Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 14 at 2:00 PM EDT

Register Free →

Storm Drainage & Water Main Modifications

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Documents

This scope was carved out of STPL-5475 (054).

The full solicitation package (3 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

San Juan Avenue Complete Streets Project – Phase 1B

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of Citrus Heights
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Performs storm drainage improvements and water main modifications for prime contractors on City of Citrus Heights utility projects. Installs storm drain inlets, pipes, and manholes, and adjusts utility facilities to grade per Sacramento County Public Works Agency Improvement Standards. Delivers functional storm drainage and modified water main infrastructure.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
Biola CSD - Wastewater Treatment Plant Improvements (C-06-8155-210), Kerman, CA
Solicitation # biola-csd-wastewater-treatment-plant-improvements-c-06-8155-210-kerman-ca
GSE Construction Co., Inc. is seeking quotes from qualified subcontractors and suppliers for the Biola Community Services District Wastewater Treatment Plant Improvements Redesign Project in Kerman, California. This comprehensive infrastructure project involves the demolition of existing facilities and the draining of multiple lagoons and ponds. Key construction elements include a new headworks facility with mechanical screening, a new influent eccentric manhole, a concrete flow meter vault, and the replacement of influent pumps and surface aerators. Additionally, the scope covers the installation of a sludge dewatering pipeline and pump system, the construction of two soil cement lined sludge dewatering ponds, a reinforced concrete pad for an emergency generator, and a new CMU operations and electrical building equipped with full HVAC and plumbing. The project also requires the implementation of a facility-wide PLC/SCADA monitoring system and various civil improvements such as asphalt resurfacing, grading, and piping. This solicitation is open to small businesses and certified DBE, MBE, and WBE firms across a wide range of NAICS codes related to heavy and civil engineering construction, as well as specialty trade contractors. Interested parties must submit their responses by October 21, 2026. Primary contact for this opportunity is Christina Pauls in the estimating department.
GSE Construction Co., Inc.

POSTED

about 6 hours ago

DEADLINE

in 18 days
View Details
NAICS: 237110
New
IEUA RMPU Basin Improvements Project Montclair Basin Improvements
Solicitation # ieua-rmpu-basin-improvements-project-montclair-basin-improvements
The IEUA RMPU Basin Improvements Project involves construction improvements at Montclair Basin 2 and 3 in Chino, California. The primary objective is to divert available storm flows from the San Antonio Creek Channel into existing basins to facilitate groundwater recharge. The scope of work is comprehensive, requiring all materials, labor, tools, equipment, and incidentals necessary to furnish, install, commission, and deliver a fully functional system. Key activities include civil and site work such as grading, demolition, saw cutting, cold planing, and trucking, as well as the installation of concrete pipes, concrete structures, and fabricated pipes and fittings. Additional requirements include electrical work, welding, construction surveys, traffic control, and the implementation of Storm Water Pollution Prevention Plans. Norstar Plumbing and Engineering, Inc. is the prime contractor seeking certified Disadvantaged Business Enterprise, Minority Business Enterprise, Small Business Enterprise, and Women Business Enterprise subcontractors and suppliers to support the project. The solicitation is categorized under NAICS code 237110. Interested parties must submit their bids by October 29, 2026, at 2:00 PM. Detailed plans and specifications are available through the Inland Empire Utilities Agency bidding portal. Primary points of contact for this opportunity are Nathan Plummer and Destiny Plummer.
Norstar Plumbing and Engineering, Inc

POSTED

about 6 hours ago

DEADLINE

in 26 days
View Details
NAICS: 237110
New
City of Lomita: Zone G Water Main Replacement Project
Solicitation # city-lomita-zone-g-water-main-replacement-project
The City of Lomita Zone G Water Main Replacement Project involves the installation of approximately 4,500 linear feet of new 8-inch DIP water mains, gate valves, fittings, water services, and fire hydrant assemblies, along with the abandonment of existing water mains. The work is located on Walnut Street, Ebony Lane, and 247th Place in California. W.A. Rasic Construction Company, Inc. is acting as the prime contractor and is soliciting subcontractor quotations for various trades, including waterworks, ready-mix concrete, PCC and AC paving, AC grind and cap, striping, traffic control, hot taps, trucking, and soil, compaction, and material testing. The response deadline for subcontractor quotations is October 19, 2026, at 1:00 PM. This solicitation is specifically targeted toward DBE, MBE, WBE, and SBE firms to encourage maximum participation. All subcontractors must possess a valid California Contractors License and be registered with the Department of Industrial Relations per Section 1725.5 of the Public Contract Code. Additionally, selected subcontractors must execute the standard subcontract agreement and insurance requirements of W.A. Rasic Construction Company, Inc., and may be required to provide payment and performance bonds totaling 100 percent of their bid, with bond premiums reimbursed up to 1.5 percent.
W.A. Rasic Construction Company

POSTED

about 6 hours ago

DEADLINE

in 16 days
View Details

More opportunities from California → City of Citrus Heights

Same awarding agency

NAICS: 541330
New
SLED
San Juan Avenue Complete Streets Project – Phase 1B
Solicitation # STPL-5475 (054)
The San Juan Avenue Complete Streets Project Phase 1B is a federally funded public works initiative managed by the City of Citrus Heights, California. The project focuses on sidewalk infill and pavement rehabilitation on San Juan Avenue from Chesline Drive to Spicer Drive. The comprehensive scope of work includes the installation and repair of curb, gutter, and sidewalk concrete medians, ADA and transit bus stop improvements, storm drainage and water main modifications, retaining walls, street lighting, and traffic signal modifications and interconnect. The estimated construction value is 2.6 million dollars, with a total performance period of 70 working days, consisting of 60 days for base bid work and 10 days for anticipated additional work. This specific solicitation seeks professional services for Construction Management, Inspection, and Materials Testing. The selected consultant must provide a registered Civil Engineer to serve as the Resident Engineer, along with staff for construction inspection, materials testing, and public engagement. Services will be compensated on an actual cost-plus-fixed fee basis with a not-to-exceed maximum. Because the project is partially funded by federal grants, it must be administered according to the Caltrans Local Assistance Procedures Manual and comply with Buy America provisions, prevailing wage rates, and various federal non-discrimination authorities. Proposals are due by 3:00 PM on October 29, 2026, and must include three bound copies and one electronic PDF on a memory stick. The main proposal is limited to 30 pages, while cost proposals are only required from short-listed firms. Award selection is based on the proposer who best meets the city's needs. The successful contractor must provide 100 percent payment and performance bonds and adhere to strict quality assurance standards, including the submission of as-built plans before the city accepts improvements for permanent maintenance.
Engineering Services

POSTED

3 days ago

DEADLINE

in 27 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS