Structural Steel & Metal Fabricator

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract for Chicago Public Schools involves the fabrication and erection of structural steel framing and metal components for prime contractors. The scope of work includes the production of window AC brackets and the application of zinc-rich coatings according to SSPC-Paint 20, with steel members galvanized to ASTM A123/A123M standards. Qualified providers must hold AWS D1.1/D1.1M and AWS B2.1/B2.1M welding certifications to ensure all installed structural steel and metal brackets meet required specifications. The solicitation was posted on September 25, 2026, with a response deadline of October 13, 2026, under NAICS code 238120.

General Info

Chicago Public Schools subcontract for structural steel fabrication and AC bracket installation.

Documents

This scope was carved out of 26-1448.

The full solicitation package (7 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Gary ES - Boiler 1 Leak Repair - Open to contracted pre-qualified pool for VARIOUS TRADES ONLY

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyIllinois → Chicago Public Schools
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Fabricates and erects structural steel framing and metal components for prime contractors on Chicago Public Schools facility projects. Galvanizes steel members to ASTM A123/A123M and fabricates window AC brackets. Applies zinc-rich coatings per SSPC-Paint 20. Requires AWS D1.1/D1.1M and AWS B2.1/B2.1M welding certifications. Delivers installed structural steel and metal brackets.

Similar Contracts

Same NAICS industry code

More opportunities from Illinois → Chicago Public Schools

Same awarding agency

NAICS: 238220
New
SLED
Gary ES - Boiler 1 Leak Repair - Open to contracted pre-qualified pool for VARIOUS TRADES ONLY
Solicitation # 26-1448
Chicago Public Schools is soliciting bids for the repair of Boiler 1 at Joseph E. Gary Elementary School under solicitation number 26-1448. The scope of work includes flame cutting and removing the rusted lower 12 inches of the boiler bottom and firebox leg, welding a new 3/4 inch mudbar and 3/8 inch steel plate to the base, and installing new 7/8 inch stay rods. Additional requirements include replacing two courses of firebrick in the combustion chamber, installing high-temperature fiberglass insulation, performing a burner tune-up, and securing all necessary building and boiler repair permits. All work must be performed during normal working hours and comply with Chicago Building Code, ASHRAE/IESNA 90.1, and specific CPS standards for boiler renovation and HVAC insulation. Bids must be submitted electronically via the EUNA/Bonfire portal by October 13, 2026. Qualified contractors must hold Hartford and National Board certifications for pressure vessel repair. Financial and compliance requirements are tiered based on bid price: a 5 percent bid bond is required for bids of 25,000 dollars or more, and bidders must be signatories to the relevant union at this threshold. For bids of 50,000 dollars or more, the premium cost for a Payment and Performance Bond must be included in the bid. Bids of 75,000 dollars or more require completed MBE/WBE documentation. Final acceptance requires a successful hydrostatic pressure test to verify zero leaks, a burner set-up combustion efficiency report, and written certification of manufacturer compliance.
Plumbing, Heating, and Air-Conditioning Contractors

POSTED

1 day ago

DEADLINE

in 17 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS