Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 30 at 2:00 PM EDT

Register Free →

This Solicitation opportunity from California was posted on March 10, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Storm Drainage System Rehabilitation and Replacement Project at Alester Avenue and Various Locations

Closed
197180State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
Biola CSD - Wastewater Treatment Plant Improvements (C-06-8155-210), Kerman, CA
Solicitation # biola-csd-wastewater-treatment-plant-improvements-c-06-8155-210-kerman-ca
GSE Construction Co., Inc. is seeking quotes from qualified subcontractors and suppliers for the Biola Community Services District Wastewater Treatment Plant Improvements (Redesign) Project in Kerman, California. This comprehensive project involves the demolition of existing infrastructure, draining of multiple lagoons and ponds, and the construction of a new headworks facility featuring a mechanical chain and rack bar screen. Key technical upgrades include a new influent eccentric manhole, flow meter vault, replacement of influent pumps and surface aerators, and the installation of a new sludge dewatering pipeline with a trailer-mounted pump system. The scope of work further extends to the construction of two wire mesh soil cement lined sludge dewatering ponds, a reinforced concrete pad for an emergency generator, and a new CMU operations and electrical building equipped with HVAC, plumbing, and testing equipment. Additionally, the project requires the implementation of a facility-wide PLC/SCADA monitoring system and various civil improvements such as asphalt resurfacing and earthwork. This opportunity is open to small businesses and certified disadvantaged, minority, and women-owned enterprises across various NAICS codes, with a response deadline of October 21, 2026.
GSE Construction Co., Inc.

POSTED

about 10 hours ago

DEADLINE

in 24 days
NAICS: 237110
New
City of Lomita: Zone G Water Main Replacement Project
Solicitation # city-lomita-zone-g-water-main-replacement-project
The City of Lomita Zone G Water Main Replacement Project involves the installation of approximately 4,500 linear feet of new 8-inch DIP water mains, gate valves, fittings, water services, and fire hydrant assemblies on Walnut Street, Ebony Lane, and 247th Place. The scope of work includes the abandonment of existing water mains and requires various construction trades, including waterworks, ready-mix concrete, PCC and AC paving, AC grind and cap, striping, traffic control, hot taps, trucking, and soil and material testing. W.A. Rasic Construction Company, Inc. is soliciting subcontractor quotations for this project, with a response deadline of October 19, 2026. Eligible subcontractors must possess a valid California Contractors License and be registered with the Department of Industrial Relations per Section 1725.5 of the Public Contract Code. The solicitation specifically encourages participation from DBE, MBE, WBE, and SBE firms, including the use of consortiums for larger contract portions. Selected subcontractors must execute the standard subcontract agreement and insurance requirements of W.A. Rasic Construction Company, Inc. Additionally, the company may require payment and performance bonds totaling 100 percent of the subcontractor bid, with bond premiums reimbursed up to a maximum of 1.5 percent. Primary contact for this solicitation is Matt Metoyer, Estimating Manager.
W.A. Rasic Construction Company

POSTED

about 10 hours ago

DEADLINE

in 22 days

AI Contract Overview

Show more

The Storm Drainage System Replacement and Rehabilitation Project involves two primary sites in Palo Alto, California. The first site on Alester Avenue calls for upsizing 283 linear feet of existing 12-inch reinforced concrete pipe to a 36-inch high-density polyethylene pipe, connecting to a 36-inch HDPE stub at the junction box near Hamilton Avenue. This upsizing requires replacing catch basins, laterals, and ADA ramps. Due to proximity to an elementary school, the contractor must coordinate work schedules around school bell times during the academic year or perform construction during summer breaks to minimize disruption. The second site, located at Lambert and Birch, focuses on replacing catch basins and laterals and installing a new manhole within the street. The project is managed by the Public Works-Engineering Services department of Palo Alto, with key contacts including an engineer and contract administrator. The contract includes comprehensive terms and conditions governing project execution, such as contractor responsibilities, indemnification, insurance requirements, and prevailing wage compliance, as stipulated in the City of Palo Alto's standard construction contract provisions. Bid security is ensured through a bid bond amounting to 10% of the contractor’s maximum bid, guaranteeing commitment to the project upon award. Additionally, performance and payment bonds are required to protect the City and subcontractors, ensuring faithful contract performance and payment for labor and materials. These surety bonds provide financial and legal safeguards, including coverage for attorney fees and liquidated damages if contractual obligations are not met. The solicitation, posted in March 2026 with responses due by early April, reflects a publicly advertised opportunity through the City's procurement portal.

General Info

Palo Alto storm drainage upgrade replacing pipes, catch basins, ensuring safety, bonding, and wage compliance.

Documents

(19)

Alester Rehab 100% Plans Signed

PDF•10 pages•specifications

Bid Bond Form for City of Palo Alto Project

DOCX•2 pages•bid-bond

City of Palo Alto Invitation for Bids - Bid Form

DOCX•3 pages•bid-form

City of Palo Alto Utility Map Request Form and Confidentiality Agreement

PDF•3 pages•request-form

Construction Contract General Conditions and Change Orders - City of Palo Alto

PDF•104 pages•contract-document

IFB 197180 Storm Drainage System Rehabilitation and Replacement Project

PDF•20 pages•ifb

IFB 197180 Storm Drain Replacement Project Drawings

PDF•1 page•project-drawings

IFB 197180 Storm Drain Replacement Project Drawings

PDF•1 page•project-drawings

IFB Bid Form for Storm Drain Replacement - City of Palo Alto

DOCX•6 pages•bid-form

IFB PR 197180 Storm Drain Rehabilitation Technical Specifications

PDF•223 pages•technical-specifications

IFB PR #197180 Storm Drain Replacement Appendices and NDA

PDF•3 pages•ifb

IFB SD-06101 Storm Drain Rehabilitation Replacement Technical Specifications

PDF•223 pages•technical-specifications

IFB SD-06101 Storm Drain Replacement and Rehabilitation Project FY26

DOCX•123 pages•ifb

Performance Bond for City of Palo Alto Public Improvements

DOCX•2 pages•performance-bond

Special Provisions for City of Palo Alto Project

DOCX•special-provisions

Special Provisions for City of Palo Alto Storm Drain Project

DOCX•2 pages•special-provisions

IFB Appendices for Storm Drain Replacement Project SD-06101

PDF•3 pages•appendices

Liquidated Damages Calculations for Storm Drain Replacement Project SD-06101

PDF•2 pages•liquidated-damages-calculation

Payment Surety Bond for City of Palo Alto Agreement

DOCX•2 pages•payment-bond

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → Public Works-Engineering Services
Contacts2 people available
OfficePalo Alto, CA, 94301, USA
Office AddressPalo Alto, CA, 94301, USA
Contacts
Steven DimterContract Administrator

Interested Companies (17)

Show more
Precision Engineering
San Francisco, CA
Pacific Underground Construction
San Jose, CA
Cratus
San Francisco, CA

See All 17 Interested Companies

Start a free trial to view all interested companies, their contact details, and full contractor profiles.

Start Free Trial

Full Description

Show more
The Storm Drainage System Replacement and Rehabilitation Project proposes on 2 locations. The first location on Alester proposes to upsize 283 linear feet of 12-inch reinforced concrete (RCP) pipe to 36-inch high density polyethylene (HDPE) pipe on Alester Avenue. The pipe would need to a 36-inch HDPE stub coming off of a junction box at Hamilton Avenue and Alester Avenue where a different contractor on another project. The catch basins, laterals, and ADA ramps will need to be replaced as a result of this upsizing. One of the main challenges is the location since the project is located next to the elementary school, the Contractor would have to adhere to the bell schedules if work is scheduled for the school year or work can done during summer when school is not in session. The second location on Lambert and Birch proposes to replace the catch basin and laterals, and install a new manhole structure in the street.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS