Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

Storm Drain Inspection & Maintenance

Open
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract for the Public Works Department of the City of Riverside focuses on storm drain inspection and maintenance. The scope of work involves performing video inspections and modifications of storm drain lines for prime contractors, specifically conducting pre and post-construction CCTV inspections and modifying existing catch basins through drilling, cutting, and the installation of 8 inch Ductile Iron Pipe connections. The contractor is responsible for delivering comprehensive inspection reports and completed modified catch basins. The project is categorized under NAICS code 237110 and is managed by the City of Riverside in California. There is no specific set-aside status associated with this opportunity. Interested parties should note the response deadline of December 16, 2026, with the solicitation having been posted on November 16, 2026.

General Info

Riverside Public Works subcontract for storm drain CCTV inspection and catch basin modification.

Documents

This scope was carved out of 8242.

The full solicitation package (5 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

2025/2026 Arterial and Minor Streets Maintenance, Phase 1 & 2

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Due in 25 days

Read the full solicitation package

This scope is part of a larger contract. Its documents live on the prime.

  • 5 documents on the prime contractFrom 2025/2026 Arterial and Minor Streets Maintenance, Phase 1 & 2
Read the prime's documents

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Public Works Department of City of Riverside
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Performs video inspection and modification of storm drain lines for prime contractors on City of Riverside Public Works Department projects. Conducts pre and post-construction CCTV video inspection and modifies existing catch basins by drilling, cutting, and installing 8" Ductile Iron Pipe (DIP) connections. Delivers inspection reports and modified catch basins.

Similar Contracts

Same NAICS industry code

More opportunities from California → Public Works Department of City of Riverside

Same awarding agency

NAICS: 237310
New
SLED
2025/2026 Arterial and Minor Streets Maintenance, Phase 1 & 2
Solicitation # 8242
The 2025/2026 Arterial and Minor Streets Maintenance, Phase 1 & 2 project is a solicitation by the Public Works Department of the City of Riverside for comprehensive street maintenance improvements. The scope of work includes cold milling of deteriorated asphalt, application of ARAM and CSPB, resurfacing with DGAC, slurry sealing, and the repair of concrete sidewalks, driveways, pedestrian ramps, curb/gutters, and cross gutters. Additionally, the project involves landscaping, irrigation, installation of gravel trenches, traffic striping, signage enhancements, and the excavation and installation of asphalt millings in alleyways. Work must be completed within 150 working days from the Notice to Proceed, with initial activities prioritized at 5382 Tower Road. The contract requires strict adherence to the 2021 Standard Specifications for Public Works Construction and the 2022 Caltrans Standard Specifications and Plans. Bidders must provide a bid bond of 10% of the proposal amount, and the successful contractor must provide performance and payment bonds for 100% of the contract price. Insurance requirements include $1,000,000 per occurrence and $2,000,000 aggregate for Commercial General Liability, and $1,000,000 per occurrence for Automobile Liability. All contractors and subcontractors must maintain a valid City of Riverside Business Tax Registration. Award recommendations will be based on electronic bids, with a 10% labor surcharge for straight time and overtime work. There is no set-aside status for this solicitation.
Highway, Street, and Bridge Construction

POSTED

7 days ago

DEADLINE

in 24 days
View Details

Get AI-powered intelligence on this solicitation and the ones like it

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS