Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Pennsylvania was posted on June 12, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Stream Restoration of Unami Creek

Closed
PennBid: 143052State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
SLED
Seminole Boat Ramp
Solicitation # 26-0075-MA
The City of Clearwater is soliciting bids for the Seminole St. Boat Ramp Restoration project in Clearwater, Florida. The scope of work involves the comprehensive repair and restoration of an existing boat ramp facility that has suffered typical degradation. Key activities include the removal of the existing structure, dredging and grading of native soils, placement of gravel fill, and the final design and installation of new concrete boat ramps. The finished facility must feature four launching bays providing eight total ramps, with two outer ramps measuring approximately 56 feet and six interior ramps measuring approximately 46 feet from mean high water to the toe. The completed ramps must be capable of supporting vessels exceeding 35 feet with combined weights over 10 tons. Additional requirements include the temporary relocation and preservation of floating docks and gangways to ensure ADA-compliant travel. The project is categorized as marine construction with an estimated value of 750,000 dollars. Bidders must provide a bid security equal to 10 percent of their maximum bid price and furnish payment and performance bonds within ten days of a contract award. The period of performance is 180 calendar days from the Notice to Proceed. Contractors must choose between two construction sequencing options: Alternate A, which utilizes a phased closure to minimize public disruption, or Alternate B, which allows for a maximum 45-day simultaneous closure of all ramps. Technical specifications require concrete with a compressive strength of 4,000 PSI and a minimum design load of 300 PSF. Environmental compliance is mandatory, requiring the implementation of Stormwater Pollution Prevention Plans and the use of turbidity curtains.
Public Works

POSTED

about 9 hours ago

DEADLINE

in 21 days

AI Contract Overview

Show more

The project involves stabilizing and restoring approximately 300 linear feet of streambank along both sides of Unami Creek, focusing on re-grading and erosion repair to meet Pennsylvania Department of Environmental Protection (PADEP) pollution reduction standards. The work emphasizes naturalization techniques, including the installation of jute matting combined with live stake plantings, to promote ecological stability and habitat restoration. All materials, labor, and equipment must conform to PennDOT Publication 408, PADEP guidelines, Richland Township standards, and the specific plans prepared by Gilmore & Associates, dated November 16, 2023. The contract, titled "Stream Restoration of Unami Creek," is solicited under PennBid with a response deadline of July 30, 2024. It is targeted at projects with a budget range between $150,000 and $300,000 and is managed by Richland Township in Pennsylvania. The project aims to improve streambank stability, water quality, and ecological health through a comprehensive restoration effort that adheres to state and local standards. Interested parties can find additional details and submit proposals via the provided PennBid link.

General Info

Agency

Pennsylvania → Richland Township

Place of Performance

PA, USA

Set-Aside

NONE

Documents

51

00 21 13.1 Instructions for Electronic Bidding

PDF, High priority: read this firstsubmission-instructions
High

Contract 999-1019-02: Bidder Acknowledgement Form

PDF, High priority: read this firstother
High

Contract 999-1019-02: Bidder Qualification Statement

PDF, High priority: read this firstpast-performance
High

Contract 999-1019-02: Stream Restoration of Unami Creek Agreement

PDF, High priority: read this firstcontract-document
High

Contract No. 999-1019-02: Stream Restoration of Unami Creek Project Manual

PDF, High priority: read this firstspecifications
High

Document 00 21 13 - Instructions to Bidders

PDF, High priority: read this firstitb
High

Document 00 41 00 Bid Form

PDF, High priority: read this firstbid-form
High

Document 00 73 00 01 - Supplementary Conditions

PDF, High priority: read this firstspecifications
High

Document 00 91 13 - Addenda

PDF, High priority: read this firstamendment
High

EJCDC Standard General Conditions of the Construction Contract

PDF, High priority: read this firstspecifications
High

Project 24-05721 - Stream Restoration of Unami Creek Prevailing Wage Rates

PDF, High priority: read this firstwage-determination
High

Section 01 11 13 - Summary of Work: Unami Creek Stream Restoration

PDF, High priority: read this firstsow
High

Section 01 22 00 - Measurement and Payment

PDF, High priority: read this firstspecifications
High

Section 01 29 00 - Contract Considerations

PDF, High priority: read this firstspecifications
High

Section 01 31 00 Coordination and Meetings

PDF, High priority: read this firstspecifications
High

Section 01 33 00 - Submittals

PDF, High priority: read this firstspecifications
High

Section 01 40 00 Quality Control

PDF, High priority: read this firstspecifications
High

Section 01 42 13 Organization and Reference Acronyms

PDF, High priority: read this firstspecifications
High

Section 01 50 00 Construction Facilities and Temporary Controls

PDF, High priority: read this firstsow
High

Section 01 55 26 - Traffic Regulation

PDF, High priority: read this firstspecifications
High

Section 01 56 39 Landscape Protection

PDF, High priority: read this firstspecifications
High

Section 01 57 13 - Soil Erosion and Sediment Control

PDF, High priority: read this firstspecifications
High

Section 01 57 14 Erosion Control Blanket

PDF, High priority: read this firstspecifications
High

Section 01 60 00 Material and Equipment

PDF, High priority: read this firstspecifications
High

Section 01 70 00 - Contract Closeout

PDF, High priority: read this firstspecifications
High

Section 31 11 00 - Clearing and Grubbing

PDF, High priority: read this firstspecifications
High

Section 31 20 00 - Earthwork

PDF, High priority: read this firstspecifications
High

Section 31 23 16.26 Rock Removal

PDF, High priority: read this firstsow
High

Section 31 23 33 - Excavation, Backfill, and Compaction

PDF, High priority: read this firstspecifications
High

Section 31 25 14.16 - Rolled Erosion Control Fabric

PDF, High priority: read this firstspecifications
High

Section 32 92 00 – Finish Grading, Seeding, and Sodding

PDF, High priority: read this firstsow
High

Section 32 93 00 Landscaping

PDF, High priority: read this firstspecifications
High

Section 32 93 01 - Trees, Plants, and Ground Cover

PDF, High priority: read this firstspecifications
High

Section 32 93 02 - Exterior Planting

PDF, High priority: read this firstspecifications
High

Section 32 93 45 - Live Stake Plantings

PDF, High priority: read this firstspecifications
High

Section 33 05 29 - Stream Crossing

PDF, High priority: read this firstspecifications
High

Stream Restoration of Unami Creek - List of Drawings

PDF, High priority: read this firstspecifications
High

Unami Creek - Bid Table (BT-29KY)

XLSX, High priority: read this firstbid-schedule
High

Unami Creek Stream Restoration Plans

PDF, High priority: read this firstspecifications
High

00 45 53 Agreement of Surety - Stream Restoration of Unami Creek

PDF, Low priorityother
Low

00 61 13.13 - Performance Bond

PDF, Low prioritycontract-document
Low

Appendix B - Public Works Employment Verification Form

PDF, Low priorityother
Low

Contract 999-1019-02: Consent of Surety to Final Payment

PDF, Low priorityother
Low

Contract 999-1019-02: Contractor's Affidavit

PDF, Low prioritycontract-document
Low

Contract 999-1019-02: Contractor's Release of Liens

PDF, Low prioritycontract-document
Low

Contract 999-1019-02: Maintenance Bond - Stream Restoration of Unami Creek

PDF, Low prioritymaintenance-bond
Low

Contract No. 999-1019-02 Stream Restoration of Unami Creek - Table of Contents

PDF, Low priorityother
Low

Doc 00 62 16 - Certificate of Insurance (Stream Restoration of Unami Creek)

PDF, Low priorityspecifications
Low

Document 00 43 13 Bid Bond (Penal Sum Form)

PDF, Low prioritybid-bond
Low

Document 00 45 19 Non-Collusion Affidavit

PDF, Low priorityother
Low

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyPennsylvania → Richland Township
ContactsNo contacts available
OfficeN/A
Organization / Agency
Pennsylvania → Richland Township
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
This project involves the streambank stabilization and naturalization of approximately 300 linear feet along both sides of the Unami Creek. The work includes re-grading and stabilization to repair the eroded streambank to meet the PADEP pollution reduction criteria. Additional improvements include the installation of jute matting with live stake plantings. All material, labor, and equipment necessary shall be in accordance with PennDOT Publication 408, PADEP, Richland Township Standards and the plans entitled Stream Restoration of Unami Creek as prepared by Gilmore & Associates, dated November 16, 2023.

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS