Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Subcontract opportunity from California was posted on September 26, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Structural Steel & Fabrications

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238120
New
SLED
Corpyard Phase II - Connex Structural Anchoring & Welding: (REBID)
Solicitation # 26-091-ITB
The City of West Sacramento is soliciting bids for the Corpyard Phase II project to provide all labor, materials, equipment, and specialized tooling required to anchor 14 existing shipping containers to a cement-treated asphalt surface at 4300 West Capitol Avenue. The scope of work includes container pre-checks, drilling and cleaning holes, installing Bolthold asphalt anchors, bolting down plates, performing AWS welding for angle connections, and applying zinc-rich cold galvanizing spray for rust protection. All work must be performed according to PSE stamped drawings and structural calculations, with a total project duration of 90 working days from the Notice to Proceed. The estimated project value is 35,000 dollars. The contract will be awarded to the lowest responsive and responsible bidder. Bidders must provide a bid security of at least 10 percent of the total bid price, and the successful contractor must furnish performance and payment bonds for 100 percent of the contract price. Compliance with California prevailing wage requirements and registration with the California State Department of Industrial Relations is mandatory. Proposals must be submitted electronically via the OpenGov portal by November 17, 2026, at 1:00 PM. Payment terms include 95 percent payment of progress estimates within 30 days, with a 5 percent retention held until final acceptance by the Engineer.
Capital Projects - Construction

POSTED

2 days ago

DEADLINE

in 2 days

AI Contract Overview

Show more

The Sanger Unified School District in California is seeking a subcontractor for structural steel and fabrications for public school projects located in Laton. The scope of work includes the fabrication and installation of structural steel frames, metal decking, stairs, and railings, as well as miscellaneous metal items such as countertop brackets, gates, roof access ladders, guardrails, handrails, and bollards. All work must be performed in accordance with AWS and AISC standards. This subcontract opportunity falls under NAICS code 238120. The solicitation was posted on September 26, 2026, and the deadline for responses is October 23, 2026.

General Info

Sanger Unified School District seeks structural steel subcontractor for Laton school projects.

Documents

This scope was carved out of 20260925036.

The full solicitation package (4 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Sanger West High School, Building L Construction Project

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • Plumbing and Piping InstallationOpen now, due in 32 days
  • HVAC and Mechanical SystemsOpen now, due in 32 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → Sanger Unified School District
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Fabricates and installs structural steel and miscellaneous metals for prime contractors on California public school projects. Installs steel fabrications, metal decking, countertop brackets, gates, roof access ladders, guardrails, handrails, stairs, and bollards per AWS and AISC standards. Delivers installed structural steel frame, stairs, and railings.

More opportunities from California → Sanger Unified School District

Same awarding agency

NAICS: 236220
SLED
Alternative Education Campus ProjectThe Alternative Education Campus Project is a redevelopment initiative by the Sanger Unified School District to improve its educational and administrative campus located at 1801-1905 Seventh Street in Sanger, California. The scope of work includes the construction of 5,440 square feet of new buildings and the installation of 9,120 square feet of relocatable structures, including ten relocatable buildings. Key deliverables feature a joint dining and multipurpose room, Career Technical Education facilities, two turf areas, a playfield, and a new service yard and food delivery lot. Additionally, the project involves the interior renovation of the existing district office for administrative and child welfare use, the relocation of a resource room, and the construction of a new driveway and a 49-space parking lot with access to Seventh Street. The project is governed by a Mitigated Negative Declaration, with an approved monitoring plan and mitigation measures to ensure environmental compliance. Construction is scheduled to occur across 2027 and 2028, beginning with demolition, site preparation, and grading in 2027, followed by building construction through 2028. All construction contracts are required to include a standard inadvertent discovery clause regarding potential fossils. The project will maintain existing Alternative Education High School and Community Day School uses on site while integrating the relocated Community Day School into the campus.
Commercial and Institutional Building Construction

POSTED

about 2 months ago

DEADLINE

N/A
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS