Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Subcontract opportunity from Rhode Island was posted on September 28, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Structural Steel Repair and Plate Installation

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238120
New
SLED
Corpyard Phase II - Connex Structural Anchoring & Welding: (REBID)
Solicitation # 26-091-ITB
The City of West Sacramento is soliciting bids for the Corpyard Phase II project to provide all labor, materials, equipment, and specialized tooling required to anchor 14 existing shipping containers to a cement-treated asphalt surface at 4300 West Capitol Avenue. The scope of work includes container pre-checks, drilling and cleaning holes, installing Bolthold asphalt anchors, bolting down plates, performing AWS welding for angle connections, and applying zinc-rich cold galvanizing spray for rust protection. All work must be performed according to PSE stamped drawings and structural calculations, with a total project duration of 90 working days from the Notice to Proceed. The estimated project value is 35,000 dollars. The contract will be awarded to the lowest responsive and responsible bidder. Bidders must provide a bid security of at least 10 percent of the total bid price, and the successful contractor must furnish performance and payment bonds for 100 percent of the contract price. Compliance with California prevailing wage requirements and registration with the California State Department of Industrial Relations is mandatory. Proposals must be submitted electronically via the OpenGov portal by November 17, 2026, at 1:00 PM. Payment terms include 95 percent payment of progress estimates within 30 days, with a 5 percent retention held until final acceptance by the Engineer.
Capital Projects - Construction

POSTED

2 days ago

DEADLINE

in 1 day

AI Contract Overview

Show more

This subcontract for Structural Steel Repair and Plate Installation involves performing critical structural repairs for prime contractors on Rhode Island Department of Transportation bridge projects. The scope of work focuses on addressing section losses by installing repair plates and angles at girder ends and repairing beams. All fabrication and installation must be based on provided shop drawings and utilize structural steel plates, angles, and specialized welding equipment. The contractor is required to strictly comply with RIDOT structural specifications and CS-7/CS-8 submittals to ensure the delivery of reinforced girder ends and installed repair plates. This opportunity is categorized under NAICS code 238120 and is managed by the State of Rhode Island, with a response deadline of October 23, 2026.

General Info

Subcontract for RIDOT bridge structural steel repairs and plate installation due October 23, 2026.

Documents

This scope was carved out of TCB27006870.

The full solicitation package (12 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

2026 Statewide Steel Repairs

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • Plumbing and Piping InstallationOpen now, due in 32 days
  • HVAC and Mechanical SystemsOpen now, due in 32 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyState of Rhode Island
ContactsNo contacts available
OfficeN/A
Organization / AgencyState of Rhode Island
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Performs structural steel repairs for prime contractors on Rhode Island Department of Transportation bridge projects. Installs repair plates and angles at girder ends and repairs beams to address section losses. Fabricates steel components based on shop drawings using structural steel plates, angles, and welding equipment. Complies with RIDOT structural specifications and CS-7/CS-8 submittals. Delivers installed repair plates and reinforced girder ends.

More opportunities from State of Rhode Island

Same awarding agency

NAICS: 238210
New
SLED
RIC Electrical Upgrade Thorp Hall
Solicitation # RFQ27007133
Rhode Island College is soliciting a vendor for the electrical system upgrade of Thorp Hall, located in the campus residence hall area. The scope of work involves the demolition and removal of existing switchgear, panels, and data closets, followed by the furnishing and installation of new equipment, hardware, and electrical systems. The project also includes fiber optic backbone cabling and communications distribution system cabling. Key technical requirements include adherence to LEED v4 sustainability standards, ADA compliance for hardware, and strict labeling specifications using thermal transfer printers and specific Brady brand materials to ensure durability and legibility. The solicitation, RFQ27007133, requires a prebid meeting on November 20, 2026, at the Forman Center, with a response deadline of December 18, 2026. Contractors must provide bid, performance, and payment bonds, as well as an ACORD Certificate of Insurance. The project is subject to Rhode Island Prevailing Wage Rates, and payment applications must be submitted via notarized AIA G702 and G703 forms, with a retainage not exceeding five percent. Quality assurance is managed by the Architect, with all work meeting State Building Code and local regulations, and specific inspection protocols for firestopping and material moisture content.
Electrical Contractors and Other Wiring Installation Contractors

POSTED

2 days ago

DEADLINE

in about 1 month
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS