Steel Transmission Pole Design and Fabrication

Open
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract involves the design and fabrication of direct-embedded, 12-sided, tapered tubular steel poles for prime contractors working on City of Stillwater utility projects. The fabrication process must adhere to ASCE/SEI 48 and RUS Bulletin 1724E-214, while meeting all applicable ASTM and AWS standards. Key deliverables include the installation of factory-welded bottom bearing plates with drain and vent openings, as well as bolted structural steel plate covers, resulting in completed, uncoated fabricated steel poles. The project is managed by the City of Stillwater in Oklahoma under NAICS code 332312. The solicitation was posted on November 21, 2026, with a response deadline of December 30, 2026. There is no specified set-aside status for this contract.

General Info

Documents

This scope was carved out of 29-2026.

The full solicitation package (11 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Supply and Deliver Steel Transmission Poles

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Due in 39 days

Read the full solicitation package

This scope is part of a larger contract. Its documents live on the prime.

  • 11 documents on the prime contractFrom Supply and Deliver Steel Transmission Poles
Read the prime's documents

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyOklahoma → City Of Stillwater
ContactsNo contacts available
OfficeN/A
Organization / AgencyOklahoma → City Of Stillwater
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Designs and fabricates direct-embedded, 12-sided, tapered tubular steel poles for prime contractors on City of Stillwater utility projects. Fabricates poles per ASCE/SEI 48 and RUS Bulletin 1724E-214, meeting ASTM and AWS standards. Installs factory-welded bottom bearing plates with drain/vent openings and bolted structural steel plate covers. Delivers completed, uncoated fabricated steel poles.

Similar Contracts

Same NAICS industry code

More opportunities from Oklahoma → City Of Stillwater

Same awarding agency

NAICS: 237310
SLED
Stillwater FY 25 Pavement Management Program Task Order 4 - Project #26TR01-A
Solicitation # 27-2026
The City of Stillwater is soliciting bids for the FY 25 Pavement Management Program Task Order 4 (Project #26TR01-A), focusing on roadway surface rehabilitation. The scope of work includes patching, crack sealing, microsurfacing, and striping across various locations in Stillwater, Oklahoma, with a total cost estimate of $3,267,925.50. Bids must be submitted electronically via the Ionwave portal by 3:00 PM local time on December 9, 2026. The contract will be awarded to the bidder deemed to be in the best interests of the project, with evaluation criteria including cost, service disruption, long-term operation and maintenance, and bidder qualifications. Required submission documents include a Bid Form, Bid Bond, Non-Collusion Affidavit, Business Relationships Affidavit, Certificate of Non-Discrimination, and a comprehensive Contractor Statement of Qualifications. All affidavits must be signed and notarized, and all documents must be signed in ink by an authorized representative. The successful contractor must provide a one-year warranty against defects in materials or workmanship and file performance, maintenance, and statutory bonds, along with public liability and workers compensation insurance. Work must adhere to the City of Stillwater and Oklahoma DOT Standard Specifications and Details.
Highway, Street, and Bridge Construction

POSTED

8 days ago

DEADLINE

in 18 days
View Details

Get AI-powered intelligence on this solicitation and the ones like it

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS