Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Texas was posted on June 10, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Storm Sewer and Drainage System Installation

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237310
New
North Hollywood Central Remediation Well Collector Line; IFB No. 8003R1
Solicitation # 8003R1
Kiewit Infrastructure West Co. is soliciting sub-quotes for the North Hollywood Central Remediation Well Collector Line project, an infrastructure initiative for the City of Los Angeles Department of Water and Power located in California. The comprehensive scope of work includes underground construction such as tunneling, boring, jacking, and micro tunneling, as well as site work involving land surveying, subsurface investigation, shoring, and site clearing. Additional requirements encompass surface improvements like asphalt paving, landscaping, and the installation of traffic signs and signals, along with environmental support services including SWPPP and quality control. Material needs include ready mix supply, precast concrete, and steel casing. This solicitation is open to qualified Small Business, Women-Owned Small Business, and Disadvantaged Business Enterprise subcontractors and suppliers. Responsive bidders must hold a valid California Contractor's license and provide acceptable insurance. Furthermore, subcontractors and material contractors are required to provide bonding for 100 percent of their contract value, with bond premiums reimbursed by Kiewit. Interested parties must contact Lead Estimator Ken Johnston to receive an Invitation to Bid via the Building Connected system. The deadline for bid submissions is November 18, 2025, at 2:00 p.m.
Kiewit Infrastructure West Co.

POSTED

about 6 hours ago

DEADLINE

in 13 days
NAICS: 237310
New
SLED
Tustin Legacy Linear Park - Phase 3 Between Armstrong to Warner (CIP No. 20083)
Solicitation # CIP 20083
The City of Tustin is soliciting bids for the Tustin Legacy Linear Park Phase 3 project (CIP No. 20083), located between Armstrong and Warner. This construction project involves the development of a multi-modal path, walking trails, a playground, fitness pods, and extensive landscaping. Key deliverables include a 12-foot main multi-modal path, a 6-foot secondary walking trail, and various paving installations using concrete, stabilized decomposed granite, and PIP rubber. The scope also encompasses site work, electrical installations for pedestrian and street lighting, and adherence to a Final Water Quality Management Plan and Storm Water Pollution Prevention Plan. The engineer's estimate for the project is $11,100,000, with a performance period of 190 contract days. Bidders must hold a Class A contractor's license and provide a California Department of Industrial Relations Registration number. Bids are due electronically via OpenGov by December 10, 2026, at 2:00 pm, with the critical requirement that a hard copy original of the bid bond be delivered to the City Clerk by the same deadline to avoid being deemed non-responsive. The contract will be awarded to the apparent low bidder. Contractual obligations include providing payment, faithful performance, and guaranty bonds, as well as maintaining workers' compensation insurance and complying with California Labor Code prevailing wage requirements. Payment will be issued through monthly progress payments at 95% of the work value, with the final 5% retained until 60 days after the recordation of the Notice of Completion and the submission of as-built plans. Liquidated damages for delays are set at $8,800 per calendar day. All work must conform to 2008 ADA Standards for Accessibility and Cal-OSHA safety requirements.
Public Works

POSTED

about 14 hours ago

DEADLINE

in about 1 month

AI Contract Overview

Show more

The contract involves the installation of new underground storm sewer systems designed to enhance drainage along a reconstructed roadway. This project aims to improve stormwater management and reduce flooding risks in the area through modernized infrastructure. The work falls under the NAICS code 237310, which pertains to construction projects, specifically focusing on sewer and drainage system installation. Issued by the City of San Antonio, Texas, this subcontract opportunity was posted on June 10, 2026, with a response deadline set for July 14, 2026. Although specific location details and points of contact are not provided, the contract is publicly listed on the Texas SmartBuy procurement platform. This project is critical for supporting urban infrastructure resilience and ensuring proper stormwater flow in the roadway area undergoing reconstruction.

General Info

Installation of underground storm sewer for roadway drainage, issued by City of San Antonio.

Agency

Texas → CITY OF SAN ANTONIO

Place of Performance

TX, USA

Set-Aside

NONE

Documents

This scope was carved out of 23-03867.

The full solicitation package (2 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Bulverde Rd (Green Spring Dr - Redland Rd) Street Reconstruction (2022 Bond)

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyTexas → CITY OF SAN ANTONIO
ContactsNo contacts available
OfficeN/A
Organization / Agency
Texas → CITY OF SAN ANTONIO
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Installation of new underground storm sewer systems to improve drainage along the reconstructed roadway.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS