Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 30 at 2:00 PM EDT

Register Free →

Storm Drain Inlet Installation/Replacement

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract for the Public Works-Engineering agency in California involves the removal and replacement of storm drain inlets for prime contractors on city storm drain projects. The scope of work includes performing demolition according to Standard Specifications Sections 300-2 and 401, installing new drain inlet structures, and restoring all surface conditions to their pre-construction status using concrete cutting and excavation equipment. The project falls under NAICS code 237310 and was posted on September 23, 2026, with a response deadline of October 7, 2026. The primary objective is the delivery of fully installed and functional storm drain inlets.

General Info

California subcontract for removing and replacing storm drain inlets for city projects.

Agency

California → Public Works-EngineeringView Agency

NAICS

237310 - Highway, Street, and Bridge ConstructionView NAICS

Place of Performance

CA, USA

Set-Aside

NONE

Documents

This scope was carved out of 52027.

The full solicitation package (5 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

STORM DRAIN LINING FISCAL YEAR 2026-27

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Public Works-Engineering
ContactsNo contacts available
OfficeN/A
Organization / Agency
California → Public Works-Engineering
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Removes existing storm drain inlets and installs new replacements for prime contractors on City storm drain projects. Performs demolition per Standard Specifications Sections 300-2 and 401, installs new drain inlet structures, and restores surface conditions to pre-construction status. Utilizes concrete cutting equipment and excavation tools. Delivers installed and functional storm drain inlets.

Similar Contracts

Same NAICS industry code

More opportunities from California → Public Works-Engineering

Same awarding agency

NAICS: 237110
New
SLED
STORM DRAIN LINING FISCAL YEAR 2026-27
Solicitation # 52027
The City of Fullerton, California, is soliciting bids for Project No. 52027, Storm Drain Lining for Fiscal Year 2026-27. The project involves the rehabilitation of existing storm drain pipes using cured-in-place-pipe (CIPP) liners, with a scope of work that includes cleaning and preparation of pipes, pre- and post-construction video inspections, storm drain inlet replacement, and necessary traffic control. The engineer's estimate for the project is 358,000 dollars, and the contract will be awarded to the lowest responsible bidder. Bidders must possess a Class A license at the time of submission and provide a 10 percent bid bond. Proposals are due via the OpenGov Procurement Portal by 1:00 pm on October 7, 2026. The successful contractor must execute the agreement and provide all required statutory bonds and insurance certificates within 21 calendar days of the award. Once a notice to proceed is issued, the work must be completed within 21 working days, followed by a 10-working-day window to resolve any punch list items. Key requirements include compliance with California Labor Code prevailing wage rates, DIR registration, and adherence to the 2024 Standard Specifications for Public Works. The contractor is also required to maintain a record set of drawings on-site and provide as-constructed plans before final payment. Final acceptance is contingent upon the submission and approval of two copies of each video inspection and a narrative of findings.
Water and Sewer Line and Related Structures Construction

POSTED

1 day ago

DEADLINE

in 14 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS