Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 30 at 2:00 PM EDT

Register Free →

Stoney Tribal Administration Mini Thni Bridge Crossing

Active
2024-3921-02International

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Stoney Tribal Administration is soliciting bids for the Mni Thni Bridge Crossing project, a brownfield construction contract involving the installation of water and sanitary linear utilities across an existing bridge in Mînî Thnî, Alberta. The scope of work includes the installation of new raw water and sanitary force mains—incorporating casing, insulation, heat trace, and leak detection—as well as the fabrication and installation of pipe supports, truss systems, and steel structure connections. Additional site work involves dewatering, geotechnical monitoring, road and landscape restoration, and a provisional allowance for a trenchless electrical conduit crossing under Highway 133x. The project is managed by Associated Engineering (Alberta) Ltd., and all work must comply with Alberta Transportation standards and relevant environmental regulations. Bidders must submit their proposals via the Bids and Tenders online system by the deadline of October 15, 2026, at 8:00 PM. A mandatory bidders' briefing is scheduled for October 7, 2026, at 1:00 PM at the Stoney Tribal Administration Building. This is a unit price contract requiring a lump sum price breakdown, and successful proponents must provide a bid bond, performance bond, and labour and material payment bond. Mandatory submission requirements include an Alberta Certificate of Recognition (COR), proof of insurance, bidder qualifications, and local content documentation. The contract will be awarded to the proponent providing the greatest value based on quality, service, and price, provided they meet all mandatory criteria and minimum scoring thresholds. The anticipated completion date for all work is August 27, 2027.

General Info

Stoney Tribal Administration seeks bids for Mni Thni Bridge utility installation by October 15, 2026.

Documents

(2)

2024-3921-02 IFT Drawings

PDF•specifications

2024-3921-02 Mni Thni Bridge Crossing Project Manual

PDF•itb

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyAssociated Engineering (Alberta) Ltd.
ContactsNo contacts available
OfficeCAN
Office AddressCAN
ContactsNo contact information available

Full Description

Show more
Construction of water and sanitary linear utilities across existing bridge located in Mînî Thnî, AB.A mandatory bidders’ briefing is scheduled for Wednesday, October 7th, 2026 @ 1:00PM. It is in the best interest of the bidder to attend this briefing. Meeting point will be at the Stoney Tribal Administration Building (40 Morley Rd, Mînî Thnî, AB T0L 0E1), contact Jorey Robin, E.I.T. if you require further details for meeting location. It is in the best interest of the Bidder to attend this briefing.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
Biola CSD - Wastewater Treatment Plant Improvements (C-06-8155-210), Kerman, CA
Solicitation # biola-csd-wastewater-treatment-plant-improvements-c-06-8155-210-kerman-ca
GSE Construction Co., Inc. is seeking quotes from qualified subcontractors and suppliers for the Biola Community Services District Wastewater Treatment Plant Improvements (Redesign) Project in Kerman, California. This comprehensive infrastructure project involves the demolition of existing systems and the draining of multiple lagoons and ponds. Key construction elements include a new headworks facility, an influent eccentric manhole, a concrete flow meter vault, and the replacement of influent pumps and surface aerators. Additionally, the scope covers the installation of a sludge dewatering pipeline, new soil cement lined dewatering ponds, a reinforced concrete pad for an emergency generator, and a new CMU operations and electrical building equipped with HVAC and plumbing. The project also requires the implementation of a facility-wide PLC/SCADA monitoring system and various civil improvements such as asphalt resurfacing, grading, and piping. This opportunity is open to small businesses and certified disadvantaged, minority, and women-owned enterprises across a wide range of NAICS codes related to general building and specialty trade contractors. Interested parties must submit their responses by October 21, 2026, and can coordinate with the primary point of contact, Christina Pauls.
GSE Construction Co., Inc.

POSTED

about 12 hours ago

DEADLINE

in 25 days
View Details
NAICS: 237110
New
Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1
Solicitation # inland-feedersbvmwd-foothill-ps-intertie-stage-1
The Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1 project, located in Highland, California, involves extensive water infrastructure installation for the Metropolitan Water District of Southern California. The scope of work includes furnishing and installing approximately 2,150 linear feet of 54-inch to 66-inch diameter steel pipe and 200 linear feet of 144-inch diameter steel pipe. The project also requires the installation of various large-diameter valves, including contractor-furnished units and Metropolitan-furnished 54-inch and 132-inch valves, as well as 54-inch and 145.5-inch diameter tie-ins. Additional construction requirements include the installation of four surge tanks, two valve vaults, an air compressor yard structure, and various drainage improvements. The technical scope extends to electrical upgrades, instrumentation and controls, piping systems, welding, disinfection, and surface restoration, along with the excavation of cobbles and large boulders. This solicitation, issued by James W. Fowler Co., is open to small businesses, including SDVOSB, MBE, and WBE certified firms, with a bid submission deadline of September 29, 2026. The prime contractor is actively encouraging M/W/DBE participation and the use of apprentices, offering assistance with bonding, insurance, and equipment procurement for qualified subcontractors.
James W. Fowler Co.

POSTED

about 12 hours ago

DEADLINE

in 3 days
View Details
NAICS: 237110
New
City of Lomita: Zone G Water Main Replacement Project
Solicitation # city-lomita-zone-g-water-main-replacement-project
The City of Lomita Zone G Water Main Replacement Project involves the installation of approximately 4,500 linear feet of new 8-inch DIP water mains, gate valves, fittings, water services, and fire hydrant assemblies on Walnut Street, Ebony Lane, and 247th Place. The scope of work includes the abandonment of existing water mains and requires the furnishing of all necessary materials, tools, and equipment. W.A. Rasic Construction Company is soliciting subcontractor quotations for various trades, including waterworks, ready-mix concrete, PCC and AC paving, AC grind and cap, striping, traffic control, hot taps, trucking, and soil and material testing. The response deadline for quotations is October 19, 2026, at 1:00 PM. This is an SBA set-aside opportunity targeting DBE, MBE, WBE, and SBE firms, with the prime contractor encouraging the use of consortia for larger contract portions. Eligible subcontractors must hold a valid California Contractors License and be registered with the Department of Industrial Relations per Section 1725.5 of the Public Contract Code. Additionally, subcontractors must agree to the standard subcontract agreement and insurance requirements of W.A. Rasic Construction Company. The prime contractor may require payment and performance bonds totaling 100 percent of the bid, with bond premiums reimbursed up to a maximum of 1.5 percent. The primary point of contact for this solicitation is Matt Metoyer, Estimating Manager.
W.A. Rasic Construction Company

POSTED

about 12 hours ago

DEADLINE

in 23 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS