Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 5 at 2:00 PM EDT

Register Free →

Structural and Architectural Concrete Work

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The contract encompasses all aspects of structural and architectural concrete work including formwork installation, concrete pouring, and surface finishing for foundations, slabs, and other structural elements. This subcontract requires specialized expertise in precise concrete placement and finishing to meet architectural and structural standards, with work to be performed at an unspecified location under the oversight of Georgia Southern University. The solicitation was posted on July 16, 2026, and responses must be submitted by August 17, 2026, with a deadline of 7:00 PM Eastern Time. The NAICS code 238110 indicates the work falls under concrete construction services, and while no set-aside provisions are defined, participation is open to qualified subcontractors capable of meeting project specifications. All performance and compliance obligations are tied to the university’s requirements as outlined in the full solicitation available through the provided online link.

General Info

Concrete construction work for Georgia Southern University, due August 17, 2026, under NAICS 238110.

Agency

Georgia Southern UniversityView Agency

NAICS

238110 - Poured Concrete Foundation and Structure ContractorsView NAICS

Place of Performance

GA, USA

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyGeorgia Southern University
ContactsNo contacts available
OfficeN/A
Organization / Agency
Georgia Southern University
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Formwork, pouring, and finishing of concrete for foundations, slabs, and structural elements.

Similar Contracts

Same NAICS industry code

NAICS: 238110
New
SLED
Biffy Facility ImprovementsThe contract involves comprehensive upgrades to a biffy facility to meet stringent safety, sanitation, and operational standards, including construction of a non-combustible, explosion-proof structure with interior and exterior lighting, climate-controlled ventilation, fire suppression, and freeze protection heating. The facility will be designed for easy sanitization in accordance with NFPA 820 and FDA guidelines, equipped with secure access doors, integrated camera systems, and emergency eyewash and shower stations supplying tempered water. Critical infrastructure improvements include a redundant pump system with a duplicate backup pump and biffy tank to ensure uninterrupted operation and prevent backflow, alongside upgraded channel drains and wet well cleaning systems. The electrical and mechanical systems will be modernized to support these enhancements and ensure long-term reliability. The project is managed by the Aviation Project Management Group under the Port of Seattle, with Jay Kim listed as the primary point of contact and Savita Rishiraj as the project manager. While no solicitation number or set-aside details are provided, the NAICS code 238110 indicates it falls under building construction for commercial and industrial projects. The contract is currently in forecast status, posted on July 27, 2026, indicating it is a planned procurement requiring vendors to prepare for upcoming bidding. All work will be performed at the Port of Seattle facility, though the exact location within the port is unspecified in the provided data.
Aviation Project Management Group

POSTED

about 2 hours ago

DEADLINE

N/A
View Details

More opportunities from Georgia Southern University

Same awarding agency

NAICS: 236220
SLED
Botanical Garden ConservatoryGeorgia Southern University is soliciting a qualified Construction Management/General Contractor (CM/GC) for the new construction of a conservatory at its Botanical Garden in Statesboro, Georgia, under solicitation number PE-53900-RFP-2026-000000098, with proposals due by August 17, 2026 at 2:00 PM EST. The project is structured as a CM-At-Risk contract with a Guaranteed Maximum Price (GMP) not to exceed $8 million, where the selected firm will be paid actual costs plus a fixed fee, subject to GMP negotiation after technical evaluation. The selection process uses a trade-off methodology, prioritizing technical merit over price, with evaluation factors weighted at 25% for methodology and interview performance, 25% for overall impression of the firm and key personnel, 20% for relevant experience and team qualifications, 15% for previous performance, and 15% for the quality of the proposed management plan, including cost, schedule, safety, and subcontractor oversight. Compliance with Georgia state laws is mandatory, requiring submission of three exhibits: a Certification Form affirming no debarment or contract defaults, a Contractor Affidavit under O.C.G.A. §13-10-91(b)(1) certifying E-Verify compliance and providing employee identification documentation, and a Disclosure Statement revealing any conflicts of interest or business transactions with state entities in the past one to two years, with failure to submit or inaccuracies leading to immediate disqualification. Applicants must also provide IRS Form W-9, proof of a valid Georgia contractor’s license, a Certificate of Existence from the Georgia Secretary of State, bonding capacity of at least $42 million from a surety rated A- or better by A.M. Best, commercial general liability insurance totaling $8 million with a $5 million umbrella policy, a minimum current ratio of 1.0, and an Experience Modification Rate of 1.2 or less. All proposals must be submitted as a single .pdf file not exceeding 40 pages, emailed exclusively to Michelle Stewart at Georgia Southern University, with no printed copies accepted. The project team must include clearly identified key personnel with resumes, and proposers are expected to demonstrate strong communication skills, proximity to the site, familiarity with similar projects, and an ability to align with the university’s institutional and community goals. The contract does not include FAR clauses,
Commercial and Institutional Building Construction

POSTED

11 days ago

DEADLINE

in 22 days
View Details