Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Kentucky was posted on August 4, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Storm and Sanitary Sewer Piping Replacement

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238910
New
SLED
ITB-26-22 - City Center Sport Complex Ballfields Restoration
Solicitation # ITB-26-22-CW
The City of Port Orange has issued solicitation ITB-26-22-CW for the restoration and reconstruction of the City Center Sport Complex Ballfields. The project involves approximately 8 acres of developed parkland situated on a former municipal landfill. The scope of work includes the excavation and removal of the upper three feet of soil, the identification and lawful disposal of buried waste, the installation of a reinforced geotextile membrane, and the subsequent replacement of fill and topsoil. Additionally, the contractor will rebuild the ballfields, parking lot, and associated site improvements. The contract term is 395 days, and the City intends to award the project to the lowest responsive and responsible bidder based solely on the Base Bid. Eligible bidders must be certified General Contractors licensed in the state of Florida. The submission process requires a comprehensive package including a bid bond equal to 5 percent of the total bid, a bonding capacity letter for 100 percent of the bid amount, and various compliance affidavits covering E-Verify, non-collusion, and public entity crimes. Bidders must also provide professional references and a statement of qualifications. Technical specifications mandate that off-site manufactured materials be ISO 9000 certified and that all work adhere to OSHA and Florida Department of Commerce safety regulations. Final acceptance of the project is contingent upon a certified financial inspection by the city and written approval from the Project Architect.
Engineering

POSTED

about 15 hours ago

DEADLINE

in 12 days

AI Contract Overview

Show more

The contract encompasses the excavation, removal, and replacement of storm and sanitary sewer piping systems, requiring comprehensive trenching, installation of new piping, backfilling, and thorough system testing to ensure operational integrity. All work must comply with industry standards and local regulatory requirements, with particular attention to minimizing disruption and ensuring long-term functionality of the sewer infrastructure. The scope includes all labor, materials, equipment, and supervision necessary to complete the project from start to finish, including site preparation, pipe handling, connection to existing systems, and post-installation verification. This subcontract is issued under NAICS code 238910 for other sewer and water line and related structures construction, managed by the Finance Division of Engineering and Contract Administration for the Commonwealth of Kentucky. The solicitation was posted on August 4, 2026, with responses due by August 27, 2026, at 5:30 PM. The place of performance is designated as “Other,” indicating the work may occur across multiple unspecified locations within Kentucky, and all contractors must be prepared to mobilize to site locations as directed. Bidders are expected to demonstrate relevant experience, proper licensing, and the capability to meet deadlines while maintaining safety and quality standards throughout the project lifecycle.

General Info

Excavate, install, and test storm and sanitary sewer systems across Kentucky per regulatory standards.

Place of Performance

Other, KY, USA

Set-Aside

NONE

Documents

This scope was carved out of RFB-45-27.

The full solicitation package (14 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

RFB-785-2700000047-2 | RFB-45-27 Russellville Armory Renovations DMA

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyKentucky → Fin Div of Eng&Contract Admin
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Excavation, removal, and replacement of storm and sanitary sewer piping, including trenching, pipe installation, backfill, and system testing.

More opportunities from Kentucky → Fin Div of Eng&Contract Admin

Same awarding agency

NAICS: 237990
SLED
RFB-660-2700000129-2 | FW-002-27 - FILO - Red Oak Phase II
Solicitation # RFB-660-2700000129-2
Solicitation RFB-660-2700000129-2, issued by the Kentucky Department of Fish and Wildlife Resources, seeks a contractor for the Red Oak Creek ABD Restoration Project (FW-002-27) located within the Dr. James R. Rich Wildlife Management Area in Owen County, Kentucky. The scope of work involves the re-establishment, rehabilitation, and enhancement of approximately 16,146 linear feet of stream channels. Key activities include the construction of new channels, the installation of in-stream structures such as armored crossings and rock/log riffles, the establishment of a forested riparian corridor, and the management of invasive species through two separate treatments both before and after construction. Bidders must be registered in the Vendor Self Service system and submit their responses exclusively online. The submission must include an Official Bid Document and a Bid Bond combined into a single PDF attachment, with the actual contract amount listed on the document rather than in the electronic system. Evaluation is based on proof of project experience, though resumes are not required. The project timeline varies by award scope, with a substantial completion date of February 1, 2028, for the base bid only, or February 1, 2029, if additive alternatives are included. Contractors are cautioned that there is no onsite water source for herbicide mixing and that parking lots cannot be used for equipment staging.
Other Heavy and Civil Engineering Construction

POSTED

14 days ago

DEADLINE

in 1 day
View Details
NAICS: 236220
SLED
RFB-660-2700000129-1 | FW-002-27 - FILO - Red Oak Phase II
Solicitation # RFB-660-2700000129
Solicitation RFB-660-2700000129, titled FW-002-27 - FILO - Red Oak Phase II, is a request for bids issued by the Kentucky Department of Fish and Wildlife Resources for the Red Oak Creek ABD Restoration Project. Located within the Dr. James R. Rich Wildlife Management Area in Owen County, Kentucky, the project involves the re-establishment, rehabilitation, and enhancement of approximately 16,146 linear feet of perennial, intermittent, and ephemeral streams. The scope of work includes the re-establishment of roughly 7,346 feet of new channel, equipment-based rehabilitation of 2,665 feet, and manual rehabilitation and enhancement of 6,135 feet. Key deliverables include the installation of various in-stream structures such as armored crossings, rock/log riffles, log vanes, and boulder clusters, alongside the establishment of a forested riparian corridor and comprehensive invasive species management conducted both pre- and post-construction. Bids must be submitted electronically via the Commonwealth’s eProcurement system by October 29, 2026, with the Official Bid Document and any required Bid Bond combined into a single PDF. Bidders are instructed to enter $0.00 in the system's contract amount field and provide the actual bid amount on the Official Bid Document. Evaluation is based on qualifications and proof of project experience, though resumes are not required. The project timeline for substantial completion is February 1, 2028, for the base bid only, or February 1, 2029, if additive alternatives are awarded. Important site restrictions include a prohibition on using parking lots for equipment staging or employee parking and the notification that no water source for herbicide mixing is available onsite.
Commercial and Institutional Building Construction

POSTED

about 1 month ago

DEADLINE

in 1 day
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS