Storm Drainage & Utilities Installation

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Documents

This scope was carved out of 20261017006.

The full solicitation package (3 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Vista Del Lago High School Site Fencing

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Folsom Cordova Unified School District
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Installs storm drainage utilities and related civil work for prime contractors on School District projects. Performs installation of drainage pipes and structures using storm drain piping and fittings. Complies with the California Plumbing Code (CPC). Delivers a functional storm drainage system.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, solicitation number SRP-W-134-0290, is a construction contract for the City of Belmont in North Carolina with a project estimate of 16,690,000 dollars. The scope of work involves the installation of 16,435 linear feet of 20-inch ductile iron force main and extensive upgrades to the Morgans Branch Pumping Station. Key deliverables include the construction of a new wet well and valve vault, the installation of pumps, a generator, odor control equipment, mechanical and electrical systems, and the demolition of existing pumps and piping. The project also encompasses site improvements such as stormwater facilities, fencing, and various paving and restoration activities. The contract will be awarded to the responsible bidder submitting the lowest responsive bid, with specific requirements for the submission of a Good Faith Efforts Form and Table A to meet MBE/WBE participation goals of 10.9 percent for the EPA and 10 percent for the State of North Carolina. Performance and payment bonds, as well as proof of insurance, are required. The project is managed by Willis Engineers, and the contractor will be subject to liquidated damages of 1,000 dollars per day for failure to achieve substantial completion. Payment is processed via Applications for Payment, with funds becoming due 30 days after presentation to the owner. All work must adhere to strict quality standards, including AWWA Specification C-600 for pipelines and NEMA standards for motors.
Don Moorhead Construction, Inc.

POSTED

about 11 hours ago

DEADLINE

in 21 days
View Details

More opportunities from California → Folsom Cordova Unified School District

Same awarding agency

NAICS: 238990
New
SLED
Vista Del Lago High School Site Fencing
Solicitation # 20261017006
The Folsom Cordova Unified School District is soliciting proposals for the Vista del Lago High School Site Fencing project located at 1970 Broadstone Parkway, Folsom, California. This lease-leaseback contract involves the installation of 8-foot tall, three-rail fully welded ornamental iron fencing, concrete mow strips, and various ADA pedestrian, service, and vehicle gates. The scope of work also includes the demolition of existing ornamental fencing and bollards, as well as miscellaneous civil work such as saw cutting, site concrete placement, asphalt concrete patchback, and re-striping. The anticipated construction cost is 475,000.00 dollars, and the final contract will be based on a Guaranteed Maximum Price that includes a 3 percent contractor contingency and a 3 percent district contingency. The selection process utilizes a Best Value Score derived from written proposals and optional interviews, evaluating factors such as past project cost-saving techniques, technical capabilities, and BIM modeling experience. The anticipated notice to proceed is November 23, 2026. Contractors must adhere to strict material packaging and storage requirements, comply with prevailing wage laws, and meet Disabled Veteran Business Enterprise contracting goals. Additionally, bidders must certify compliance with CARB regulations for off-road diesel vehicles and provide a non-collusion declaration. Final acceptance of the work is subject to punch list inspections by the District Representative, Project Inspector, and Architect, as well as the provision of an asbestos-free materials certification.
All Other Specialty Trade Contractors

POSTED

about 19 hours ago

DEADLINE

in 17 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS