Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

Stilling Basin Concrete Inspection & Reporting

Active
Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Agency

Department Of The Interior → Mp-Regional OfficeView Agency

NAICS

541330 - Engineering ServicesView NAICS

Place of Performance

CA

Set-Aside

SBA

Documents

This scope was carved out of 140R2026R0013.

The full solicitation package (7 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Z--Prosser Creek Dam Basin Cleanup

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of The Interior → Mp-Regional Office
ContactsNo contacts available
OfficeN/A
Organization / Agency
Department Of The Interior → Mp-Regional Office
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Performs technical inspection of concrete structures for prime contractors on Bureau of Reclamation dam projects. Conducts visual and technical inspections of the concrete floor and spillway stilling basin features using calipers and crack gauges. Handles Sensitive Controlled Unclassified Information (CUI) regarding restricted drawings. Delivers one detailed inspection report summarizing structural findings.

Similar Contracts

Same NAICS industry code

NAICS: 541330
New
Scattergood GS. Units 1&2 Green Hydrogen-Reaady Modernization
Solicitation # scattergood-gs-units-12-green-hydrogen-reaady-modernization
Kiewit Infrastructure West Co. is seeking sub-quotes for the Scattergood GS Units 1&2 Green Hydrogen-Ready Modernization project for the City of Los Angeles Department of Water and Power. The scope of work is extensive, encompassing professional and technical services such as civil, structural, mechanical, electrical, and instrumentation and controls engineering, as well as utility locating, geotechnical and geophysical investigations, BIM/3D modeling, and land surveying. Additionally, the project requires support for environmental assessments, permitting, hazardous materials surveys, and CPM scheduling. Interested firms must contact Lead Estimator Joe Bockelman to receive an Invitation to Bid through the Building Connected system, with a bid date of September 11, 2026. Eligible bidders include certified Disadvantaged, Minority, Women, and Other Business Enterprises, with certifications required from agencies such as the SBA, MBDA, or the California Unified Certification Program. Responsive bidders must hold a valid California Contractor's license and provide acceptable insurance. Furthermore, responsible subcontractors and material contractors must provide bonding for 100 percent of their contract value, though Kiewit will reimburse the bond premiums. Kiewit, which is signatory to several collective bargaining agreements, requires all bidders to demonstrate an ability to maintain labor harmony on the project. Plans and specifications are available for review at Kiewit's office in Costa Mesa, California.
Kiewit Infrastructure West Co.

POSTED

about 10 hours ago

DEADLINE

in 19 days
View Details
NAICS: 541330
New
Subcontracting Opportunity: City of Bend’s Southwest Sewer Improvement Phase 3, Project No. 1SSW3
Solicitation # 27-3214
Parametrix is seeking qualified subconsultants to provide civil engineering design and right-of-way services for the City of Bend’s Southwest Sewer Improvement Phase 3, Project No. 1SSW3. The project aims to address sewer system deficiencies in southwest Bend by extending a gravity trunk sewer mainline, installing service laterals for properties currently using septic systems, and decommissioning existing residential pump stations. The scope of work includes preliminary engineering data optimization, franchise utility conflict support, full depth and width roadway reconstruction design, and ADA curb ramp and curb design. The project is funded by the Clean Water State Revolving Fund via the Oregon Department of Environmental Quality, with a total design and construction budget of 3,875,000 dollars. The project is located in southwest Bend, specifically extending from the Cinder Lane and McMullin Drive intersection through Alpine Drive and Lodgepole Drive, terminating at Poplar Street. The City of Bend intends to advertise for construction services in Fall/Winter 2027. Parametrix is actively soliciting firms with federal, tribal, state, local, or independent DBE certifications as part of a good faith effort. The response deadline for this subcontracting opportunity is September 29, 2026. Selection will be based on technical and administrative capabilities, with the City of Bend evaluating proposals and potentially conducting interviews to determine the highest scoring proposer.
Parametrix

POSTED

about 10 hours ago

DEADLINE

in 18 days
View Details

More opportunities from Department Of The Interior → Mp-Regional Office

Same awarding agency

NAICS: 237990
New
Federal
Z--Mendota Pool Bypass and Reach 2B Improvements
Solicitation # 140R2026R0020
The Bureau of Reclamation, under the San Joaquin River Restoration Program and the San Joaquin River Restoration Settlement Act, is seeking industry input via Request for Information 140R2026R0020 for the Mendota Pool Bypass and Reach 2B Improvements. This large-scale civil works project in California is estimated to have a magnitude between 225 million and 300 million dollars. The primary objective is to construct channel and structural improvements to ensure a conveyance of at least 4,500 cfs from Reach 2B downstream to Reach 3. The project is divided into two phases: Phase 1 focuses on the Mendota Pool Bypass Channel to provide passage for Chinook salmon, including the construction of a control structure, fish ladder, and auxiliary water supply, with a goal of being operational by spring 2030. Phase 2 involves replacing intake locations in Reach 2B with a headworks structure, canal, and siphon or pipeline to maintain water delivery to the Columbia Mowry Delivery System. The government aims to begin construction on the channel and levee in 2027 and is currently evaluating the most effective delivery method, considering design-bid-build, design-build, or a hybrid approach. The project must comply with several environmental mandates, including the National Environmental Policy Act, the Clean Water Act, the Endangered Species Act, and the National Historic Preservation Act, and will require a Project Labor Agreement. As this is currently an RFI for market research and planning, the agency is soliciting feedback on risk allocation, constructability, and schedule estimates. Interested parties must execute a Federal Non-Disclosure Agreement to access detailed geotechnical reports, design drawings, and specifications. The primary point of contact for this effort is Stephanie Lindner.
Other Heavy and Civil Engineering Construction

POSTED

3 days ago

DEADLINE

in 6 days
View Details
NAICS: 112420
New
Federal
F--CGB Goat Grazing
Solicitation # 140R2026Q0085
Solicitation 140R2026Q0085 is a request for quotes to establish a Firm-Fixed Price Blanket Purchase Agreement (BPA) for goat and sheep grazing vegetation management services on Bureau of Reclamation lands in Central and Northern California. The primary objective is to reduce wildfire risk in wildland-urban interface areas by managing fuel loads, targeting a 70% to 80% reduction in available onsite vegetation. The BPA is valid for five years from November 9, 2026, through November 8, 2031, with a maximum annual value of 500,000 dollars and a total five-year ceiling of 2.5 million dollars. This acquisition is a total small business set-aside under NAICS code 112420. The scope of work covers multiple California counties, including Auburn, Trinity, Shasta, Tehama, and Glenn, with specific tasks involving the implementation of high stocking density grazing and the management of shaded fuel breaks. Contractors must provide a comprehensive work plan every 90 days, adhere to strict environmental training and water usage restrictions, and submit detailed geospatial data and photo documentation for invoice verification. Evaluation of offers will be based on a comparative best-value determination considering technical approach, past performance, and price. Quotes are due by September 11, 2026, at 10:00 AM Pacific Daylight Time and must be submitted electronically to the designated point of contact.
Goat Farming

POSTED

7 days ago

DEADLINE

in about 15 hours
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS