Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Missouri was posted on March 16, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Stormwater Improvement Project - Lindsay Ln & Florisota Dr

Closed
PW25-0244State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

The City of Florissant is soliciting proposals for a storm sewer improvement project at the intersection of Lindsay Lane and Florisota Drive, aimed at resolving flooding and ponding issues by installing an approximately 300 linear foot storm sewer system. The project involves constructing two new curb inlet manholes and one curb inlet to intercept stormwater and direct it away from the site. All improvements must maintain ADA compliance for sidewalks and curbs, and the contractor is required to implement a Traffic Management Plan, including lane closures approved by the Florissant Police Department and Engineering Division. Coordination with an upcoming MSD construction project on Lindsay Lane, slated for mid-April 2026, is necessary to minimize disruption to local residents and traffic. Bidders must conduct thorough site investigations and fully understand all conditions prior to submitting proposals, as no claims for unforeseen circumstances will be accepted. The contractor is responsible for providing all labor, equipment, and materials, safely managing utilities and traffic, and proper disposal of debris without burning or burying on site. Excavation permits must be obtained from the City, though fees will be waived, and the work must comply with all applicable federal and state regulations. Lot restoration includes grading and sidewalk repairs to meet current ADA and city standards. The project requires strict adherence to prevailing wage laws as established by Missouri labor regulations, along with submission of payroll records and compliance with state labor provisions. Reporting delays and ongoing communication with the City Engineer and Florissant’s Engineering Office throughout the contract term is mandatory. The contract also includes requirements related to insurance, bonding, OSHA training, apprenticeship programs, and work authorization affidavits to ensure compliance with legal and safety standards for public works projects in Florissant.

General Info

Florissant seeks contractor for ADA-compliant storm sewer installation with traffic and safety management.

Documents

13
PDF, High priority: read this firstcertification
High
PDF, High priority: read this firstspecifications
High
PDF, High priority: read this first9 pages · general-conditions
High
PDF, High priority: read this first7 pages · instructions-to-bidders
High
PDF, High priority: read this firstwage-determination
High
PDF, High priority: read this firstchecklist
High
PDF, High priority: read this firstspecifications
High
PDF, High priority: read this firstifb
High
PDF, High priority: read this firstspecifications
High
PDF, High priority: read this first5 pages · special-conditions
High
PDF, High priority: read this first1 page · wage-determination
High
PDF, Low priority1 page · affidavit
Low
PDF

Read all 13 documents

Every page of every file, in your free workspace.

Read the documents

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • 26350 Lynchburg, VA - CSO 70 Sewer ImprovementsOpen now, due in 10 days
  • Columbia, SC Major Pipe Rehabilitation GeopolymerOpen now, due in 20 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyMissouri → Public Works
Contacts2 people available
OfficeFlorissant, MO, 63031, USA

Interested Companies (2)

Pace ConstructionSt. Louis, MO
TaylorMade ConstructionSt. Louis, MO

Full Description

Show more
The City of Florissant seeks a request for proposal for Storm Sewer Improvements at intersection of Lindsay Lane and Florisota Drive Problem Being Addressed: Intersection floods and ponds, and no drainage system is in place. Project Description: Construct approximately 300 linear feet of storm sewer pipe and inlets to intercept and direct flow to the storm sewer. Improved structures include two (2) new curb inlet manholes and one (1) new curb inlet. The project must maintain an accessible Curb Ramp and ADA-compliant sidewalk. The contractor will need to have a lane closure and submit a traffic control plan to Florissant Police Department and the Florissant Engineering Division. Adjacent Projects Happening: Be aware that MSD's construction project on Lindsay Lane (13629) is scheduled to start in mid-April 2026 and will affect traffic along this road. Coordination to minimize impact to residents and travelers should be considered when possible. MSD Development Reviewed and Approved. No MSD Permits required. Please review the approved plan set attachment. General Requirements Bidders must carefully examine the entire site of the work and must make all necessary investigations to inform themselves thoroughly as to the facilities available, as well as to all the difficulties involved in the completion of all work in accordance with the specifications and any plans. Bidders are required to examine any maps, plans and data mentioned in the specifications. No plea of ignorance of conditions that exist, or that may hereafter exist, or of conditions or difficulties that may be encountered in the execution of the work under this contract will be accepted as an excuse for any failure or omission on the part of the Contractor to fulfill in every detail of all the requirements of this contract, nor accepted as a basis for any claims for extra compensation. It is understood that, except as otherwise specifically stated in the contract Documents, the Contractor shall provide, pay for and furnish all equipment, labor, tools, water, light, power, transportation, superintendence, temporary construction of every nature, and all other services and facilities of every nature whatsoever necessary to execute, complete, and deliver the work within the specified time. The Contractor shall remove vegetation, improvements, or obstructions which interfere with project scope as outlined in plan specifications. All debris associated with this removal will be hauled away at the Contractor's expense and be disposed of lawfully. The Contractor shall be responsible for coordinating all Utility Relocation. The Contractor shall ensure safe traffic conditions, and must implement a comprehensive Traffic Management Plan (TMP) that includes proper planning, worker and public safety measures, and communication. This involves creating a detailed TMP before work begins, utilizing clear signage and flaggers, and coordinating with local authorities. This plan must be submitted at the time of Excavation Permitting. The Contractor shall keep the project area and public rights-of-way reasonably clear at all times and on completion of the work, the Contractor shall remove all equipment and materials brought onto the project area by the Contractor and used in the performance of the contract and shall leave the entire project area in a totally cleared, neat and level condition. Trash burning on the project area is prohibited and none of the materials required to be removed from the project area under this contract shall be buried on the project area or deposited or placed at any place other than a sanitary landfill. Permits Excavation Permits must be secured from the City of Florissant before proceeding with the work under this contract. Permit fees will be waived by the City. Said work is to be completed in accordance with all applicable federal and state rules and regulations. MSD Dev Reviewed and Approved. No MSD Permits required in conformance with the MSD standard and specifications and subject to inspection, final acceptance and submission of final plans corrected for actual construction ( MSD Accela # 21MSD-00415). Lot Restoration The Contractor shall leave the project site clean and free of any and all debris. The Contractor shall grade the ground surface to conform to the existing adjacent grades and to insure surface drainage and restore surface. The Contractor is responsible for restoring any sidewalk and ramps to comply with ADA regulations, curb or street that is affected by the project scope in compliance with current published standards and specs. Reporting Requirements The Contractor shall immediately report by telephone and written notice to the City Engineer for the City of Florissant when it is discovered that a time frame may not be met due to complications incurred during the normal scope of work. Following the award of this contract, the City of Florissant shall notify the Contractor of the contact personnel. The Contractor shall fully coordinate all activities in the performance of the contract with those of the City of Florissant Engineering Office. As the work of the Contractor progresses, advice and information on matters covered by the Contractor shall be made available by the Contractor to the City of Florissant throughout the effective period of the contract. Coordination The contractor shall fully coordinate all contract activities with those activities of the City. As the work of the contractor progresses, advice and information on matters covered by the contract shall be made available by the contractor to the City. The City's representative will visit the site at intervals appropriate to the stage of construction to become and remain familiar with the progress and quality of the work and to determine if the work is proceeding in accordance with the Contract. However, the City's representative will not be required to make exhaustive or continuous on-site inspections to check the work. The contractor will need to have a lane closure and submit a traffic control plan to Florissant Police Department and Florissant Engineering Division. *

Get AI-powered intelligence on the opportunities still open

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS