Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

Storm Drainage Inlet Medallion Installation

Open
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Place of Performance

Roseburg, OR, 97470, USA

Set-Aside

NONE

Documents

This scope was carved out of 26PW16.

The full solicitation package (3 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

26PW16 - 2026 Storm Water Improvements

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Due in 28 days

Read the full solicitation package

This scope is part of a larger contract. Its documents live on the prime.

  • 3 documents on the prime contractFrom 26PW16 - 2026 Storm Water Improvements
Read the prime's documents

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyOregon → City of Roseburg
ContactsNo contacts available
OfficeN/A
Organization / AgencyOregon → City of Roseburg
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Supplies and installs identification medallions for storm drainage inlets for prime contractors on City of Roseburg municipal projects. Performs the physical installation of medallions on drainage inlets. Delivers installed medallions on drainage inlets.

Similar Contracts

Same NAICS industry code

NAICS: 238990
New
Federal
EBMUD – SD-462 – Secondary Reactors Rehab. – Phase 2
Solicitation # SD-462
The EBMUD Secondary Reactors Rehabilitation Phase 2 project, solicitation SD-462, is a comprehensive infrastructure project located at the Main Wastewater Treatment Plant in California. The scope of work involves the rehabilitation of covered and open concrete structures, the relining, modification, or replacement of steel and ductile iron pipes and supports, and the installation of valves and piping appurtenances. Additionally, the project includes the installation and operation of a temporary 11 MGD pumped bypass, rehabilitation of reactor mixers and aerators, improvements to instrumentation and electrical systems, replacement of motor control center components, modifications to sluice and slide gates, and the installation of platforms and access improvements. Civil works such as excavation, trenching, and surveying of key points around the reactors are also required. The estimated contract value ranges between 18.5 million and 19.5 million dollars, with a bid opening date of December 2, 2026. This opportunity is set aside for Small Business (SB), SBA certified Veteran Owned Small Business (VOSB), SBA certified Service-Disabled Veteran Owned Small Business (SDVOSB), SBA certified Women-Owned Small Business (WOSB), and SBA certified HUBZone Small Business (HUBZone SB). Ranger Pipelines Incorporated is soliciting quotes from certified DBE, DVBE, and SBE subcontractors for specialized services including coating, concrete rehabilitation, electrical work, and welding.
Ranger Pipelines Incorporated

POSTED

about 4 hours ago

DEADLINE

in 7 days
View Details

More opportunities from Oregon → City of Roseburg

Same awarding agency

NAICS: 237110
New
SLED
26PW16 - 2026 Storm Water Improvements
Solicitation # 26PW16
The City of Roseburg is soliciting bids for the 2026 Storm Water Improvements project (Project # 26PW16) located in Roseburg, Oregon. The scope of work is divided into two primary areas: the Walker Ct area (Schedule A), which involves the installation of curbs, gutters, a manhole, three catch basins, and 12-inch storm pipe; and the Center St area (Schedule B), which includes curbs, gutters, two manholes, five catch basins, 12-inch storm pipe, and water main relocation. Key deliverables include the application of new asphalt surfacing with a minimum depth of 3 inches and the installation of storm drainage inlet medallions. The project requires adherence to Oregon Standard Drawings and City specifications, with a one-year warranty on all materials and workmanship. The contract will be awarded to the lowest responsible bidder based on the combined price of Schedule A and Schedule B. Bids must be submitted by 2:00 p.m. on December 22, 2026, and must include a bid bond or equivalent security of at least 10% of the total bid amount. This is a prevailing wage project requiring a performance bond, payment bond, and a certificate of insurance. Preference is given to goods and services produced in Oregon. Bidders must provide their Construction Contractors Board or State Landscape Contractors Board license number and a First-Tier Subcontractor Disclosure Form. There is no specific set-aside status for this solicitation.
Water and Sewer Line and Related Structures Construction

POSTED

about 17 hours ago

DEADLINE

in 27 days
View Details

Get AI-powered intelligence on this solicitation and the ones like it

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS