Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Subcontract opportunity from California was posted on February 13, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Structural Inspection and Engineering Assessment

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 541330
New
SLED
Western Placerville Interchanges Phase 2.3 - Design & Env RFP Final Complete
Solicitation # 20261113026
The City of Placerville is soliciting proposals from qualified engineering firms for the Western Placerville Interchanges Phase 2.3 Project, specifically focusing on the US 50 Westbound Off-Ramp at Ray Lawyer Drive. The scope of work encompasses the full project lifecycle, from Project Approval and Environmental Document (PA&ED) through Plans, Specifications, and Estimate (PS&E), Right-of-Way Certification, bid support, and design support during construction. Key objectives include constructing a new westbound off-ramp, improving the intersection at Ray Lawyer Drive, and enhancing bicycle and pedestrian facilities. The project is located on the State Highway System, funded by State Transportation Improvement Program (STIP) funds, and will be delivered by the City under Caltrans oversight. The selected consultant must adhere to rigorous Caltrans and City of Placerville standards, including CEQA and NEPA environmental revalidation and the Caltrans Workplan Standards Guide WBS. Payment will be structured as actual cost plus a fixed fee, with progress payments made monthly. To avoid organizational conflicts of interest, the selected firm and its subconsultants are prohibited from providing construction management services. Proposals must be submitted by December 7, 2026, consisting of a technical proposal and a separate sealed cost proposal. Award decisions will be based on a 50/50 weighted split between the written proposal score and an interview score for short-listed firms.
City of Placerville

POSTED

about 2 hours ago

DEADLINE

in 20 days
NAICS: 541330
New
SLED
RFP27-016 Countywide Bicycle & Pedestrian Master Trails Plan
Solicitation # RFP27-016
The Board of Commissioners of Glynn County, Georgia, is soliciting proposals for a Countywide Bicycle and Pedestrian Master Trails Plan covering the Brunswick Area Transportation Study Metropolitan Planning Area, including St. Simons Island and unincorporated Glynn County. The project involves professional planning, analysis, and public engagement to identify network gaps and develop concept-level recommendations for 10 to 20 priority projects. Key deliverables include a scored ranked segment database, a prioritized network gap inventory, a Priority Projects Technical Memorandum with planning-level cost estimates, and a Policy Audit Matrix. All work must comply with FHWA regulations, 2 CFR Part 200, and environmental standards including the Clean Air Act and Clean Water Act. Proposals are evaluated based on practical merit and price, with a technical ranking performed before fee negotiations. The highest-ranked proposer will negotiate the final scope and fee, which is compared against the County's independent cost estimate. Applicants must provide GDOT prequalification documentation, a SAM.gov unique entity ID, and certifications regarding EEO practices and anti-lobbying. Technical requirements include strict GIS data standards using NAD 1983 State Plane Georgia East and the delivery of Esri file geodatabase feature classes. Proposals must be submitted via the County's eProcurement Portal by December 17, 2026.
Glynn County Board of Commissioners

POSTED

about 3 hours ago

DEADLINE

in about 1 month
NAICS: 541330
New
SLED
Citywide Active Transportation Plan RFP
Solicitation # 2026-11 (ATP)
The City of Tustin is seeking a qualified engineering and planning firm to develop a Citywide Active Transportation Plan (CATP). The project focuses on technical analysis, conceptual designs, and the creation of an implementation strategy, with a specific emphasis on public outreach targeting underserved populations, schools, and vulnerable roadway users. Key deliverables include 30 percent engineering concept plans for the top five ranked infrastructure projects, a comprehensive financial plan, and ADA-accessible electronic copies of all deliverables. The project is funded by the Caltrans Sustainable Transportation Planning Grant Program, with a maximum reimbursable amount of $425,000. Selection is based on a qualifications-based ranking process rather than cost, evaluating staffing, technical approach, public outreach experience, resource allocation, and client references. The successful consultant must comply with state funding requirements, maintain a city business license, and provide professional liability insurance, including tail insurance for five years post-completion. All accounting must conform to GAAP and 2 CFR Part 200, with reimbursement based on actual allowable costs. Proposals must be submitted via OpenGov by January 13, 2027, and must include a non-discrimination certification and a non-collusion affidavit.
Public Works

POSTED

about 15 hours ago

DEADLINE

in about 2 months

AI Contract Overview

Show more

The Santa Clara Valley Water District is seeking a subcontractor for a Structural Inspection and Engineering Assessment to evaluate roof structural integrity. The primary objective of this engagement is to ensure that the roof possesses the necessary load capacity and safety standards required to support coating and repair activities both during and after the work is completed. This opportunity was posted on February 13, 2025, and requires responses to be submitted by March 12, 2025. The project falls under NAICS code 541330, focusing on engineering services to maintain safety and structural stability for the district's facilities.

General Info

Documents

This scope was carved out of VW0558.

The full solicitation package (3 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Winfield Complex Roof Coating and Repair

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • DBE Subconsultant Opportunity - Qualifications for E Wells PFAS Groundwater Treatment ImprovementsOpen now, due in 15 days
  • Western Placerville Interchanges Phase 2.3 - Design & Env RFP Final CompleteOpen now, due in 21 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → Santa Clara Valley Water District
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Evaluation of roof structural integrity to ensure load capacity and safety during and after coating and repair work.

More opportunities from California → Santa Clara Valley Water District

Same awarding agency

NAICS: 237990
New
SLED
Tularcitos Creek Downstream North Hillview Drive Levee RepairThe Tularcitos Creek Downstream North Hillview Drive Levee Repair Project, managed by the Santa Clara Valley Water District, focuses on repairing approximately 2,932 linear feet of the west bank levee in Milpitas, California. The project aims to address erosion and damage caused by rodent burrowing to protect public safety and property. Reconstruction will utilize SMP-2 Method 1A, which involves installing a buried rock buttress to stabilize the channel embankment and provide a stable foundation over saturated soils. The scope of work includes dewatering, the installation and removal of two temporary access ramps, and bank stabilization, with a total temporary disturbance area of approximately 2.7 acres. A key objective is to restore the levee to design elevation to support a Letter of Map Revision and achieve FEMA accreditation. Construction is anticipated to take place from summer to fall 2027. The project is subject to strict environmental compliance under CEQA and NEPA, with specific requirements for equipment emissions. Contractors must use diesel engines meeting U.S. EPA Tier 4 Final standards and CARB-certified Level 3 filters for equipment over 50 horsepower, and haul trucks must be 2010 model year or newer. Additional mandates include the use of electric or alternative-fueled equipment where feasible, strict hazardous material containment protocols, and the performance of nesting bird surveys by a qualified biologist. The project also requires rigorous dust control measures and the submission of all equipment specifications for agency confirmation prior to the start of construction.
Other Heavy and Civil Engineering Construction

POSTED

1 day ago

DEADLINE

N/A
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS