Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

Streambed Alteration and Ecological Mitigation

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract focuses on streambed alteration and ecological mitigation for prime contractors working on California Department of Fish and Wildlife projects. The scope of work includes the installation of temporary stream crossings and the implementation of erosion control measures using materials such as riprap, coir logs, and silt fences. All activities are performed using small-scale earthmoving equipment to ensure the delivery of completed riparian restoration and functional stream crossings. The project must strictly adhere to the ecological impact mitigation measures outlined in Agreement No. EPIMS-MEN-66697-R1 and comply with all CEQA requirements. Managed under NAICS code 238910, the contract is associated with the California Department of Forestry and Fire Protection and is centered on maintaining environmental integrity during infrastructure installation.

General Info

Subcontract for streambed alteration and ecological mitigation for California Department of Fish Wildlife.

Agency

California Forestry and Fire Protection, Department of

Place of Performance

CA

Set-Aside

NONE

Documents

This scope was carved out of EPIMS-MEN-66697-R1.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Streambed Alteration Agreement No. EPIMS-MEN-66697-R1 for Nonindustrial Timber Harvesting Plan (NTMP) 1-92NTMP-003-MEN

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

subcontract

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia Forestry and Fire Protection, Department of
ContactsNo contacts available
OfficeN/A
Organization / Agency
California Forestry and Fire Protection, Department of
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Performs streambed alteration and mitigation for prime contractors on California Department of Fish and Wildlife (CDFW) projects. Installs temporary stream crossings and erosion control using silt fences, riprap, and coir logs. Implements ecological impact mitigation measures per Agreement No. EPIMS-MEN-66697-R1 and CEQA requirements. Utilizes small-scale earthmoving equipment. Delivers installed stream crossings and completed riparian restoration.

Similar Contracts

Same NAICS industry code

NAICS: 238910
New
SLED
Livermore Village Infrastructure Project, Lightwell Stair Replacement
Solicitation # DR583018
The City of Livermore is soliciting bids for the L Street Parking Garage Lightwell Stair Replacement project, identified as solicitation DR583018. The scope of work involves the demolition of existing concrete lightwell stairs and the installation of a new steel stair assembly featuring precast concrete treads, handrails, and associated structural framing. The project requires the contractor to provide all necessary concrete formwork, reinforcing steel, and metal fabrication, ensuring that the final assembly complies with the 2010 ADA Standards for Accessible Design and governing building codes. Because the parking garage will remain fully operational during construction, the contractor must implement careful scheduling and temporary traffic control systems. The contract is awarded based on a low-bid selection process, requiring a signed and sealed bid proposal accompanied by a bid schedule and a bid security deposit equal to ten percent of the maximum bid amount. Technical requirements include shop drawings and calculations signed by a California-registered Civil Engineer, with structural designs adhering to AISC, AWS D1.1, and ASCE 7 seismic standards. The contractor is responsible for all temporary utilities, site access, and environmental controls. Performance is monitored by the City and its Engineer, with progress payments processed within 30 days of certification. Required security for the awarded contract includes payment, performance, and warranty bonds.
City of Livermore

POSTED

about 5 hours ago

DEADLINE

in 20 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS