Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Pennsylvania was posted on June 10, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Storm Drain Pipe Installation (HDPE/CMP)

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
26350 Lynchburg, VA - CSO 70 Sewer Improvements
Solicitation # 2027-027
Cleary Construction is soliciting quotations from certified Disadvantaged Business Enterprises (DBEs) for the City of Lynchburg CSO 70 Sewer Improvements project in Virginia. This solicitation, identified as IFB 2027-027, is open to various small business set-asides, including Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone certified firms. Interested parties must submit their responses by December 4, 2026. The scope of work involves comprehensive sewer infrastructure improvements, including the open cut installation of PVC pipes ranging from 6 to 30 inches and Ductile Iron Pipe in 18 and 24-inch diameters. Technical requirements include the installation of standard and doghouse manholes, interior drop assemblies, a CSO regulator fit out, and 24-inch diameter trenchless crossings with associated launch and receiving shafts. Site preparation tasks include clearing and grubbing over 5,130 square yards of wooded areas, seeding, and fine grading. Key operational deliverables include the implementation and maintenance of a Stormwater Pollution Prevention Plan (SWPPP), the maintenance of flows and bypass during construction, and the provision of geotechnical instrumentation and monitoring. Additionally, contractors are required to obtain railroad insurance for applicable work areas. The project also involves various pipe and manhole abandonment tasks and extra depth excavation.
Cleary Construction, Inc.

POSTED

about 6 hours ago

DEADLINE

in 30 days

AI Contract Overview

Show more

This contract involves the removal of a failed 18-inch corrugated metal pipe (CMP) and the installation of a new 18-inch high-density polyethylene (HDPE) pipe. The scope includes all associated activities such as trenching, bedding, and backfilling, which must be carried out in compliance with PennDOT standards. The project is situated in Lancaster County and falls under the NAICS code 237110, which pertains to water and sewer line and related structures construction. The solicitation was posted on June 10, 2026, with a response deadline set for June 30, 2026. This subcontract opportunity is issued by the Lancaster County agency in Pennsylvania and is available through the PennBID platform. There are no set-aside restrictions or additional organizational eligibility requirements indicated. The contract focuses on ensuring proper installation and infrastructure integrity for storm drain pipe systems in the designated area.

General Info

Remove failed 18-inch CMP and install new 18-inch HDPE pipe in Lancaster, compliant with PennDOT.

Place of Performance

Lancaster County, PA, USA

Set-Aside

NONE

Documents

This scope was carved out of 100901.0089.

The full solicitation package (2 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Streambank Stabilization – N. Hill Road and 100 Donna Drive

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyPennsylvania → Lancaster County
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Removal of failed 18" CMP pipe and installation of 18" HDPE pipe, including trenching, bedding, and backfilling per PennDOT standards.

More opportunities from Pennsylvania → Lancaster County

Same awarding agency

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS