This Solicitation opportunity from Indiana was posted on July 24, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
Stratford Forest Blockage Removal
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
Background The Allen County Surveyor's Office is responsible for the maintenance and repair of regulated drains within the county. The goal of this contract is to perform blockage removal on the Stratford Forest Drain, specifically addressing issues caused by tree roots that have infiltrated the storm pipe system. Work Details The contractor is required to complete the following tasks: 1. Remove two Cottonwood trees that have roots in the storm pipe system. 2. Grind the stumps down to 4 inches below existing ground level and haul them out. 3. Replace the stumps with topsoil. 4. Seed all disturbed areas with a residential seed mix, applying straw and fertilizer. 5. Haul away all trash, rubbish, and spoils for disposal. 6. Restore all ground disturbed during the repair project to preconstruction conditions. Period of Performance The work is expected to be completed by October 10, 2025. Place of Performance All work will take place in Lake Township, Section 36, within Stratford Forest off Bass Rd, between Twelfth Night, Shakespeare, and Desdemona streets. Bidder Requirements All drain work is subject to approval by the Allen County Surveyor's Office. A 48-hour notification for inspection is required before work can begin.
General Info
Documents
1AI Contract Breakdown
Uniform Contract FormatContract not broken down yet
CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.
Timeline
Submission Closed
Organization & Contact Information
Full Description
Work Details The contractor is required to complete the following tasks:
1. Remove two Cottonwood trees that have roots in the storm pipe system. 2. Grind the stumps down to 4 inches below existing ground level and haul them out. 3. Replace the stumps with topsoil. 4. Seed all disturbed areas with a residential seed mix, applying straw and fertilizer. 5. Haul away all trash, rubbish, and spoils for disposal. 6. Restore all ground disturbed during the repair project to preconstruction conditions.
Period of Performance The work is expected to be completed by October 10, 2025.
Place of Performance All work will take place in Lake Township, Section 36, within Stratford Forest off Bass Rd, between Twelfth Night, Shakespeare, and Desdemona streets.
Bidder Requirements All drain work is subject to approval by the Allen County Surveyor's Office. A 48-hour notification for inspection is required before work can begin.
Earlier notices in this NAICS code
Posted before this notice, open and closed
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS
