Storm Drain Realignment and Installation

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The City of San Diego has awarded a subcontract for the design and installation of an 18-inch reinforced concrete pipe storm drain system within the public right-of-way to replace aging and abandoned stormwater infrastructure. The project includes the construction of new storm drains along with associated cleanouts to ensure proper maintenance and accessibility. The work must comply with all relevant municipal codes and engineering standards, and is intended to improve local stormwater management and reduce flood risks. The contract is classified under NAICS code 237110, indicating it falls under the sewer and stormwater infrastructure construction sector. The contract was posted on June 10, 2026, and is specifically designated as a subcontract, suggesting it is part of a larger municipal initiative managed by the City of San Diego. While no solicitation number or set-aside details are provided, all work is to be performed within the city limits of San Diego, with no other geographic details specified. The project is linked to a state-level environmental tracking system, implying that compliance with California environmental regulations, including CEQA, is required. The timing suggests planning and permitting are in active phases with construction expected to follow soon after award.

General Info

San Diego awards subcontract for 18-inch storm drain replacement to improve flood control and meet municipal codes.

Agency

California → City of San Diego

Place of Performance

San Diego, CA

Set-Aside

NONE

Documents

This scope was carved out of PRJ-1142487.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

1605 Puterbaugh Easement Vacation / PRJ- 1142487

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

subcontract

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of San Diego
ContactsNo contacts available
OfficeN/A
Organization / Agency
California → City of San Diego
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Design and install a new 18-inch reinforced concrete pipe (RCP) storm drain system within the public right-of-way, including cleanouts, to replace abandoned public stormwater infrastructure.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, solicitation number SRP-W-134-0290, is a construction contract for the City of Belmont, North Carolina, with a project estimate of 16,690,000 dollars. The scope of work involves the installation of 16,435 linear feet of 20-inch ductile iron force main and comprehensive upgrades to the Morgans Branch Pumping Station. Key infrastructure deliverables include a new wet well, valve vault, and associated appurtenances, as well as the installation of pumps, a generator, and odor control equipment. The project also requires the demolition of existing pumps and piping, the installation of new gravity sewers and manholes, and the execution of by-pass pumping, testing, and commissioning. The contract will be awarded to the responsible bidder submitting the lowest responsive bid, with a strong emphasis on qualifications, financial ability, and the submission of required MWBE documentation, including a Good Faith Efforts Form and Table A. Bidders must provide performance and payment bonds, as well as proof of insurance from companies with an A.M. Best rating of A-VII or better. Performance is governed by a Notice to Proceed, and payments are processed monthly via applications for payment submitted to the Engineer, becoming due 30 days after presentation to the owner. Technical standards for the work include compliance with AWS D1.2 for welding, NEMA standards for motors, and AMCA 500-L for louvers.
Don Moorhead Construction, Inc.

POSTED

about 6 hours ago

DEADLINE

in 6 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS