Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Sources Sought opportunity was posted on August 20, 2009. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Storm Water Drainage

Closed
Site-DrainageFederal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

General Info

Agency

N/A

NAICS

238910 - Site Preparation Contractors

Place of Performance

Whitney M Young Job Corps 8460 Shelbyville Road, SIMPSONVILLE, KY, 40067, USA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

Sources Sought

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyN/A
Contacts2 people available
OfficeN/A
Organization / Agency
N/A
Office AddressN/A
Contacts
Carolyn SavkoFinance and Administration Director

Full Description

Show more
The Whitney M Young Job Corps is soliciting bids for a drainage project to be awarded by September 30, 2009. Small business are encourged to bid. The intent of this Scope of Work is to correct the storm water drainage issues at the Whitney M Young Job Corps Center. The center storm water drainage issues include: 2) Install catch basin, outfall to swale about 50' away. 3) Install catch basin, outfall to low point 300' away. 4) Build up grade, about 50 SF, at recreation entry. Install floor drain at northeast exterior exit well, pipe to positive outfall 100' away. 5) Install catch basin and culvert to outfall south approximately 300' away. 6) Re-grade area creating a swale to direct water around the building. Excavate approximately 1,000 CF. 7) Re-grade area creating a swale to direct water around the building. Excavate approximately 500 CF For items 1-3, cut and patch concrete sidewalk or asphalt road for drain installation. 8) Re-grade and road in front of Cafeteria Building 9. Approximately 100 feet of asphalt road to be regraded. 9) Regrade area between Buildings 2 and 34 to direct water towards the East side of Building 2. Approximately 1,000 CF. A mandatory pre-bid meeting to be held at the Whitney M Young Job Corps Center is tentatively scheduled for August 25, 2009 at 10:00 a.m. 1) Install catch basin and culvert to outfall north of loop road.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS