Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 30 at 2:00 PM EDT

Register Free →

Storm Drainage and Utility Infrastructure

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Agency

Georgia → City of AugustaView Agency

NAICS

237110 - Water and Sewer Line and Related Structures ConstructionView NAICS

Place of Performance

GA, USA

Set-Aside

NONE

Documents

This scope was carved out of PE-72155-NONST-2027-000000219.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

#26-184 Greene Street Improvement Project (5th Street to 13th street)

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyGeorgia → City of Augusta
ContactsNo contacts available
OfficeN/A
Organization / Agency
Georgia → City of Augusta
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Installs and replaces storm drains, catch basins, and associated piping for prime contractors on City of Augusta street improvement projects. Performs trenching, pipe laying, and installation of drainage grates and manholes using excavators and pre-cast concrete catch basins. Follows local municipal drainage codes. Delivers a functioning storm drainage system for the project area.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
Biola CSD - Wastewater Treatment Plant Improvements (C-06-8155-210), Kerman, CA
Solicitation # biola-csd-wastewater-treatment-plant-improvements-c-06-8155-210-kerman-ca
GSE Construction Co., Inc. is seeking quotes from qualified subcontractors and suppliers for the Biola Community Services District Wastewater Treatment Plant Improvements project in Kerman, California. This comprehensive redesign project involves the demolition of existing infrastructure and the draining of multiple lagoons and ponds. Key construction elements include a new headworks facility with mechanical screening and compaction units, a new influent eccentric manhole, a concrete flow meter vault, and the replacement of influent pumps and surface aerators. The scope of work further extends to the installation of a sludge dewatering and wasting pipeline with a trailer-mounted pump system and the construction of two soil cement lined sludge dewatering ponds. Additional requirements include a reinforced concrete pad for an emergency generator, a new CMU operations and electrical building equipped with HVAC and plumbing, and a facility-wide PLC/SCADA monitoring system. Miscellaneous civil improvements such as asphalt resurfacing, grading, and piping are also required. This opportunity is open to small businesses and certified disadvantaged, minority, and women-owned enterprises, with a response deadline of October 21, 2026.
GSE Construction Co., Inc.

POSTED

about 2 hours ago

DEADLINE

in 28 days
View Details
NAICS: 237110
New
Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1
Solicitation # inland-feedersbvmwd-foothill-ps-intertie-stage-1
The Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1 project in Highland, California, involves extensive water infrastructure installation managed by James W. Fowler Co. for the Metropolitan Water District of Southern California. The scope of work includes furnishing and installing approximately 2,150 linear feet of 54-inch to 66-inch diameter steel pipe and 200 linear feet of 144-inch diameter steel pipe. The project also requires the installation of various contractor and Metropolitan-furnished valves, 54-inch and 145.5-inch diameter tie-ins, four surge tanks, two valve vaults, and an air compressor yard structure. Additional requirements include drainage improvements, electrical upgrades, instrumentation and controls, piping systems, welding, disinfection, surface restoration, and the excavation of cobbles and large boulders. This solicitation, posted on September 22, 2026, has a response deadline of September 29, 2026. It is open to small businesses, including SBA-certified service-disabled veteran-owned small businesses, minority business enterprises, and woman business enterprises. The prime contractor, James W. Fowler Co., is actively seeking subcontractor pricing and encourages the participation of M/W/DBE firms, offering assistance with equipment, supplies, bonding, and insurance to maximize their involvement. The project also encourages the use of apprentices and requires quality control testing. All work must be performed according to the plans and specifications provided on the contractor's website.
James W. Fowler Co.

POSTED

about 2 hours ago

DEADLINE

in 6 days
View Details

More opportunities from Georgia → City of Augusta

Same awarding agency

NAICS: 541611
SLED
OPERATIONAL EFFICIENCY ASSESSMENT
Solicitation # 26-908
The City of Augusta, Georgia, is seeking proposals under RFP 26-908 for a qualified firm to conduct a comprehensive Operational Efficiency Assessment. The primary objective of this study is to identify opportunities to improve service delivery, reduce or avoid costs, strengthen internal controls, and align staffing and technology with industry best practices. The selected consultant will perform data analysis, structural reviews of organizational spans of control, and business practice assessments across citywide functions and specific departments. Deliverables include a Project Management Plan within 45 to 90 days of the Notice to Proceed, interim updates every 30 days, written summaries of findings per phase, and a final comprehensive report featuring an implementation plan. Proposals must be submitted by October 19, 2026, in two separately sealed envelopes containing technical qualifications and a cost proposal, along with a digital copy on a USB drive. Evaluation is based on a 120-point scale covering firm experience, qualifications, project understanding, management, references, and cost, with an optional interview for short-listed firms. The contract requires the consultant to be legally registered in Georgia and maintain specific insurance coverages, including commercial general, automobile, and umbrella liability. Compliance with E-Verify and the SAVE program is mandatory, and the city emphasizes the participation of local small businesses. Payment is structured as monthly in arrears with net 30-day terms following the city's acceptance of delivered services.
Administrative Management and General Management Consulting Services

POSTED

11 days ago

DEADLINE

in 27 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS