Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Department Of State was posted on August 22, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Steel Tower with glass facade for an elevator

Closed
19AU9025Q0021Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238190
New
SLED
Construction, CCSO Subsurface Water Intrusion
Solicitation # 2026-404
Collin County, Texas, has issued Invitation for Bid 2026-404 for the Construction, CCSO Subsurface Water Intrusion project. The contract involves providing all labor, supervision, materials, and equipment to repair moisture-related deterioration at the lower level of the south side of a building, following previous unsuccessful waterproofing attempts. The project has a probable construction cost of 200,000 dollars, and for evaluation purposes, a 100,000 dollar allowance for unknowns is added to all bids. The contract will be awarded to the lowest and best responsible bidder based on compliance with requirements, completion time, bidder qualifications, and proposed subcontractors. The selected contractor must provide a performance bond, payment bond, and a two-year maintenance bond within ten days of the award, and demonstrate acceptable insurance coverage 24 hours before starting work. Performance requirements include adhering to the Construction General permit TXR150000 and MS4 permits, as well as providing a trench safety plan sealed by a Texas Professional Engineer. All materials must be delivered in original, unbroken packaging and stored on raised platforms to prevent moisture exposure. The project timeline begins ten calendar days after the Notice to Proceed, and the contractor must submit a detailed progress chart prior to that notice. Compliance with E-Verify and ADA regulations is mandatory, and failure to pay stipulated wage rates will result in a penalty of 60 dollars per day per worker.
Construction and Projects

POSTED

1 day ago

DEADLINE

in about 1 month
NAICS: 238190
New
SLED
Milpitas Sports Center Football Bleacher Replacement
Solicitation # 26-283
The City of Milpitas is soliciting bids for Project No. 3505, the Milpitas Sports Center Football Bleacher Replacement. This project involves the demolition and removal of existing football bleachers and associated footings, followed by the construction of new home bleachers and various site improvements. The comprehensive scope of work includes earthwork, grading, erosion and sediment control, concrete work, hardscape paving, fencing, gates, and electrical conduit routing and relocations. Additionally, the project requires significant ADA upgrades to parking areas, restrooms, and access ramps. The engineer's estimate for the base bid is between $1.2 million and $1.4 million. Eligible bidders must hold a Class A license from the Contractor's State License Board and comply with California prevailing wage laws for Santa Clara County. Sealed bids are due by 2:00 p.m. on November 19, 2026, and must be submitted to the City of Milpitas City Hall. Each bid must include a 10% bid security in the form of cash, a certified check, or a bid bond, along with a signed noncollusion declaration and certifications for workers' compensation and DIR registration. Mandatory pre-bid conferences are scheduled for October 29 and November 3, 2026. The contract will be awarded to the lowest responsive and responsible bidder based on the base bid alone.
Engineering (CIP)

POSTED

1 day ago

DEADLINE

in 29 days
NAICS: 238190
New
SLED
RFP 2027-10192026 School Building Exterior Inspection, Repair & Restoration
Solicitation # 2027-10192026
Shenandoah County Public Schools is soliciting proposals for a firm-fixed-price, turnkey contract to provide inspection, investigation, repair, and restoration of exterior insulation and finish systems (EIFS) for schools throughout the division, beginning with Stonewall Jackson High School. The scope of work includes moisture testing, documenting deficiencies, and the full removal and replacement of EIFS systems, including the installation of air/water-resistive barriers, insulation boards, and compatible sealants. Additional requirements cover the restoration of covered entrance vestibules, door awnings, and commercial caulking systems. All work must adhere to manufacturer specifications and the detailed requirements outlined in the solicitation attachments. Proposals are due by November 6, 2026, and will be evaluated based on experience and past performance (40 points), the proposed project schedule and ability to minimize school disruptions (20 points), and proximity to Woodstock, VA (10 points). Awarded contractors must provide comprehensive general liability and workers' compensation insurance, undergo criminal background checks for personnel, and adhere to strict non-discrimination and student privacy policies. Payment is issued net thirty days following the approval of invoices for work completed. Final acceptance is contingent upon the system being watertight and the submission of all closeout documentation and warranties.
Shenandoah County Public Schools

POSTED

2 days ago

DEADLINE

in 16 days
NAICS: 238190
New
SLED
Miramar College Pool Deck Replacement And Replaster Project
Solicitation # HH26270599
The San Diego Community College District is soliciting bids for the Miramar College Pool Deck Replacement and Replaster Project under solicitation number HH26270599. The scope of work involves comprehensive repairs to the competition and recreation pools, including replastering walls and bottoms, repairing cracks at the north end, and ensuring proper drainage through the repair of perimeter slot drains. Additionally, the project requires the removal and replacement of pool deck coatings, deck and bottom tiles, and coping tiles, as well as the demolition of existing one-meter and three-meter diving board cement bases to install new diving platforms and grade beams. The project is governed by the California Uniform Public Construction Cost Accounting Act and requires compliance with Title 24 regulations and Division of State Architect oversight. Bids must be submitted electronically via the PlanetBids Portal by 2:00 p.m. on November 10, 2026. The contract will be awarded to the lowest responsive and responsible bidder who possesses a valid Class A or B license, including a C-53 Swimming Pool Contractor license. Required submission documents include a bid bond of at least ten percent of the bid amount, a site visit certification, and CARB compliance certification. Awardees must provide a baseline schedule within ten days of the Notice to Proceed and adhere to mandatory participation in an Owner Controlled Insurance Program administered by Keenan & Associates. The base bid includes a project allowance of 170,000 dollars, and the contractor is required to comply with California prevailing wage laws and certified payroll reporting.
San Diego Community College District

POSTED

2 days ago

DEADLINE

in 20 days
NAICS: 238190
New
Federal
WWYK260004 - REPAIR STRUCTURAL INTEGRITY, B1134, POST 34 & NORTH WALL
Solicitation # FA813727R0001
Solicitation FA813727R0001 is a firm fixed price request for proposal for the repair of structural integrity at Building 1134, Post 34, and the North Wall at Tinker Air Force Base, Oklahoma. The project scope involves repairing or replacing eroded shear braces and the base of Post 34 to prevent potential failure. This opportunity is restricted exclusively to Tinker AFB MAC BOA holders, and attendance at the initial site visit on October 22, 2026, is mandatory for eligibility to propose. Interested prime contractors must RSVP by October 20, 2026, and provide an Entry Access List for any personnel requiring base access. The estimated magnitude of the construction is between $100,000 and $250,000, with a performance period of 195 calendar days from the notice to proceed. The acquisition will be awarded based on the Lowest Price Technically Acceptable (LPTA) process, where the award goes to the responsible offeror with a technically acceptable proposal and the lowest evaluated price. Technical evaluations will focus on capability and management, and any deficiency in a subfactor will render a proposal un-awardable. Proposals must be submitted in separate technical and price volumes, with pricing broken down by the CSI Master Format System. The contract is a total small business set-aside and is subject to the Davis-Bacon Act, Buy American Construction Materials requirements, and DFARS cybersecurity standards. Liquidated damages for delays are set at $227.75 per calendar day.
FA8137 Afsc Pzioc

POSTED

5 days ago

DEADLINE

in 27 days

AI Contract Overview

Show more

This contract involves the design, delivery, and assembly of a steel tower with a glass façade for an elevator at a U.S. Government-owned building in Vienna, Austria. The project aims to provide accessible vertical transportation from the main entrance to two upper floors, complying with the American Architectural Barriers Act (ABA) standards. The scope includes creating detailed workshop drawings, planning for factory and assembly processes, and coordinating the installation of the steel-glass structure, which will span approximately three floors and reach a height of around 10 meters. The contractor is responsible for ensuring all work aligns with ABA guidelines, including fire safety, thermal performance, sun protection, and sound insulation, and must coordinate closely with the general design team and elevator contractor. Additional responsibilities encompass managing outdoor weather protection measures such as dust walls, scaffolding, lifting platforms, and other site logistics, as well as overseeing commissioning and obtaining necessary safety and fire protection certificates. All contractors must be registered in the SAM database prior to submitting proposals, with project costs estimated between $100,000 and $250,000. The solicitation was posted on August 22, 2025, with a response deadline of September 8, 2025, and is managed by the Department of State’s Embassy Vienna office. Interested parties can find further details and submit proposals through the provided SAM.gov link.

General Info

Agency

Department Of State → Embassy Vienna

NAICS

238190 - Other Foundation, Structure, and Building Exterior Contractors

Place of Performance

Vienna, AT-9, AUT

Set-Aside

NONE

Documents

11

19AU9025Q0021 Attachment 3 SOW - Stahlkonstruktion und Glasfassade

PDF, High priority: read this firstsow
High

19AU9025Q0021 Attachment 3 - USE Elevator Integration SOW

PDF, High priority: read this firstsow
High

19AU9025Q0021 - Bilat CMR ABA Improvements Elevator QA-List

PDF, High priority: read this firstq-and-a
High

19AU9025Q0021 - Elevator Tower and Glass Façade Construction

PDF, High priority: read this firstrfp
High

19AU9025Q0021 Solicitation

PDF, High priority: read this firstrfq
High

RFQ 19AU9025Q0021 - Steel Tower and Glass Facade

PDF, High priority: read this firstrfq
High

RFQ 19AU9025Q0021 - Steel Tower and Glass Façade Elevator

PDF, High priority: read this firstrfq
High

Solicitation 19AU9025Q0021

PDF, High priority: read this firstrfq
High

Solicitation 19AU9025Q0021 - Elevator Steel Tower and Glass Façade

PDF, High priority: read this firstrfp
High

USE Elevator Integration - Steel Construction and Glass Facade SOW

PDF, High priority: read this firstsow
High

USE Elevator Integration - Steel Construction and Glass Façade Specifications

PDF, High priority: read this firstsow
High

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

1 update
PhaseClosed
Posted

Presolicitation

Type Changed

Presolicitation → Solicitation

Notice updated

Notice details unchanged. Attachments may have changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of State → Embassy Vienna
Contacts2 people available
OfficeWASHINGTON, DC, 20520, USA
Organization / Agency
Department Of State → Embassy Vienna
Office AddressWASHINGTON, DC, 20520, USA
Contacts
Charles Collins
Norbert Tritscher

Full Description

Show more
This solicitation covers the design of a steel tower with glass fa'ade outside of a U.S. Government-owned building for an elevator with vestibule for accessibility from the main entrance to 2 upper floors, to meet the ABA (American Architectural Barriers Act) requirements. The project involves - but is not limited to - the following : - Workshop drawings, factory and assembly planning of a steel tower with glass fa'ade for an elevator over 3 floors (height ca.10m), outside of the building, according to the American Architectural Barriers Act (ABA guidelines). - Delivery and assembly of the steel tower with glass fa'ade according to the American Architectural Barriers Act (ABA guidelines). - Coordinated design with the general planner's design team and the elevator contractor: The elevator will be mounted inside the steel-glass tower over 3 floors. - Coordinated cooperation on site with all project participants. - Temporary massive dust wall outdoor (weather protection) protection measures and materials, scaffolds, lifting platforms, material lifts, etc. - Commissioning and Certificates for fire protection, safety glass qualification, building physics (thermal qualification, sun protection, sound-protection) - All contractors must be registered n the SAM (System Award Management) Database https://www.sam.gov prior to submitting an offer pursuant to FAR provision 52.204-7. Therefore, prospective offerors are encouraged to register prior to the submittal of quotations/proposals. Estimate size of the project: estimated construction cost per range according to FAR 36-204: between $ 100,000 and $ 250,000.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS