Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

Structural Steel Fabrication & Erection

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Agency

California Construction AuthorityView Agency

NAICS

332313 - Plate Work ManufacturingView NAICS

Place of Performance

CA, USA

Set-Aside

NONE

Documents

This scope was carved out of 021-26-003.

The full solicitation package (2 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

FRESNO SOLAR PROJECT

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia Construction Authority
ContactsNo contacts available
OfficeN/A
Organization / Agency
California Construction Authority
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Fabricates and installs steel frames for prime contractors on California Construction Authority projects. Fabricates steel canopy frames and erects cantilever steel columns using welding and bolting per AISC 360-22, AISC 341-22, and ASCE 7-22 standards. Delivers eight completed steel canopy support structures.

Similar Contracts

Same NAICS industry code

NAICS: 332313
SLED
Bulkheads For Rancho Penasquitos Hydroelectric Facility
Solicitation # NIB 26-02
The San Diego County Water Authority is soliciting bids under solicitation number 20260901030 for the procurement and delivery of six bulkheads and six reinforcement rings for the Rancho Penasquitos Pressure Control and Hydroelectric Facility in San Diego, California. The required deliverables include three 3/8-inch-thick 41.25-inch OD 2:1 semi-ellipsoidal bulkheads with three corresponding 3/8-inch-thick 42-inch OD reinforcement rings, as well as three 1/4-inch-thick 41.50-inch OD 2:1 semi-ellipsoidal bulkheads with three corresponding 1/4-inch-thick 42-inch OD reinforcement rings. The contract follows a strict timeline with a notice to proceed expected by September 18, 2026, and a final delivery deadline of October 15, 2026. The contract will be awarded to the lowest responsive and responsible bidder, though the Water Authority reserves the right to award the purchase order to multiple bidders or on an item-by-item basis. Bidders must submit a comprehensive response including the Exhibit C Bid Response Form with detailed pricing for items and shipping, acknowledgement of addenda 0 through 5, a tentative project schedule, and the Exhibit D SCOOP Schedule A-1 disclosing all subcontractors or vendors. Bids that appear unfair, unbalanced, or unreasonable will be deemed non-responsive, and sales tax will not be considered a factor in the bid determination.
San Diego County Water Authority

POSTED

8 days ago

DEADLINE

in 5 days
View Details

More opportunities from California Construction Authority

Same awarding agency

NAICS: 237990
SLED
FRESNO SOLAR PROJECT
Solicitation # 021-26-003
The Fresno Solar Project, solicitation number 021-26-003, involves the design and construction of eight new photovoltaic solar canopy structures within an existing parking area at the Fresno Flea Market and Fresno County Fairgrounds. The scope of work encompasses all labor, materials, and equipment necessary for site preparation, demolition, earthwork, and the installation of reinforced concrete pier foundations. The project includes the deployment of a photovoltaic system featuring high-efficiency Maxeon panels or equivalent, supported by steel frames, along with the installation of electrical distribution infrastructure, canopy lighting, and fire and life safety improvements. The contractor is responsible for paving, site restoration, and final testing and inspection. The project utilizes owner-supplied equipment, including a 12kV S&C padmount switch, a 12kV S&C PMH-3 disconnect switch, a 1000kVA transformer, and a 1600A switchboard and panelboard. All work must comply with the 2025 California Green Building Standards Code, the California Building Code, and various structural standards including ASCE 7-22, AISC 360-22, and ACI 318-19. Safety compliance is mandatory, specifically adhering to OSHA Excavation and Trench Safety Standards. The solicitation was posted on August 25, 2026, with a response deadline of September 21, 2026, and is managed by the California Construction Authority.
Other Heavy and Civil Engineering Construction

POSTED

15 days ago

DEADLINE

in 12 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS