Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

Wastewater Treatment Plants No. 2 And 3 Septage Receiving Station Improvements

Active
20261019022State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The City of Bakersfield is soliciting bids for the Wastewater Treatment Plants No. 2 and 3 Septage Receiving Station Improvements project, identified as Bid #25WDWW03. The scope of work involves upgrading and modifying existing infrastructure and equipment at both facilities to enhance septage receiving capabilities. Key technical requirements include the installation of a new 480V, 3-phase, 3-wire power distribution panel and new conductors, utilizing existing conduits. The project specifies the use of Schedule 80 concrete pipe, Grinnell adjustable pipe saddle supports, and half-round rigid insulation with protection shields. Additionally, contractors must provide Class I Div. 1 seals for conduits entering or leaving rated areas and ensure that classified areas extend three feet beyond vents, hatches, and openings. The project is located in Bakersfield, California, with site access restricted to Mt. Virginia Ave and Lavoyon Rd. Contractors are required to follow a designated access route to maintain operational access for plant staff. Upon completion, the work must pass an owner-witnessed start-up test to verify proper installation and functionality, with any identified issues corrected by the contractor at no additional cost. All installations must comply with local code books and the contractor is responsible for repairing any damage to existing improvements to a condition similar to or better than the original state. The response deadline for this solicitation is October 29, 2026.

General Info

Bakersfield seeks bids for infrastructure and equipment upgrades at two wastewater treatment plants.

Place of Performance

Bakersfield, CA, 93313, USA

Set-Aside

NONE

Documents

1

Wastewater Treatment Plants Septage Receiving Station Plans

PDF, Low priorityplans
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → CITY OF BAKERSFIELD
Contacts1 person available
OfficeN/A
Office AddressN/A

Full Description

Show more
Bid #25WDWW03, E3K30400: The project involves improvements to the Septage Receiving Stations at Wastewater Treatment Plants No. 2 and No. 3 in Bakersfield, California. This includes upgrades and modifications to the existing infrastructure and equipment at both facilities to enhance their septage receiving capabilities. Contractors are strongly recommended to attend the non-mandatory site visit to both plants to understand the scope of work.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, solicitation number SRP-W-134-0290, is a construction contract for the City of Belmont, North Carolina, with an estimated value of 16,690,000 dollars. The scope of work involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and comprehensive upgrades to the Morgans Branch Pumping Station. Key infrastructure improvements include the installation of a new wet well, valve vault, and associated appurtenances, as well as the demolition of existing pumps and piping. The contractor is responsible for delivering a fully operational facility, including the installation of pumps, a generator, odor control equipment, new gravity sewers, and manholes, while managing by-pass pumping, testing, and commissioning. The contract will be awarded to the responsible bidder submitting the lowest responsive bid, with a strong emphasis on MWBE compliance through the submission of Good Faith Efforts and Table A documentation. Bids are due by November 12, 2026, and must be submitted using the EJCDC C-410 Bid Form. The project is governed by EJCDC standard general and supplementary conditions, requiring performance and payment bonds and proof of insurance. Technical standards include AWWA Specification C-600 for pipelines, NEMA MG1 for motors, and AWS D1.2 for aluminum welding. Project administration is managed by the City of Belmont with Willis Engineers serving as the project engineer. Payment is processed via Applications for Payment, with terms set at 30 days after presentation to the owner.
Don Moorhead Construction, Inc.

POSTED

about 4 hours ago

DEADLINE

in 20 days
View Details

More opportunities from California → CITY OF BAKERSFIELD

Same awarding agency

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS