Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

Stormwater Discharge Pipe Installation

Open
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract involves the removal and installation of a 24-inch diameter steel stormwater discharge pipe for prime contractors working on California Department of Fish and Wildlife projects in Paradise Cut. The scope of work includes excavating the existing pipe, installing new steel piping, and completing site restoration in accordance with the Lake and Streambed Alteration Agreement EPIMS-SJN-48012-R3. The project requires the use of heavy excavation equipment suitable for shoreline environments and strict compliance with CCR Title 14 Section 15302. Managed by the California Fish and Wildlife Region 3 Bay Delta office in Fairfield, the ultimate goal of the contract is the delivery of a fully operational discharge pipe.

General Info

Subcontract for installing 24-inch steel stormwater pipe at Paradise Cut, California.

Agency

California → Fish and Wildlife, Region 3 - Bay Delta, Fairfield

Place of Performance

CA

Set-Aside

NONE

Documents

This scope was carved out of EPIMS-SJN-48012-R3.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Reclamation District 2062 Paradise Cut Pipe Replacement Project (Notification of Lake or Streambed Alteration, No. EPIMS-SJN-48012-R3)

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Read the full solicitation package

This scope is part of a larger contract. Its documents live on the prime.

  • 1 document on the prime contractFrom Reclamation District 2062 Paradise Cut Pipe Replacement Project (Notification of Lake or Streambed Alteration, No. EPIMS-SJN-48012-R3)
Read the prime's documents

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

Posted

subcontract

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Fish and Wildlife, Region 3 - Bay Delta, Fairfield
ContactsNo contacts available
OfficeN/A
Organization / Agency
California → Fish and Wildlife, Region 3 - Bay Delta, Fairfield
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Performs removal and installation of a 24-inch diameter steel stormwater discharge pipe for prime contractors on California Department of Fish and Wildlife projects in Paradise Cut. Excavates existing pipe, installs new steel piping, and performs site restoration per the Lake and Streambed Alteration Agreement (EPIMS-SJN-48012-R3). Requires heavy excavation equipment for shoreline environments and compliance with CCR Title 14 Section 15302. Delivers an operational discharge pipe.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
26350 Lynchburg, VA - CSO 70 Sewer Improvements
Solicitation # 2027-027
Cleary Construction is soliciting quotations from certified Disadvantaged Business Enterprises (DBEs) for the City of Lynchburg CSO 70 Sewer Improvements project in Virginia. This solicitation, identified as IFB 2027-027, is open to various small business set-asides, including SBA certified Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone small businesses. Interested firms must submit their responses by December 4, 2026. The scope of work involves comprehensive sanitary sewer system improvements utilizing both open-cut and trenchless installation methods. Key deliverables include the installation of PVC and DIP piping ranging from 6 to 30 inches, the construction of standard and doghouse manholes, and the execution of 24-inch diameter trenchless crossings with associated launch and receiving shafts. Additional requirements include CSO regulator fit out, outfall construction, maintenance of flows and bypass operations, and the abandonment of existing pipes and manholes. Project execution requires strict adherence to environmental standards through SWPPP implementation and maintenance, as well as the use of geotechnical instrumentation and monitoring. Due to the project location and nature, railroad insurance is a mandatory requirement. General site preparation tasks such as clearing and grubbing of wooded areas and subsequent seeding and fine grading are also included in the bid schedule.
Cleary Construction, Inc.

POSTED

about 6 hours ago

DEADLINE

in 16 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS