Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

STRING POTENTIOMETERS

Awarded
F1S0AE0102B003Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This contract involves the procurement of string potentiometers specifically designed for use in the T-38C aircraft program. These devices function as transducers that measure linear position and velocity through a flexible cable and spring-loaded spool, providing critical positional data by directly connecting the measurement cable to moving parts. The potentiometers required must exactly match the existing units in terms of form, fit, and function to fit within the specialized space constraints of the T-38C. Precise dimensional requirements have been set for four part numbers, and custom mechanical drawings have been developed to ensure compatibility with the aircraft. Using alternate potentiometers would necessitate a costly and time-consuming redesign of the installation, including a two-month engineering effort and a T-2 modification package for installation, with estimated government costs of $25,200 for engineering and approximately $50,000 per aircraft for the mod package. FIRST MARK is the original designer, developer, and manufacturer of these string potentiometers and holds sole ownership of the associated technical proprietary data. This exclusivity emphasizes the necessity to source these parts from FIRST MARK to avoid significant re-engineering expenses and delays. The contract is identified under solicitation number F1S0AE0102B003, with Kimberly Rabatin as the point of contact. The nature of the contract underscores the critical importance of stringent adherence to the specified dimensions and proprietary design to maintain the operability and integrity of the T-38C system.

General Info

Procurement of FIRST MARK string potentiometers strictly matching T-38C specifications to avoid costly redesign.

Agency

N/A

NAICS

334519 - Other Measuring and Controlling Device Manufacturing

Place of Performance

Not specified

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseAwarded
Posted

Award Notice

Awarded

Contract was awarded

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyN/A
Contacts1 person available
OfficeN/A
Organization / Agency
N/A
Office AddressN/A
Contacts

Full Description

Show more
412 TENG/CL has a requirement for string potentiometers that will be used for the T-38C Program. This unit is a transducer that detects and measures lineal position and velocity utilizing a flexible cable and spring-loaded spool. Potentiometers are used to measure the length of a moving object. The measurement cable can be connected directly to the moving part to give a direct measurement of the point of interest. These potentiometers must have exact form, fit and function as the units presently installed in the T-38C. The following are specific dimensions that only fit the T-38C aircraft. The engineer had to measure the T-38C space that resulted in identifying the following dimension measurements: PART NUMBER DIMENSIONS 176-0521 2.49 in X .52 in 173-0241 1.28 in X .45 in 180-0803 1.49 in X 1.69 in 160-0643 1.81 in X 1.56 in Furthermore, drawings have already been designed by the mechanical engineers to fit in the aircraft. If we had to procure new potentiometers from another manufacturer, it would require a redesign of the aircraft installation and a new T-2 Mod Package to install the new potentiometers. The re-engineering and T-2 Mod Package would be very costly to the Government; Re-engineering would take approximately two months at a cost of $25,200 in man hours as shown in the following breakdown of labor rate and labor hours: LABOR CATEGORY LABOR RATE LABOR HOURS TOTAL Mechanical Engineer $105.00 120 $12,600 Electrical Engineer $105.00 120 $12,600 FINAL TOTAL $25,200 The T-2 MOd Package is estimated at $50,000 to install the new potentiometers per aircraft. Breakdown of labor rate and labor hours are: Model Maker $81.00 160 $12,960 Electrical Tech $81.00 160 $12,960 Dock Chief $81.00 80 $6,480 Mod Manager $103.00 160 $16,480 FINAL TOTAL $48,880 FIRST MARK designed, developed, configured and manufactured this unit. In addition, FIRST MARK solely owns the technical proprietary data.

Similar Contracts

Same NAICS industry code

NAICS: 334519
New
DIBBS
PROBE, HUMIDITY-TEMPERA
Solicitation # SPE4A5-27-T-2034
Solicitation SPE4A5-27-T-2034 is a request for quotations from the DLA Weapons Support ASC Supplier Oper OEM Division for the procurement of 12 humidity-temperature probes, identified by NSN 6685008037705. This critical application item must adhere to basic specification MIL-DTL-27723F and utilize connector class H per MIL-DTL-5051H with pin arrangements following MIL-STD-1651A Appendix A. The contract requires a first article test consisting of three probes, with the resulting test report conforming to MIL-HDBK 831. A specific focus is placed on monitoring sensor resistance during testing to ensure conformance with section 3.4.2.1, as failure to maintain these values will result in sensor failure. The procurement is not a small business set-aside and requires compliance with the Buy American Act and the Berry Amendment. Delivery is set as FOB Origin, with inspection and acceptance also occurring at the origin. Packaging and marking must comply with MIL-STD-2073-1E and MIL-STD-129. Due to the nature of the materials, suppliers must provide Safety Data Sheets and Hazard Warning Labels for approval by technical personnel prior to award in accordance with 29 CFR 1910.1200. Administrative requirements include the use of the Wide Area WorkFlow system for invoicing and adherence to NIST SP 800-171 and DFARS cybersecurity standards for safeguarding covered defense information.
DLA WEAPONS SUPPORT ASC SUPPLIER OPER OEM DIVISION

POSTED

about 9 hours ago

DEADLINE

in 8 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS