Storm Drainage System Inspection and Reporting
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
The contract titled Storm Drainage System Inspection and Reporting requires the visual or CCTV inspection of catch basins and their connected sewer lines to evaluate their condition and aid in planning future repairs and maintenance. The work is to be performed under a subcontract for the Massachusetts Department of Public Works, with all inspections focused on ensuring the integrity and functionality of the storm drainage infrastructure. The submission deadline for proposals is August 3, 2026, and the solicitation was posted on July 15, 2026, though no specific geographic locations within the state have been defined for performance. The North American Industry Classification System code 541330 indicates the scope falls under engineering services, suggesting the contractor must provide technical expertise and accurate reporting. Deliverables are expected to include detailed assessments that support long-term infrastructure management and repair prioritization.
General Info
Agency
NAICS
Place of Performance
MA, USSet-Aside
Documents
(0)AI Contract Breakdown
Uniform Contract FormatNo contract breakdown available.
Cannot generate Contract Breakdown because no documents were found from this contract's source.
Timeline
Response Deadline
Organization & Contact Information
Full Description
Similar Contracts
Same NAICS industry code
More opportunities from Massachusetts → PUBLICWORKS - Department of Public Works
Same awarding agency
