Steel Supply and Shade Structure Installation

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract agreement involves the supply and installation of structural steel and protective shade structures for wastewater treatment plant projects managed by the City of Bakersfield. The scope of work specifically requires the fabrication and installation of steel supply boards and a control panel shade structure, strictly adhering to drawings S201 and S501 and established structural welding and fabrication standards. The project is located in Bakersfield, California, within the 93313 zip code. Interested parties must respond by October 29, 2026, to provide the necessary deliverables, which include the fully installed steel supply boards and the completed control panel shade structure.

General Info

Subcontract for structural steel and shade structure installation for Bakersfield wastewater treatment plants.

Place of Performance

Bakersfield, CA, 93313, USA

Set-Aside

NONE

Documents

This scope was carved out of 20261019022.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Wastewater Treatment Plants No. 2 And 3 Septage Receiving Station Improvements

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → CITY OF BAKERSFIELD
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Supplies and installs structural steel and protective shade structures for prime contractors on City of Bakersfield wastewater treatment plant projects. Fabricates and installs steel supply boards and a control panel shade structure per drawings S201 and S501. Utilizes structural welding and fabrication standards. Delivers installed steel supply boards and a completed control panel shade structure.

Similar Contracts

Same NAICS industry code

More opportunities from California → CITY OF BAKERSFIELD

Same awarding agency

NAICS: 237110
New
SLED
Wastewater Treatment Plants No. 2 And 3 Septage Receiving Station Improvements
Solicitation # 20261019022
The City of Bakersfield is soliciting bids for the Wastewater Treatment Plants No. 2 and 3 Septage Receiving Station Improvements project, identified as Bid #25WDWW03. The scope of work involves upgrading and modifying existing infrastructure and equipment at both facilities to enhance septage receiving capabilities. Key technical requirements include the installation of a new 480V, 3-phase, 3-wire power distribution panel and new conductors, utilizing existing conduits. The project specifies the use of Schedule 80 concrete pipe, Grinnell adjustable pipe saddle supports, and half-round rigid insulation with protection shields. Additionally, contractors must provide Class I Div. 1 seals for conduits entering or leaving rated areas and ensure that classified areas extend three feet beyond vents, hatches, and openings. The project is located in Bakersfield, California, with site access restricted to Mt. Virginia Ave and Lavoyon Rd. Contractors are required to follow a designated access route to maintain operational access for plant staff. Upon completion, the work must pass an owner-witnessed start-up test to verify proper installation and functionality, with any identified issues corrected by the contractor at no additional cost. All installations must comply with local code books and the contractor is responsible for repairing any damage to existing improvements to a condition similar to or better than the original state. The response deadline for this solicitation is October 29, 2026.
Water and Sewer Line and Related Structures Construction

POSTED

about 16 hours ago

DEADLINE

in 9 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS