-00 Construction Cycle 10 (CC10) Concrete Test Pavement Construction at Wm. J. Hughes Technical Center Atlantic City, NJ
Solicitation # act-1427-00-construction-cycle-10-cc10-concrete-test-pavement-construction-wm-j-hughes-technical
Parsons Corporation is soliciting bids for the Construction Cycle 10 project at the William J. Hughes Technical Center in Atlantic City, New Jersey, to support the FAA Airport Technology Research and Development branch. The scope of work involves the controlled demolition of existing pervious runway test pavement and the construction of new concrete test slabs measuring approximately 310 feet by 52.5 feet with a thickness of 15.5 inches. The selected subcontractor will be responsible for providing aggregate subbase, updating the asphalt base course to a stabilized drainable base, and performing minor design adjustments to plans and specifications. The project requires the integration of material characterization tests, including California Bearing Ratio, Plate Load, and Dynamic Cone Penetrometer tests, with critical operations phased to allow for continuous subgrade adjustments. The subcontractor must manage all material procurement, delivery, and the removal of construction waste and debris. Additionally, the contract encompasses professional engineering services for geotechnical design and inspection, as well as roadway materials testing. Work is primarily scheduled for normal business hours, Monday through Friday, though some after-hours and weekend work may be required. This opportunity is set aside for various small business categories, including VOSB, SDVOSB, WOSB, and HUBZone certified firms.
Parsons Corporation

POSTED

about 3 hours ago

DEADLINE

in 2 months
View Details
NAICS: 237130
New
SLED
Wood Pole Inspection, Treatment, Repair, and UAV Inspection Services
Solicitation # 2026-RFP-0272
The City of Pasadena Water and Power Department is soliciting proposals under solicitation 2026-RFP-0272 for comprehensive wood pole inspection, treatment, repair, and UAV inspection services. The project covers approximately 11,000 wood poles within a 23-square-mile electric distribution system to ensure structural integrity and regulatory compliance with CPUC General Orders 95 and 165. The scope of work includes ground-based visual and intrusive inspections, the application of EPA-registered preservatives and fumigants, and the use of FAA-compliant drone services to capture high-resolution imagery of pole tops and overhead facilities. Hazardous conditions must be reported to the city within 24 hours. The resulting contract will have an initial term of four years with two optional one-year extensions. Award selection is based on a points-weighted system evaluating technical approach, qualifications, safety, and price, with a 5-point preference for local Pasadena businesses or certified small/micro-businesses. Proposers must submit a technical proposal not exceeding 50 pages and a separate price proposal via the city's eProcurement Portal by November 19, 2026. Mandatory requirements include compliance with California Prevailing Wage laws, submission of various city-specific forms such as Form AA-1 and a Declaration of Non-Collusion, and strict prohibitions against using city data to train AI or machine learning models.
Water & Power Department, Power Delivery

POSTED

about 19 hours ago

DEADLINE

in 15 days
View Details
NAICS: 237130
New
International
314E-2026 132-11 kV MAIN SUBSTATIONS AT AJMAN CITY (ACMN) IN AJMAN AREA AND 132-11 KV AWAFI (AWMN) IN RAK AREA, AND 132KV UNDERGROUND CABLING WORKS
Solicitation # 314E/2026
Etihad Water & Electricity has issued solicitation 314E/2026 for a lump-sum turnkey project involving the design, engineering, supply, construction, installation, testing, and commissioning of 132/11kV main substations and associated 132kV underground cabling works in the United Arab Emirates. The scope of work is divided into several key components, including the construction of new main substations at Ajman City (ACMN) and Awafi (AWMN), protection modifications for BYMN-SAMN, and LILO connections for both ACMN and AWMN. Additionally, the project includes approximately 22 km of new 132kV underground cabling works for BYMN-SAMN and approximately 5 km of LILO connections for AWMN. Eligible bidders must be registered in the SAP Ariba e-procurement system and hold a valid EtihadWE Prequalification Certificate, a requirement that also extends to all proposed subcontractors for electrical, civil, MEP, and underground cable works. Proposals must be submitted via SAP Ariba with separate technical and commercial uploads by December 14, 2026. Each quoted lot must be accompanied by an irrevocable and unconditional bank guarantee issued by a UAE-based bank, valid for at least 180 days from the tender opening date. All works must adhere to EtihadWE standards and specifications.
Etihad Water & Electricity

POSTED

1 day ago

DEADLINE

in 26 days
View Details
NAICS: 237130
New
SLED
Solar Interconnection Grant
Solicitation # RFA-131767
The Solar Interconnection Grant Program, administered by the Virginia Department of Energy, provides funding to public bodies to offset the costs of connecting distributed solar energy systems to the electric grid. Established via Senate Bill 659 and House Bill 683, the program targets barriers to public-sector solar development by funding infrastructure upgrades, including transformers, relays, SCADA/telemetry, protection equipment, metering modifications, and necessary engineering services. Eligible projects may be behind-the-meter or front-of-the-meter and must be located at previously developed project sites. The anticipated period of performance ranges from 6 to 18 months. Applications must be submitted through the Virginia Energy Grant Portal by January 15, 2027. Awards are competitive and based on a 100-point scoring system that evaluates organizational summaries, project scope, readiness, interconnection details, and community benefits. Applicants must adhere to strict word counts and submit a master PDF and two Excel files. Grant recipients must comply with Virginia procurement laws and prevailing wage requirements mirroring federal Davis-Bacon standards. Administration requires monthly invoicing by the 15th of each month, quarterly progress reports, and final verification via equipment lists and photos. Payments are issued upon agency acceptance of work, with a potential 5% retainage for construction projects and a final audit before closing.
Virginia Department of Energy

POSTED

2 days ago

DEADLINE

in about 2 months
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS