Steel Casing Supply & Installation

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract opportunity, issued by the Contracts and Procurement Department of the Southern California Regional Rail Authority, involves the supply and installation of steel casings. The scope of work focuses on providing these casings for utilities or structural supports to prime contractors operating on SCRRA and Metrolink projects. The solicitation was posted on October 9, 2026, with a response deadline set for November 23, 2026. Classified under NAICS code 237110, the contract requires the successful bidder to manage both the delivery and the installation of the steel casings to meet project specifications.

General Info

SCRRA subcontract for supply and installation of steel casings by November 23, 2026.

Documents

This scope was carved out of C3174-27.

The full solicitation package (48 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Arroyo Simi 4 Rural Bridges Rehabilitation & Scour Mitigation Project

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyContracts & Procurement Department of Southern California Regional Rail Authority
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Supplies and installs steel casings for utilities or structural supports for prime contractors on SCRRA/Metrolink projects. Delivers installed steel casings.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project for the City of Belmont in North Carolina involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and extensive upgrades to the existing Morgans Branch Pumping Station. Key infrastructure work includes the installation of a new wet well, valve vault, and associated appurtenances, as well as the demolition of existing pumps and piping. The scope further encompasses the installation of mechanical and electrical systems, including pumps, a generator, and odor control equipment, along with gravity sewers, manholes, stormwater facilities, and site restoration. The project has an estimated value of 16,690,000 dollars and a substantial completion timeline of 560 calendar days. This solicitation, identified as SRP-W-134-0290, is a unit price contract awarded to the responsible bidder submitting the lowest responsive bid. Bidders must provide a completed EJCDC C-410 Bid Form, a bid bond, and evidence of authority to sign, while also demonstrating good faith efforts toward MWBE goals. The contract requires performance and payment bonds and adherence to strict technical standards, including AWWA Specification C-600 for pipelines and NEMA standards for motors. Payment is processed via monthly applications for payment, with funds becoming due 30 days after presentation to the owner. The project is set aside for small businesses, including certified veteran-owned, women-owned, and HUBZone small businesses.
Don Moorhead Construction, Inc.

POSTED

28 minutes ago

DEADLINE

in 12 days
View Details
NAICS: 237110
New
Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 in CA
Solicitation # main-wastewater-treatment-plant-secondary-reactors-rehabilitation-phase-2-ca
Garney Pacific, Inc. is seeking quotes from qualified subcontractors for the Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 project located in Oakland, California, for the East Bay Municipal Utility District. The comprehensive scope of work involves the rehabilitation of covered and open concrete structures, including the installation of platforms and access improvements. Mechanical and piping requirements include the relining, modification, or replacement of small and large diameter steel and ductile iron pipes, associated supports, valves, and piping appurtenances. Additionally, the project requires the installation and operation of a temporary 11 MGD pumped bypass, the rehabilitation of reactor mixers and aerators, and the rerouting of sump pump discharge lines. Electrical and instrumentation work includes the installation of new or improved instrumentation, the rehabilitation and replacement of motor control center components, and modifications to existing sluice gates alongside the installation of new slide gates. The project also involves excavation, trench work, and surveying of key points around the reactors. This is a union project, and all subcontractors must utilize union labor. Potential subcontractors must be prepared to provide a 100 percent Payment and Performance Bond from a US Treasury listed Surety Company, providing their bond rate at the time of the bid for reimbursement. Quotes are due by November 17, 2026, with the final bid date set for November 18, 2026. This opportunity is set aside for small businesses, including certified VOSB, SDVOSB, WOSB, and HUBZone firms.
Garney Pacific, Inc.

POSTED

28 minutes ago

DEADLINE

in 20 days
View Details
NAICS: 237110
New
IEUA RP-5 Offsite Facilities Project No. EN19001.03 and Butterfield Lift Station Improvements Project No. EN26054
Solicitation # EN19001.03 / EN26054
Filanc is soliciting quotes for the IEUA RP-5 Offsite Facilities (Project No. EN19001.03) and Butterfield Lift Station Improvements (Project No. EN26054) located in Chino and Chino Hills, California. The comprehensive scope of work involves significant wastewater infrastructure improvements, including the installation of approximately 6,200 linear feet of 14 to 16-inch diameter HDPE DR 11 dual force mains from El Prado Road to Kimball Avenue. Additionally, the project requires the construction of a new Mountain Avenue Lift Station featuring a concrete wet well and submersible pumps, modifications to the RP-2 Lift Station to include an elevated electrical platform and standby generator, and the replacement of the motor control center, pumps, and motors at the Butterfield Lift Station while maintaining continuous operation. Filanc is seeking quotes from various trades, including SWPPP, survey, aggregates, demolition, paving, precast concrete, masonry, metals, coatings, process equipment, fire suppression, piping, and electrical and instrumentation and control. This solicitation is open to small businesses, including SDB, WOSB, HUBZone, and VOSB certifications, with a strong emphasis on equal opportunity and DBE participation. Bids are due by 2:00 PM on October 29, 2025. The primary point of contact for this opportunity is Julia Masaitis.
Filanc

POSTED

28 minutes ago

DEADLINE

in about 11 hours
View Details

More opportunities from Contracts & Procurement Department of Southern California Regional Rail Authority

Same awarding agency

SLED
Arroyo Simi 4 Rural Bridges Rehabilitation & Scour Mitigation Project
Solicitation # C3174-27
The Southern California Regional Rail Authority is soliciting bids for the Arroyo Simi Four Rural Bridges Rehabilitation and Scour Mitigation Project on the Ventura County Line. The scope of work involves the rehabilitation of four rural bridges, including earthwork, channel excavation, structural rehabilitation such as the removal of concrete pile caps and construction of steel bracing and concrete encasement, and scour mitigation through the installation of riprap and geotextile fabric. The project serves critical rail infrastructure for Metrolink, Amtrak, and Union Pacific Railroad. The contract must be completed within 265 construction days, and the selected contractor is required to provide sufficient manpower to work on two bridges simultaneously. The contract will be awarded to the lowest responsive and responsible bidder. A key requirement for responsiveness is the proposal of a Project Manager who passes a strict evaluation based on having successfully led at least three projects of similar scope within the last five years. The project is subject to stringent federal and state regulations, including the Buy America and Build America, Buy America Act for steel and iron, California prevailing wage requirements, and 2 CFR part 200 federal contract provisions. Contractors must also comply with Cal/OSHA and EPA standards for lead-based paint and provide performance and payment bonds. Bids are due by November 23, 2026, via the Authority's solicitation portal.

POSTED

20 days ago

DEADLINE

in 26 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS