Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Vermont was posted on May 30, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Streambank Stabilization Project

Closed
EWP963State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237310
New
SLED
El Rancho Drive, La Madrona Drive Guardrail Project, Federal Project No. HSIPL-5936(135)
Solicitation # 40579
The El Rancho Drive and La Madrona Drive Guardrail Project, Federal Project No. HSIPL-5936(135), is a public infrastructure safety initiative managed by the County of Santa Cruz Department of Public Works. The project involves the installation of the Midwest Guardrail System and associated infrastructure repairs across 16 total locations, specifically 6 locations along El Rancho Drive and 10 locations along La Madrona Drive. The scope of work includes the removal of existing guardrails and AC dikes, cold planing AC pavement to a depth of 2 inches, constructing new AC dikes, and building earth retaining structures. The estimated cost of the project is 812,997 USD, with a required completion timeframe of 70 working days. The project is subject to strict federal and state regulations, including Buy America requirements for iron, steel, and manufactured products, and adherence to the Davis-Bacon and Related Act. It is a prevailing wage project governed by the Department of Industrial Relations. Contractors must provide a bid bond or security, as well as faithful performance and payment bonds upon award. Compliance requires rigorous documentation, including mill tags for steel products, certificates of compliance, and a clear chain of custody record verified by the Engineer. Proposals must be submitted electronically via the OpenGov portal and include mandatory certifications regarding debarment, non-collusion, and equal employment opportunity.
Public Works

POSTED

about 8 hours ago

DEADLINE

in 23 days

AI Contract Overview

Show more

The contract involves a streambank stabilization project aimed at restoring the bank to its pre-flood condition by installing a 140-foot-long Type III stone fill slope with a key way. The slope will be stabilized using grubbing materials and re-vegetation through plantings to ensure long-term stability and ecological recovery. The project is funded by the Natural Resource Conservation Service Emergency Watershed Protection Program, and all work must comply with their specific terms and conditions. Interested parties can obtain draft final plans by contacting the town administrator or visiting the town's website. The project is managed by the Town of Berlin in Vermont, with a contract value estimated between $50,000 and $150,000, and responses are due by June 17, 2024. The primary point of contact is Ture Nelson, reachable via email or phone.

General Info

Place of Performance

VT, USA

Set-Aside

NONE

Documents

0

No documents available

No documents were posted with this contract.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • Opportunity to quote asphalt repairs_Laura Street Sewer Improvements ProjectOpen now, due in 10 days
  • Terrace Drive Sewer System Improvements, Chimney RockOpen now, due in 14 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyVermont → Town of Berlin
Contacts1 person available
OfficeN/A

Full Description

Show more
The proposed restoration involves the installation of a 140 foot long Type III stone fill slope with a key way to approximately re-establish the pre-flood dimensions. The stone fill slope will be stabilized with grubbing materials and plantings to re-vegetate the bank. This project is funded by the Natural Resource Conservation Service Emergency Watershed Protection Program and all their terms and conditions must be adhered to. For a copy of the draft final plans please contact Sign up to see this detail or visit berlinvt.gov

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS