Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Washington was posted on June 10, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Storm Sewer Pipe Installation

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
26350 Lynchburg, VA - CSO 70 Sewer Improvements
Solicitation # 2027-027
Cleary Construction is soliciting quotations from certified Disadvantaged Business Enterprises (DBEs) for the City of Lynchburg CSO 70 Sewer Improvements project in Virginia, identified by solicitation number 2027-027. This opportunity is open to various small business set-asides, including Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone certified firms. Interested parties must submit their responses by December 4, 2026. The scope of work involves comprehensive sewer infrastructure improvements, including the open-cut installation of PVC pipes ranging from 6 to 30 inches and Ductile Iron Pipe from 18 to 24 inches. Technical requirements include the installation of standard and doghouse manholes, interior drop assemblies, a CSO regulator fit out, and 24-inch diameter trenchless crossings with associated launch and receiving shafts. Additional site responsibilities include clearing and grubbing of wooded areas, seeding, fine grading, and the implementation and maintenance of a Stormwater Pollution Prevention Plan (SWPPP). Key operational deliverables include the maintenance of flows and bypass for all pipes and manholes during construction, as well as geotechnical instrumentation and monitoring. The project also requires specific railroad insurance. The bid schedule encompasses general base bid items, sewer base bid items, and contingent items, with primary contact for bid documents and subcontracting opportunities being John Connelly.
Cleary Construction, Inc.

POSTED

about 3 hours ago

DEADLINE

in about 1 month
NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, solicitation number SRP-W-134-0290, is a construction contract for the City of Belmont in North Carolina with a project estimate of 16,690,000 dollars. The scope of work involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and extensive upgrades to the Morgans Branch Pumping Station. Key deliverables include the installation of a new wet well, valve vault, pumps, generator, and odor control equipment, as well as the demolition of existing pumps and piping, installation of new gravity sewers and manholes, and various site improvements including stormwater facilities and fencing. The contract is governed by EJCDC standard general and supplementary conditions and will be awarded to the responsible bidder submitting the lowest responsive bid. Bidders must provide a signed bid form, bid security, and mandatory MWBE documentation, including a Good Faith Efforts Form and Table A. The project requires performance and payment bonds, as well as proof of insurance. Contract administration is managed by the City of Belmont with Willis Engineers serving as the representative. Payment is processed via Applications for Payment, with the Engineer reviewing submissions within 10 days and payment becoming due 30 days after presentation to the owner.
Don Moorhead Construction, Inc.

POSTED

about 3 hours ago

DEADLINE

in 7 days
NAICS: 237110
New
Jefferson St. Pump Station Replacement
Solicitation # ITB-2026141
The City of Winchester is soliciting bids for the Jefferson Street Pump Station Replacement project, with a submission deadline of November 12, 2026, at 2:00 pm via the City's e-Procurement Portal. The scope of work includes the construction of a new pump station featuring a precast concrete building, controls, and a standby generator, as well as site electrical work, yard piping, security fencing, grading, and paving. Additionally, the project requires the relocation of an existing fuel tank and the demolition of existing facilities. All work must be completed within 610 calendar days following the Notice to Proceed and must adhere to VDOT 2020 Road and Bridge Specifications and the City of Winchester Standards Manual. WG Construction is currently seeking MBE/WBE subcontractor participation for paving, material supply, site development, fencing, MEP, roofing, and carpentry. The contract will be awarded to the lowest responsive and responsible bidder based on qualifications, compliance, and pricing. Bidders must provide a minimum of three similar project references, a detailed Quality Management Plan, and a Timeliness Tracking Plan. The project is subject to Davis-Bacon wage determinations, American Iron and Steel requirements, and strict adherence to OSHA and ADA standards. Successful bidders must provide performance and payment bonds equal to 100 percent of the contract amount.
WG Construction Co., Inc.

POSTED

about 3 hours ago

DEADLINE

in 7 days

AI Contract Overview

Show more

This contract involves the excavation, supply, installation, connection to existing structures, and backfilling of approximately 105 linear feet of 8-inch Schedule A storm sewer pipe. The work is part of a subcontract opportunity issued by Spokane County in Washington, aimed at storm sewer pipe installation under the NAICS code 237110, which pertains to water and sewer line and related structures construction. The solicitation was posted on June 10, 2026, with a response deadline set for June 24, 2026. While specific location details and a point of contact are not provided, the contract emphasizes timely submission and compliance with the county’s requirements for storm sewer infrastructure improvements. The project scope ensures the functional integration of new piping with existing structures to enhance stormwater management systems.

General Info

Excavation and installation of 105 feet 8-inch storm sewer pipe for Spokane County, Washington.

Documents

This scope was carved out of 26-10262.

The full solicitation package (2 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

SWR - 2026 Stormwater Package 2 Projects

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyWashington → Spokane County
ContactsNo contacts available
OfficeN/A
Organization / AgencyWashington → Spokane County
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Excavation, supply, installation, connection to structures, and backfilling of 105 linear feet of 8-inch Schedule A storm sewer pipe.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS