This Solicitation opportunity from Oklahoma was posted on July 13, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Stillwater Water Treatment Plant SUA WTP Chemicals Project Project #23WT04 - Phase 1 and Phase 2

Closed
20-2024State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 333924
New
DIBBS
BINDER, LOAD
Solicitation # SPE8EF-27-T-0188
Solicitation SPE8EF-27-T-0188 is a request for quotations issued by DLA Troop Support, Construction and Equipment Manufacturing and Construction for the procurement of 61 units of Load Binders, identified by NSN 3990-01-554-6200 and Columbus McKinnon Corporation part number D060164. The requirement is designated as a total small business set-aside under FAR 19.5, with a response deadline of November 9, 2026. Delivery is required within 167 days after order, with a need ship date of April 26, 2027, and a final required delivery date of September 13, 2027. The items are to be delivered FOB Origin to DLA Distribution Red River in Texarkana, Texas, where both inspection and acceptance will take place. The contract mandates strict adherence to packaging and marking standards, requiring compliance with MIL-STD-129 and ASTM D3951, though DLA Master List technical and quality requirements take precedence. Palletization must follow RP001 guidelines. Administrative requirements include the use of the Wide Area WorkFlow system for invoicing and payment. Key regulatory clauses are incorporated, including DFARS 252.204-7012 for safeguarding covered defense information and various prohibitions regarding hazardous materials and covered telecommunications equipment. Offerors must maintain current certifications in the System for Award Management and provide safety data sheets where applicable to be considered responsible for award.
CONSTRUCTION & EQUIPMENT MANU & CON

POSTED

1 day ago

DEADLINE

in 11 days

Documents

7

Stillwater SUA WTP Chemicals Project IFB 20-2024

PDF, High priority: read this firstifb
High

Stillwater SUA WTP Chemicals Project Phase 1 Lime System Improvements IFB 20-2024

PDF, High priority: read this firstifb
High

Stillwater Water Treatment Plant SUA WTP Chemicals Project IFB 20-2024

PDF, High priority: read this firstifb
High

Stillwater Water Treatment Plant SUA WTP Chemicals Project Phase 1 Lime Final Specifications Volume 2

PDF, High priority: read this firstspecifications
High

Vol 2 - Final Drawings Phase 1 Lime - SUA WTP Chemicals Project

PDF, High priority: read this firstspecifications
High

Vol 3 - Final Specifications Phase 2 Chemicals - SUA WTP Chemicals Project

PDF, High priority: read this firstspecifications
High

Vol 3 - Final Drawings Phase 2 Chemicals.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

2 updates
PhaseClosed
Posted

Solicitation

Notice updated

Response deadline changed from Apr 10, 2024 to Jul 31, 2024. The notice title changed. NAICS code changed from 237110 to 221310. The notice description changed. The point of contact changed.

Notice updated

Response deadline changed from Jul 31, 2024 to Nov 20, 2024. The notice title changed. NAICS code changed from 221310 to 333924. The notice description changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyOklahoma → City of Stillwater
Contacts1 person available
OfficeN/A
Organization / AgencyOklahoma → City of Stillwater
Office AddressN/A

Full Description

Show more
Invitation to Bid Notice is hereby given that the Stillwater Utilities Authority will receive sealed bids for the construction of: Stillwater Water Treatment Plant SUA WTP Chemicals Project: Phase 1 Lime Improvements Project 23WT04 SUA Bid No. 20-2024 DWSRF Project No. P40-1021220-05 Cost Estimate Phase 1: $6.8 Million Scope of work to primarily include the following for Phase 1: Installation of a new lime feed system and silo procured from RDP Technologies. Modifications at the SCU walkways and platforms to accommodate the lime feed loop and dosing stations. Sitework, electrical, and ancillary items associated with the installation of the lime feed system. ** IMPORTANT ** The Stillwater Utilities Authority will utilize a two-step bidding process to select a successful bidder for this project. Step 1: PREQUALIFICATION REQUIRED – Prospective bidders must complete and submit a Statement of Qualifications for all work to be performed for the project. This includes identifying and submitting qualifications for proposed subcontractors to be used to complete portions of the work identified in Instructions to Bidders. Statements of Qualifications must be received by the Office of the City Clerk no later than 3:00 PM on Wednesday, July 31, 2024, electronically through https://stillwater.ionwave.net. Late submissions will not be accepted. PREQUALIFICATION IS REQUIRED TO SUBMIT A BID FOR THIS PROJECT. Bids received from prospective bidders that are not prequalified will not be accepted and will be returned unopened. STEP 1: PREQUALIFICATION IS COMPLETE AND PREQUALIFIED BIDDERS HAVE BEEN NOTIFIED ON OR BEFORE AUGUST 7, 2024. Step 2: PREQUALIFIED BIDDERS SUBMIT A BID – Prospective bidders that have been deemed qualified must complete and submit a bid in accordance with the bidding requirements. BIDDERS ARE REQUIRED TO SUBMIT BIDS FOR BOTH PHASE 1 AND PHASE 2 WORK AS OUTLINED IN THE BID FORM. BIDS SUBMITTED FOR ONLY A SINGLE PHASE WILL BE DEEMED NONRESPONSIVE. Bids will be received electronically only through https://stillwater.ionwave.net until 3:00 PM on Wednesday, November 13, 2024. Bids shall be opened and read aloud at the above stated time for receipt of bids. Bid opening will occur in Room 1112 “B” of the Municipal Building, 723 South Lewis, Stillwater, Oklahoma, 74074. To register for the City’s online bidding portal, visit https://stillwater.ionwave.net. Bids shall be submitted as stated in the Instructions to Bidders. Any bid received by the City Clerk more than ninety-six (96) hours, excluding Saturdays, Sundays and holidays, before the time set for the opening of bids, or any bid so received after the time set for opening of bids, shall not be considered and shall be returned unopened to the bidder submitting same. Bids will be referred to city staff for evaluation. The SUA may award to the "lowest and best responsible bidder". The SUA reserves the right to reject any or all bids or portions thereof and to waive any technicalities in the bidding process. No bid may be altered, withdrawn, or resubmitted within 45 days after the date set for the opening of bids. The documents describing the requirements for this request for bids may be examined at https://stillwater.ionwave.net. Questions regarding the bid package should be submitted through https://stillwater.ionwave.net. Each bidder is required to submit with their bid a guarantee in the form of an acceptable bidder's bond, a certified check, or a cashier's check on a solvent bank in the state of Oklahoma, and in the amount of not less than five percent (5%) of the amount bid. The successful bidder shall execute a contract within 14 days of Notice of Award by the SUA. The successful bidder shall file a performance bond, maintenance bond, statutory bond and certificates of insurance in the statutory amounts for public liability and workers compensation insurance at the time of signing the contract. Any agreement entered into as a result of this invitation to bid shall be construed under the laws of the State of Oklahoma, and the venue for enforcement of the agreement shall be Payne County in the State of Oklahoma. The SUA may issue addenda as may be necessary in the best interest of the public and the City of Stillwater. Addenda may amend the date and/or time for receipt of bids or any specification, item, document, or requirement in the Bidding Documents upon notice to all prospective bidders who signed the sign-in sheet at the Pre-Bid Conference. This project is to be financed by a loan from the Oklahoma Water Resources Board through the Department of Environmental Quality Drinking Water State Revolving Fund (DWSRF) and shall be referred to as DWSRF Project No. P40-1021220-05. A. “Equal Opportunity in Employment: All qualified applicants will receive consideration for employment without regard to race, color, religion, sex, national origin, age or handicap. Bidders on this work will be required to comply with the President’s Executive Order No. 11246, as amended. The requirements for bidders and contractors under this order are explained in the specifications.” B. “Each bidder must fully comply with the requirements, terms and conditions of the Oklahoma Department of Environmental Quality (DEQ), Small, Minority, Women’s Businesses Requirements including affirmative steps to contract with small, minority and women’s businesses during the performance of this contract. The bidder commits itself to the affirmative steps to contract with small, minority and women’s businesses contained herein and all other requirements, terms and conditions of these bid conditions by submitting a properly signed bid. Requirements are contained in Oklahoma Department of Environmental Quality Guidance and Procedures, DW-700” C. “All bidders must comply with the Anti-Kickback Act and the Contract Work Hours Standards Act.” D. “Davis Bacon Act wage rules shall apply. All laborers and mechanics employed by contractors and sub-contractors on projects funded directly by or assisted in whole or in part by and through the Federal Government shall be paid wages at rates not less than those prevailing on projects of a character similar in the locality as determined by the Secretary of Labor in accordance with subchapter IV of Chapter 31 of Title 40, United States Code. The Department of Labor provides all pertinent information related to compliance with labor standards, including prevailing wage rates and instructions for reporting. For more information, please refer to http://www.wdol.gov and http://www.SAM.gov.” E. “American Iron and Steel provisions also apply to projects funded directly by or assisted in whole or in part by and through the Federal Government pursuant to the Safe Drinking Water Act, Section 1452(a)(4), required that all iron and steel products used for a project for the construction, alteration, maintenance or repair of a public water system are produced in the United States.” F. System for Award Management (SAM) registration is required for all DWSRF program applicants and Awardees (Entities, prime contractors, subcontractors, vendors) in order to be awarded contracts by the DWSRF program. SAM replaces Central Contractor Registration/Federal Agency Registration, Online Representations and Certifications Application, and Excluded Parties List System. Applicants and awardees are required to complete a one-time free registration to provide basin information relevant to procurement and financial transactions. New Applicants and awardees please go to Sam.gov to complete the registration process. Note: In order to register in SAM, a Unique Entity Identification (UEI) number will be required. A UEI is a 12-character (alpha-numeric) code that uniquely identifies all entities. Any entity registering to do business with the government in terms of contracts or grants and assistance awards is required to have one. Unique Entity IDs are issued by SAM.gov and are a part of an entity’s record in the Entity Information section of SAM.gov. A MANDATORY Pre-Bid conference will be held Tuesday, October 22, 2024 at 9:00 a.m. local time in Room 2073 of the Norman McNickle Municipal Complex, 723 S. Lewis Street, Stillwater, Oklahoma. Anyone desiring to submit a bid is REQUIRED to attend this meeting in person. Invitation to Bid Notice is hereby given that the Stillwater Utilities Authority will receive sealed bids for the construction of: Stillwater Water Treatment Plant SUA WTP Chemicals Project Phase 2 Chemical Improvements Project #23WT04 SUA Bid No. 20-2024 DWSRF Project No. P40-1021220-05 Cost Estimate Phase 2: $17.5 Million Scope of work to primarily include the following for Phase 2: Modifications to existing chlorine feed storage and feed system, monorail structure, and wall within Chemical Building 01. Demolition and decommissioning of existing aqueous ammonia storage and feed system. Construction of Chemical Building 02 with sodium hydroxide, sodium hexametaphosphate, and liquid ammonium sulfate chemical storage and feed systems along with associated mechanical and electrical rooms. Construction of Booster Pump Building including skidded booster pumps for use in lime, carbon dioxide, and chlorine chemical feed systems as well as a skidded fire booster pump to serve Chemical Building 01. Demolition and decommissioning of existing gaseous carbon dioxide storage and feed system. Installation of new pressurized solution feed carbon dioxide system and storage tank. Modifications to existing ozone system including new supplemental air system, new cooling water system, new ozone destruct units, and modifications to existing ozone generation system power and control. ** IMPORTANT ** The Stillwater Utilities Authority will utilize a two-step bidding process to select a successful bidder for this project. Step 1: PREQUALIFICATION REQUIRED – Prospective bidders must complete and submit a Statement of Qualifications for all work to be performed for the project. This includes identifying and submitting qualifications for proposed subcontractors to be used to complete portions of the work identified in Instructions to Bidders. Statements of Qualifications must be received by the Office of the City Clerk no later than 3:00 PM on Wednesday, July 31, 2024, electronically through https://stillwater.ionwave.net. Late submissions will not be accepted. PREQUALIFICATION IS REQUIRED TO SUBMIT A BID FOR THIS PROJECT. Bids received from prospective bidders that are not prequalified will not be accepted and will be returned unopened. STEP 1: PREQUALIFICATION IS COMPLETE AND PREQUALIFIED BIDDERS HAVE BEEN NOTIFIED ON OR BEFORE AUGUST 7, 2024. Step 2: PREQUALIFIED BIDDERS SUBMIT A BID – Prospective bidders that have been deemed qualified must complete and submit a bid in accordance with the bidding requirements. BIDDERS ARE REQUIRED TO SUBMIT BIDS FOR BOTH PHASE 1 AND PHASE 2 WORK AS OUTLINED IN THE BID FORM. BIDS SUBMITTED FOR ONLY A SINGLE PROJECT WILL BE DEEMED NONRESPONSIVE. Bids will be received electronically only through https://stillwater.ionwave.net until 3:00 PM on Wednesday, November 13, 2024. Bids shall be opened and read aloud at the above stated time for receipt of bids. Bid opening will occur in Room 1112 “B” of the Municipal Building, 723 South Lewis, Stillwater, Oklahoma, 74074. To register for the City’s online bidding portal, visit https://stillwater.ionwave.net. Bids shall be submitted as stated in the Instructions to Bidders. Any bid received by the City Clerk more than ninety-six (96) hours, excluding Saturdays, Sundays and holidays, before the time set for the opening of bids, or any bid so received after the time set for opening of bids, shall not be considered and shall be returned unopened to the bidder submitting same. Bids will be referred to city staff for evaluation. The SUA may award to the "lowest and best responsible bidder". The SUA reserves the right to reject any or all bids or portions thereof and to waive any technicalities in the bidding process. No bid may be altered, withdrawn, or resubmitted within 45 days after the date set for the opening of bids. The documents describing the requirements for this request for bids may be examined at https://stillwater.ionwave.net. Questions regarding the bid package should be submitted through https://stillwater.ionwave.net. Each bidder is required to submit with their bid a guarantee in the form of an acceptable bidder's bond, a certified check, or a cashier's check on a solvent bank in the state of Oklahoma, and in the amount of not less than five percent (5%) of the amount bid. The successful bidder shall execute a contract within 14 days of Notice of Award by the SUA. The successful bidder shall file a performance bond, maintenance bond, statutory bond and certificates of insurance in the statutory amounts for public liability and workers compensation insurance at the time of signing the contract. Any agreement entered into as a result of this invitation to bid shall be construed under the laws of the State of Oklahoma, and the venue for enforcement of the agreement shall be Payne County in the State of Oklahoma. The SUA may issue addenda as may be necessary in the best interest of the public and the City of Stillwater. Addenda may amend the date and/or time for receipt of bids or any specification, item, document, or requirement in the Bidding Documents upon notice to all prospective bidders who signed the sign-in sheet at the Pre-Bid Conference. This project is to be financed by a loan from the Oklahoma Water Resources Board through the Department of Environmental Quality Drinking Water State Revolving Fund (DWSRF) and shall be referred to as DWSRF Project No. P40-1021220-05. In addition, the Stillwater Utilities Authority is receiving funding for a Congressionally Directed Spending (CDS)/Community Project Funding (CPF) (Community Grants) Water Infrastructure Project Pursuant to the FY 2022 Consolidated Appropriations Act (P.L. 117-103) (FY 2022 Appropriations Act). A. “Equal Opportunity in Employment: All qualified applicants will receive consideration for employment without regard to race, color, religion, sex, national origin, age or handicap. Bidders on this work will be required to comply with the President’s Executive Order No. 11246, as amended. The requirements for bidders and contractors under this order are explained in the specifications.” B. “Each bidder must fully comply with the requirements, terms and conditions of the Oklahoma Department of Environmental Quality (DEQ), Small, Minority, Women’s Businesses Requirements including affirmative steps to contract with small, minority and women’s businesses during the performance of this contract. The bidder commits itself to the affirmative steps to contract with small, minority and women’s businesses contained herein and all other requirements, terms and conditions of these bid conditions by submitting a properly signed bid. Requirements are contained in Oklahoma Department of Environmental Quality Guidance and Procedures, DW-700” C. “All bidders must comply with the Anti-Kickback Act and the Contract Work Hours Standards Act.” D. “Davis Bacon Act wage rules shall apply. All laborers and mechanics employed by contractors and sub-contractors on projects funded directly by or assisted in whole or in part by and through the Federal Government shall be paid wages at rates not less than those prevailing on projects of a character similar in the locality as determined by the Secretary of Labor in accordance with subchapter IV of Chapter 31 of Title 40, United States Code. The Department of Labor provides all pertinent information related to compliance with labor standards, including prevailing wage rates and instructions for reporting. For more information, please refer to http://www.wdol.gov and http://www.SAM.gov.” E. “American Iron and Steel provisions also apply to projects funded directly by or assisted in whole or in part by and through the Federal Government pursuant to the Safe Drinking Water Act, Section 1452(a)(4), required that all iron and steel products used for a project for the construction, alteration, maintenance or repair of a public water system are produced in the United States.” F. System for Award Management (SAM) registration is required for all DWSRF program applicants and Awardees (Entities, prime contractors, subcontractors, vendors) in order to be awarded contracts by the DWSRF program. SAM replaces Central Contractor Registration/Federal Agency Registration, Online Representations and Certifications Application, and Excluded Parties List System. Applicants and awardees are required to complete a one-time free registration to provide basin information relevant to procurement and financial transactions. New Applicants and awardees please go to Sam.gov to complete the registration process. Note: In order to register in SAM, a Unique Entity Identification (UEI) number will be required. A UEI is a 12-character (alpha-numeric) code that uniquely identifies all entities. Any entity registering to do business with the government in terms of contracts or grants and assistance awards is required to have one. Unique Entity IDs are issued by SAM.gov and are a part of an entity’s record in the Entity Information section of SAM.gov. A MANDATORY Pre-Bid conference will be held Tuesday, October 22, 2024 at 9:00 a.m. local time in Room 2073 of the Norman McNickle Municipal Complex, 723 S. Lewis Street, Stillwater, Oklahoma. Anyone desiring to submit a bid is REQUIRED to attend this meeting in person.  

More opportunities from Oklahoma → City of Stillwater

Same awarding agency

NAICS: 237310
SLED
Full Depth Repair - 27TR06
Solicitation # 15-2026
The City of Stillwater and Stillwater Utilities Authority are soliciting bids for Project 27TR06, Bid No. 25-2026, which involves full depth repairs on city streets and rights of way. The primary scope of work consists of the removal and replacement of paving across various locations within the city. This is a work order contract awarded to the lowest responsible bidder based on unit prices, with a total contract ceiling not to exceed 2,000,000 dollars. The contract period is two years, commencing upon the initial notice to proceed, and work is considered substantially complete when 95 percent of the contract value is finished. All construction and materials must comply with the 2019 Oklahoma Department of Transportation Standard Specifications for Highway Construction and current City of Stillwater specifications. Bids must be submitted electronically via the Ionwave portal by 3:00 PM on November 18, 2026. Submissions must include a bid guarantee of at least 5 percent of the bid amount in the form of a bond or certified check, along with a statement of qualifications and required non-discrimination affidavits. The successful bidder must execute the contract within 14 calendar days of the notice of award and provide performance, maintenance, and statutory bonds, as well as certificates of insurance for public liability and workers compensation. Funding for the contract is not guaranteed beyond June 30, 2027.
Highway, Street, and Bridge Construction

POSTED

12 days ago

DEADLINE

in 20 days
View Details
NAICS: 237310
SLED
Roadway and Utility Improvements for Knoblock Street, 4th Avenue and Lincoln Street Project Number: 25TR04
Solicitation # 17-2026
The City of Stillwater and Stillwater Utilities Authority are soliciting bids for Project 25TR04 (Bid No. 17-2026), which involves roadway reconstruction, utilities replacement, and streetscaping improvements for Knoblock Street, 4th Avenue, and Lincoln Street. The scope of work includes the construction of new roadway and utility pavement, installation of permanent signing and markings, and the placement of decorative light fixtures and poles. All work must comply with the Americans with Disabilities Act and all applicable federal, state, and local safety and environmental regulations. A mandatory pre-bid conference is scheduled for October 27, 2026, at 9:00 AM, with an option for virtual attendance via Microsoft Teams. Bids must be submitted electronically through the Ionwave portal by 3:00 PM on November 18, 2026. Submissions must include a detailed bid form, a contractor qualifications statement, and several affidavits covering non-collusion, non-discrimination, and business relationships. A bid guarantee of at least 5 percent of the bid amount is required via a bidder's bond, certified check, or cashier's check from a solvent Oklahoma bank. The contract will be awarded to the lowest and best responsible bidder based on cost, project impact, and bidder qualifications. The successful bidder must execute the contract within 14 calendar days of the Notice of Award and provide performance, maintenance, and statutory bonds, along with certificates of insurance for public liability and workers compensation.
Highway, Street, and Bridge Construction

POSTED

13 days ago

DEADLINE

in 19 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS