Storm Drain Improvements and Radii Realignment

Forecast
39-10282025-323State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Agency

California → San Joaquin County

Place of Performance

Eighth Street, Seventh Street, Baker Road, Beecher Road, CA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

Get what you need to respond

No documents were posted with this contract.

  • Buyer contactEmail and phone
  • Original solicitationLink to the source posting
Get the buyer contact

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → San Joaquin County
Contacts1 person available
OfficeN/A
Organization / Agency
California → San Joaquin County
Office AddressN/A

Full Description

Show more
STORM DRAIN IMPROVEMENTS AND RADII REALIGNMENT Project Description Project Location: Intersection of South Ash Street and South Laurel Street: between east 7th Street and 8th Street; Intersection of Baker Road and Beecher Road: southwest corner. See attached Vicinity Maps. Project Justification: The Ash Street and Laurel Street locations have periodic flooding alongside the edge of pavement, ultimately affecting the residents’ driveways. We will regrade the existing roadside ditch/swale at these two locations, to allow the water to shed to the existing drainage inlets to the north. The southwest corner of the intersection at Baker Road and Beecher Road has accumulated excessive asphalt outside of the County right of way. We will remove the excess asphalt and realign the roadway edge of pavement. We will put back the edge of pavement and reestablish the roadway shoulder. Scope of Work: The project will consist of: 1. Regrading roadside ditch to drain to the north at 2181 Ash Street. 2. Removing broken driveway pipe at 2138 Laurel Street and regrading roadside ditch to drain to the north. 3. Removing excess concrete asphalt at the southwest corner of Baker Road and Beecher Road and reestablishing the shoulder. Environmental Setting: In these portions of the San Joaquin County, land usage varies from residential to agricultural. There are many large trees adjacent to the project area. Nesting and migratory birds, protected by the Migratory Bird Treaty Act, may nest within these trees. Furthermore, the Swainson’s Hawk, a raptor species of concern within the State of California and listed as threatened may nest adjacent to or within the project area. A pre-construction survey for nesting Swainson’s Hawks and other migratory birds is recommended if construction is scheduled to occur from February 15th to September 1st. Beneficiaries: The public will see increased safety and fewer hazards with these drainage repairs and realignment. Overall, there will be reduced maintenance concerns and more reliability within the project areas.

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
SLED
El Rancho Drive, La Madrona Drive Guardrail Project, Federal Project No. HSIPL-5936(135)
Solicitation # 40579
The El Rancho Drive and La Madrona Drive Guardrail Project, Federal Project No. HSIPL-5936(135), is a public infrastructure safety initiative managed by the County of Santa Cruz Department of Public Works. The project involves the installation of the Midwest Guardrail System and associated infrastructure repairs across 16 total locations, specifically 6 locations along El Rancho Drive and 10 locations along La Madrona Drive. The scope of work includes the removal of existing guardrails and AC dikes, cold planing AC pavement to a depth of 2 inches, constructing new AC dikes, and building earth retaining structures. The estimated cost of the project is 812,997 USD, with a required completion timeframe of 70 working days. The project is subject to strict federal and state regulations, including Buy America requirements for iron, steel, and manufactured products, and adherence to the Davis-Bacon and Related Act. It is a prevailing wage project governed by the Department of Industrial Relations. Contractors must provide a bid bond or security, as well as faithful performance and payment bonds upon award. Compliance requires rigorous documentation, including mill tags for steel products, certificates of compliance, and a clear chain of custody record verified by the Engineer. Proposals must be submitted electronically via the OpenGov portal and include mandatory certifications regarding debarment, non-collusion, and equal employment opportunity.
Public Works

POSTED

about 11 hours ago

DEADLINE

in 23 days
View Details

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS