Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The City of Stockton is undertaking the San Joaquin River Pipeline Remediation Project to address reduced cover depth on a 36-inch Regional Wastewater Control Facility pipeline that crosses the San Joaquin River. Over time, river scour has eroded the soil covering the pipeline, bringing it below the federally and state-mandated minimum of five feet of cover, which poses risks to infrastructure integrity and regulatory compliance. The project will involve a combination of in-water and land-based activities, including dredging and excavation of the riverbed above and around the pipeline, grading on the landside of the levee, and placing layers of gravel and rip rap to restore and reinforce adequate cover. These measures are designed to ensure long-term protection of the pipeline while meeting all applicable environmental standards. To minimize impacts on the San Joaquin River and its aquatic ecosystems, the project will implement strict water quality protection measures and adhere to established in-water work windows that avoid sensitive spawning and migration periods. All construction activities will be carefully managed to prevent sedimentation, turbidity, and other disturbances to water quality and native species. The work will be coordinated by the City of Stockton with environmental oversight provided by the Director of Environmental Planning to ensure compliance with regulatory requirements. The project is forecasted to be available for bidding in June 2026, with primary contact information provided for project inquiries and coordination.

General Info

Stockton to remediate pipeline under San Joaquin River with dredging, gravel, and rip rap to restore five-foot cover.

Agency

California → City of Stockton

NAICS

237120 - Oil and Gas Pipeline and Related Structures ConstructionView NAICS

Place of Performance

Navy Drive, Stockton, CA, 95206

Set-Aside

NONE

Documents

(4)

Notice of Completion - Stockton San Joaquin River Pipeline Remediation Project

PDFnotice-of-completion

Stockton San Joaquin River Pipeline Remediation Draft Initial Study MND June 2026

PDFinitial-study-mnd

Notice of Intent for Stockton San Joaquin Pipeline Remediation Project

PDFnotice-of-intent

Stockton San Joaquin River Pipeline Remediation Project ISMND Summary

PDFismnd-summary

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of Stockton
Contacts2 people available
OfficeN/A
Organization / Agency
California → City of Stockton
Office AddressN/A
Contacts
Ana ChionoProject Manager
Crystal MainolfiDirector of Environmental Planning

Interested Companies (1)

Show more
WRA
San Rafael, CA

Full Description

Show more
The City of Stockton proposes improvements to an existing 36-inch Regional Wastewater Control Facility pipeline, which is used on occasion to divert wastewater flows. While state and federal regulations require a minimum cover depth of five feet, river scour over time has caused a reduction in the required cover depth in portions of the pipeline crossing. Therefore, the purpose of the project is to bring the pipeline into compliance with state and federal regulations. The proposed project would involve both in-water and terrestrial work, including grading on the landside of the levee, dredging/excavation of the channel bed above and around the pipeline, and the addition of gravel and rip rap fill above and around the pipeline. Water quality protection measures and in-water work windows would be implemented during project construction to ensure adequate protection of the San Joaquin River and its aquatic resources.

Similar Contracts

Same NAICS industry code

NAICS: 237120
New
Federal
Coos Bay Fuel Upgrades
Solicitation # W9127N26QA118
The U.S. Army Corps of Engineers, Portland District, is soliciting quotes under solicitation number W9127N26QA118 for the removal and replacement of existing bilge oil piping and a 550-gallon used oil tank at the Coos Bay Pier, 1460 N Bayshore Drive, Coos Bay, Oregon. The work, to be performed between October 1, 2026, and March 30, 2027, includes replacing approximately 275 feet of bilge oil piping and 300 feet of used oil piping along with associated valves, couplings, elbows, and supports, upgrading to a new 550-gallon double-walled above-ground storage tank certified to UL 142 with marine-grade coating, leak detection, emergency shutdown valves, and seismic anchoring, and elevating the new tank one foot above the existing concrete pad while reusing the foundation. All materials must meet ASTM A312, ASME B36.19M, and ASME B16.11 standards, and piping must be permanently marked in compliance with MIL-STD-161H and ASME A13.1 for color coding and identification. Installation must be followed by hydrostatic and pneumatic testing with zero pressure drop and zero visible leakage, certified by the contractor’s QC manager and an independent inspector, and all required documentation including daily reports and operations manuals must be submitted for government acceptance. The contract is a firm fixed price, set aside entirely for small businesses under NAICS code 237120, and includes strict subcontracting limits requiring the prime contractor to perform at least 50% of the labor and material. All offerors must be registered in SAM.gov with a valid UEI and comply with FAR and DFARS clauses covering small business eligibility, prohibitions on inverted domestic corporations, safeguarding covered defense information, whistleblower rights, and restrictions on acquiring covered telecommunications equipment. Personnel must pass NCIC-III and TSDB background checks, complete Anti-Terrorism Level I and Suspicious Activity Reporting training via JKO, and submit pre-screened employee lists using E-Verify prior to site access, with non-U.S. citizens requiring 30-day advance notification and HQUSACE authorization. Invoices are to be submitted as PDFs via email to the Contracting Officer’s Representative, and site visits are optional but encouraged, with registration required by August
W071 Endist Portland

POSTED

2 days ago

DEADLINE

in 3 days
View Details
NAICS: 237120
New
Federal
Repair Natural Gas Phase 1 and Phase 2 Base Wide, Vance AFB, OK
Solicitation # XTLF-21-1031
This solicitation, identified as XTLF-21-1031, is a combined synopsis and solicitation for commercial services under FAR 12.6 and FAR Part 13, requesting firm-fixed-price proposals to repair natural gas infrastructure across Phase 1 and Phase 2 at Vance Air Force Base in Enid, Oklahoma. The total estimated contract value ranges from $1,000,000 to $5,000,000, with funds not currently available and no award to be made until federal funding is secured. The Government retains the right to cancel the solicitation at any time without obligation to reimburse offerors for costs incurred. Proposals must be submitted electronically to Betty Kliewer by August 25, 2026, at 11:00 AM CST, and must remain valid for 180 days after the closing date. Award will be made on a Low Price/Technically Acceptable basis, requiring offerors to submit completed Bid Forms PA, PB, and Combine, along with detailed technical specifications, a line-item labor and material cost breakdown, and qualifications demonstrating relevant experience, certifications, and capability. All contractors must have an active, non-expired registration in the System for Award Management (SAM) to be eligible. A mandatory site visit is scheduled for July 28, 2026, at 10:00 AM CST, with attendees required to report to the Visitor Center at Building F72 at least 45 to 60 minutes prior, present valid government-recognized identification (REAL ID or U.S. Passport), and provide proof of vehicle registration and insurance to gain base access. All attendees must adhere to Vance AFB entry and conduct regulations. The contractor is responsible for furnishing all personnel, equipment, materials, and services per the attached Repair Natural Gas Specifications, which incorporate compliance with ASTM, ASME, API, OSHA, EPA, and MIL-STD-101 standards. Requirements include proper identification marking of aboveground and buried piping per color-coded and legend standards, use of brass tags for small-diameter lines, and yellow warning tape for buried lines. The contractor must maintain a qualified Project Superintendent and Site Safety and Health Officer on-site at all times, with alternates available, and ensure adherence to EM 385-1-1 safety protocols, Buy American Act compliance, permit acquisition for hazardous activities, and submission of comprehensive deliverables including as-built drawings,
FA3029 71 Ftw Cvc

POSTED

2 days ago

DEADLINE

in 17 days
View Details