Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Iowa was posted on March 17, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Sto842407B Nutrient Reduction Wetland

Closed
24-02State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238910
New
SLED
ITB-26-22 - City Center Sport Complex Ballfields Restoration
Solicitation # ITB-26-22-CW
The City of Port Orange has issued solicitation ITB-26-22-CW for the restoration and reconstruction of the City Center Sport Complex Ballfields. The project involves approximately 8 acres of developed parkland situated on a former municipal landfill. The scope of work includes the excavation and removal of the upper three feet of soil, the identification and lawful disposal of buried waste, the installation of a reinforced geotextile membrane, and the subsequent replacement of fill and topsoil. Additionally, the contractor will rebuild the ballfields, parking lot, and associated site improvements. The contract term is 395 days, and the City intends to award the project to the lowest responsive and responsible bidder based solely on the Base Bid. Eligible bidders must be certified General Contractors licensed in the state of Florida. The submission process requires a comprehensive package including a bid bond equal to 5 percent of the total bid, a bonding capacity letter for 100 percent of the bid amount, and various compliance affidavits covering E-Verify, non-collusion, and public entity crimes. Bidders must also provide professional references and a statement of qualifications. Technical specifications mandate that off-site manufactured materials be ISO 9000 certified and that all work adhere to OSHA and Florida Department of Commerce safety regulations. Final acceptance of the project is contingent upon a certified financial inspection by the city and written approval from the Project Architect.
Engineering

POSTED

about 15 hours ago

DEADLINE

in 12 days

General Info

Place of Performance

IA, USA

Set-Aside

NONE

Documents

1

Sto842407B Nutrient Reduction Wetland Project Notice-to-Bidders

PDF, High priority: read this firstitb
High

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyIowa Agriculture and Land Stewardship
Contacts1 person available
OfficeN/A
Office AddressN/A

Full Description

Show more
This project is for a pumped wetland for nutrient reduction to be constructed in the floodplain. In general, the work involves, but is not limited to, selective clearing, excavation, grading, installation of lift station with electric transmission to the lift station, connection pipe from a joint drainage district tile to the lift station and from the lift station to the wetland with directionally drilled pipe, erosion stone, riprap, concrete grout, water control structure, CMP inlet risers with CMP drawdown pipes, turf reinforcement mat and seeding. This project includes around 37,960 cubic yards (CY) of earthwork, 70 linear feet (LF) of 15-inch HDPE Dual wall pipe, 710 LF of 12-inch outside diameter 4710 HDPE pipe directionally drilled, 140 tons (TN) of erosion stone, 1,112 TN of riprap, 242 CY of concrete grout, two slotted CMP inlet risers with CMP drawdown pipes, one CMP water control structure, stoplog storage structure, lift station with a 2 cubic feet/sec (7.5 HP and 12.33 feet of TDH) pump with VFD and electric transmission line to the lift station, 1,510 square yard of turf reinforcement mat and 15 acres of seeding. The estimated construction cost range for this project is $650,000 to $750,000. Completion Dates: Construction November 15, 2024 with seeding completed by December 15, 2024. Tiling will need to be completed in conjunction with repair work on the See instruction in attached Document AA Notice to Bidders for instructions on submitting bids.

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS