Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 30 at 2:00 PM EDT

Register Free →

Street Lighting Installation

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract for the City of Santa Ana involves the installation of street lighting infrastructure for prime contractors on Public Works projects. The scope of work includes installing street light poles according to Standard Plan 1126E, 1,200 linear feet of 3#8 AWG conductor wires, 1,100 linear feet of 2 inch PVC conduit, and No. 3.5 pull boxes. Additionally, the contractor is responsible for the removal and salvage of existing electrical equipment to deliver a fully operational lighting system. All work must comply with the 2023 Edition of Caltrans Standard Plans and the Community Workforce Agreement. The project is located in Santa Ana, California, under NAICS code 238210. Interested parties must submit their responses by October 7, 2026.

General Info

Subcontract for street lighting installation in Santa Ana, California, due October 7, 2026.

Agency

California → CITY OF SANTA ANAView Agency

NAICS

238210 - Electrical Contractors and Other Wiring Installation ContractorsView NAICS

Place of Performance

Santa Ana, CA, 92701, USA

Set-Aside

NONE

Documents

This scope was carved out of 27-6018.

The full solicitation package (2 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

18th St Street Lighting

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → CITY OF SANTA ANA
ContactsNo contacts available
OfficeN/A
Organization / Agency
California → CITY OF SANTA ANA
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Installs street lighting infrastructure for prime contractors on City of Santa Ana Public Works projects. Installs street light poles per Std. Plan 1126E, 1,200 LF of 3#8 AWG conductor wires, 1,100 LF of 2" PVC conduit, and No. 3½ pull boxes. Performs removal and salvage of existing electrical equipment. Work must conform to Caltrans Standard Plans (2023 Edition) and the Community Workforce Agreement. Delivers an operational lighting system.

Similar Contracts

Same NAICS industry code

NAICS: 238210
New
Federal
Full Start-Up Commissioning of Data Center Cooling Infrastructure and UPS battery
Solicitation # W912HQ26S0077
The U.S. Army Corps of Engineers Headquarters is soliciting a firm-fixed-price contract under Simplified Acquisition Procedures for the full start-up and commissioning of existing data center environmental control systems at Building 2592 in Alexandria, Virginia. The scope of work includes the commissioning of twelve Liebert CRV units, two Liebert IRC controllers, and one Multistack rooftop glycol chiller based on original design specifications. Additionally, the contractor must perform the replacement and EPA-compliant disposal of 80 Eaton Uninterruptible Power Supply batteries, including all necessary testing and calibration. All work must be completed within 90 days of the award. This procurement is a small business set-aside with a size standard of 19 million dollars. A mandatory site visit is required on September 18 at the Cude Building 2592, and offers are due by September 25. To be eligible, offerors must be U.S. citizens or nationals, possess a valid government ID and driver's license, and be registered in the System for Award Management. Award decisions will be based on the most advantageous offer, evaluating technical capability, past performance, and price. Proposals must include a technical work plan limited to ten pages and a detailed price proposal on company letterhead. The contract requires a payment and performance bond, adherence to specific wage determinations, and compliance with DFARS cybersecurity and EPA disposal regulations.
W4LD USA Hecsa

POSTED

about 1 hour ago

DEADLINE

in 1 day
View Details
NAICS: 238210
New
SLED
Existing Generators Replacement Aguadilla, PR
Solicitation # 872298
This project involves the complete replacement of two existing power generators at the Aguadilla Detention Facility in Aguadilla, Puerto Rico. The scope of work requires the installation of one 100 kW and one 150 kW Perkins diesel generator, both featuring stainless-steel enclosures to protect against salt air and moisture, and secured to the existing concrete slab using Grade 5 or higher galvanized anchor bolts. The project also includes the installation of two new NEMA 3R automatic transfer switches and the performance of load bank testing for both units. The contract is a Firm-Fixed-Price task order issued under an 8(a) Multiple Award Construction Contract (MACC) IDIQ, with an estimated magnitude between $250,000 and $300,000. The period of performance is 270 calendar days from the Notice to Proceed, with a requirement to submit a project schedule within 15 days of that notice. Work must be performed during regular business hours, Monday through Friday, from 7:30 am to 4:00 pm. Award will be based solely on the lowest total evaluated price. Key compliance requirements include adherence to the Buy American Act, Davis-Bacon prevailing wage rates per determination PR20260001, and strict security protocols, including the signing of DHS non-disclosure agreements and the acquisition of ICE-provisioned PIV cards for personnel. All payment requests must be submitted electronically via the Invoice Processing Platform and accompanied by certified payroll.
Bristol Alliance of Companies

POSTED

about 9 hours ago

DEADLINE

in 5 days
View Details
NAICS: 238210
New
SLED
LED Lighting and Occupancy Sensor Upgrades DRAFT
Solicitation # 872291
The LED Lighting and Occupancy Sensor Upgrade project for the Buffalo Federal Detention Facility in Batavia, New York, is a Firm-Fixed-Price task order issued under an 8(a) Multiple Award Construction Contract (MACC) IDIQ. The scope of work involves providing all engineering, labor, equipment, and materials to upgrade the facility with energy-efficient LED lighting fixtures and occupancy sensors, including the removal and proper disposal of existing fluorescent fixtures, lamps, and ballasts. The project has an estimated magnitude between 2 million and 2.3 million dollars and a period of performance of 180 calendar days from the notice to proceed. The award will be based solely on the lowest total evaluated price. Key contractor requirements include the submission of a Quality Control Plan within 15 days of award and a site survey within 30 days. Deliverables include product submittals, a commissioning report verifying 100 percent fixture and control operation, a minimum two-hour training session for facility personnel, and final closeout documentation such as as-built drawings and an 18-month labor and materials warranty. The contract mandates compliance with the Davis-Bacon Act for wages, as well as ADA, OSHA, ACA, IBC, and NFPA standards. Payment requests must be processed electronically via the Invoice Processing Platform and accompanied by certified payroll.
Bristol Alliance of Companies

POSTED

about 9 hours ago

DEADLINE

in 5 days
View Details
NAICS: 238210
New
SLED
Conex Offices for Forensics Personnel - St. Thomas
Solicitation # 872300
This firm-fixed-price task order, issued under an 8(a) Multiple Award Construction Contract (MACC) IDIQ, requires the provision and installation of two 40ft x 8ft steel FLEXTAINER conex offices at the HSI Facility in St. Thomas, US Virgin Islands. These units are designed for forensic science technicians and must include R-11 insulation, vinyl flooring, four LED lamps, 120V electrical outlets, and two split-system A/C units per office. Security features must include a steel door with a Cypher lock and four security windows. Each unit must also be equipped with a 5-pound ABC fire extinguisher. The offices will be installed on 3k PSI reinforced concrete slabs measuring 42ft x 10ft x 6in with #4 rebars and connected to the nearest electrical circuit via 2-inch PVC or uPVC conduit. The project has an estimated magnitude between $250,000 and $300,000, with a total period of performance of 364 calendar days from the Notice to Proceed. Award will be based on the lowest total evaluated price, considering the technical approach, safety and quality control plans, and price. Contractors must comply with the Buy American Act, adhere to the VI20260001 wage determination for prevailing wages, and ensure all personnel sign the DHS Form 11000-6 Non-Disclosure Agreement. Key administrative requirements include submitting payment requests via the Invoice Processing Platform (IPP) with certified payroll and providing a project schedule within 15 calendar days of the Notice to Proceed. All work must meet NFPA 70 and International Building Code standards.
Bristol Alliance of Companies

POSTED

about 9 hours ago

DEADLINE

in 5 days
View Details
NAICS: 238210
New
CBP: Replacement Fiber Line
Solicitation # CBP: Replacement Fiber Line
The Earle C. Clements Job Corps Center, operated by Management and Training Corporation (MTC) for the U.S. Department of Labor, is soliciting a fixed-price, single lump sum contract to replace existing multi-mode fiber optic cabling with 12 strand single mode fiber optic cabling. The project involves providing all labor, equipment, and materials to establish network connectivity between the building 2436 network closet (MDF) and the building 2443 Maintenance office (IDF) in Morganfield, Kentucky. Key deliverables include the removal of retired aerial fiber lines and splice boxes from utility poles and the installation of new 12 strand single mode aerial fiber using center-owned poles, utilizing Belden FS3L0024NS fiber or an equivalent brand. Bids are due by October 5, 2026, and will be evaluated based on overall best value. To be considered for award, bidders must complete a physical site visit, sign the attendance roster, and submit a bid bond guarantee, cashier's check, or money order. Performance and payment bonds are required for bids equal to or greater than 25,000 dollars, and the surety company must hold at least an A- rating. The contract is set aside for various small business categories, including SDB, WOSB, HUBZone, and SDVOSB, and requires compliance with NAICS code 238210. Awardees must adhere to Davis-Bacon Act prevailing wage rates as specified in General Decision Number KY20250041 and provide a Unique Entity Identifier (UEI) number. Additional requirements include strict adherence to government security and confidentiality safeguards and the submission of a supplier self-certification and set-up form.
Earle C. Clements Job Corps Center

POSTED

about 9 hours ago

DEADLINE

in 11 days
View Details
NAICS: 238210
New
Los Angeles Job Corps Egress Lighting
Solicitation # Emergency Egress Lighting
Management & Training Corporation (MTC) is seeking a small business electrical contractor under NAICS code 238210 to provide and install emergency egress lighting at a warehouse facility located at 424-426 Towne Avenue, Los Angeles, California. The scope of work includes the installation of four emergency egress lights: two near the primary front exit doors, one on the storage area wall, and one on the mezzanine level. The contractor is responsible for all labor, materials, equipment, and electrical work, including wiring, circuit integration, battery backup testing, and site cleanup, ensuring all work complies with applicable life safety, fire, and electrical codes. This is a subcontracting opportunity with a response deadline of September 25, 2026, at 3:00 PM PT. Bidders must submit a lump sum fee bid sheet, proof of insurance, three references, and a completed supplier packet containing a W-9, self-certification form, and acceptance of terms and conditions. Award will be based on best value as determined by MTC. The contract requires compliance with Service Contract Labor Standards under Wage Determination SCLS 2015-5613 Rev 31 and adheres to FAR regulations regarding small business utilization, minimum wages, and the protection of sensitive government information. Invoicing should be submitted weekly or bi-weekly, and the facility is exempt from sales tax under the Workforce Investment Act.
MTC Los Angeles Job Corps

POSTED

about 9 hours ago

DEADLINE

in 1 day
View Details

More opportunities from California → CITY OF SANTA ANA

Same awarding agency

NAICS: 237130
New
SLED
18th St Street Lighting
Solicitation # 27-6018
The City of Santa Ana Public Works Agency is soliciting bids for Project No. 27-6018, which involves the installation of new street lighting infrastructure on 18th Street. The scope of work includes furnishing and installing street light poles, foundations, LED luminaires, luminaire arms, wiring, and fuse holders, as well as the installation of 2 inch PVC conduit and various pull boxes. Additional requirements include the removal of existing poles, potholing, pre and post-construction CCTV inspection of sewer mains and laterals, and the potential furnishing of Ubicquia Ubicell Smart Streetlight Nodes. The contractor is also responsible for permanent asphalt concrete and Portland Cement Concrete trench pavement replacement, surface utility adjustments, landscaping and irrigation repair, root shaving, tree trimming, and comprehensive traffic control. The contract will be awarded to the lowest responsive and responsible bidder who possesses a valid California Class C-10 Contractor's license. Bids must be submitted electronically via PlanetBids by 2:00 pm on October 7, 2026. The project is subject to a Community Workforce Agreement and prevailing wage laws. Performance requires adherence to the 2023 Caltrans Standard Plans and City of Santa Ana specifications. The work must be completed within 40 working days from the Notice to Proceed, with an absolute maximum duration of 365 calendar days. Required security includes a bid bond of at least 10 percent of the bid aggregate, and subsequent performance and payment bonds at 100 percent of the contract price. All construction management, including inspections and submittals, will be handled through the Procore software platform.
Power and Communication Line and Related Structures Construction

POSTED

about 17 hours ago

DEADLINE

in 13 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS