Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Ohio was posted on September 14, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Student Housing and Innovation Hub

Closed
https://dam.assets.ohio.gov/image/upload/ofcc.ohio.gov/Project_Opportunities/RFQs/2026/RFQ-20260615-CMR.pdfState & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 236220
New
Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements
Solicitation # construction-recharge-master-plan-update-basin-improvements-project-montclair-basin-improvements-2
RT Contractor Corp is soliciting bids for DBE subcontractors for the Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements, a project of the Inland Empire Utilities Agency located in California. The solicitation, identified as construction-recharge-master-plan-update-basin-improvements-project-montclair-basin-improvements-2, was posted on October 31, 2026, with a response deadline of November 4, 2026. This opportunity is specifically set aside for Disadvantaged Business Enterprises under NAICS code 236220. To be deemed responsive, bidders must strictly adhere to Disadvantaged Business Enterprise Good Faith Effort requirements developed by the Inland Empire Utilities Agency to secure project financing. Mandatory requirements include posting solicitations in an online publication for 30 consecutive calendar days and in a print newspaper for at least one day prior to the bid opening. Bidders must also provide proof of utilizing the Small Business Administration and the Minority Business Development Agency. While outreach documentation may be submitted up to three business days after the bid closing, proof of public notices and agency utilization must be included in the initial bid package to avoid being disqualified. Performance for subcontracting postings is focused on the Riverside or Los Angeles project areas.
RT CONTRACTOR CORP

POSTED

44 minutes ago

DEADLINE

in 3 days
NAICS: 236220
New
P084 NEXT GENERATION TORPEDO INTEGRATION LAB & P1016 Consolidated RDT&E Systems Facility – Newport, RI
Solicitation # p084-next-generation-torpedo-integration-lab-p1016-consolidated-rdte-systems-facility-newport-ri
J&J Contractors, Inc. is soliciting bids for the construction of the Next Generation Torpedo Integration Lab and the P1016 Consolidated RDT&E Systems Facility in Newport, Rhode Island. The primary project involves a 12,920 square foot multi-story steel frame laboratory and office facility featuring a shallow foundation, metal standing seam roof, and masonry and metal panel exterior walls. This scope encompasses comprehensive site preparations, including landscaping, parking, exterior lighting, and the installation of underground stormwater retention and utility systems. An additional option for the P1016 facility includes a 17,978 square foot laboratory with similar structural specifications and the demolition of an existing 548 square meter engineering facility. The solicitation is open to various small business designations, including SDB, WOSB, HUBZone, and VOSB. Bidders are required to provide pricing for a wide array of trades, ranging from demolition and structural steel to mechanical, electrical, and plumbing services. All work must adhere to Davis Bacon Wage Rates, and the project is exempt from sales tax. Interested parties must contact the primary point of contact to receive bid documents via Building Connected before the response deadline of November 30, 2026.
J&J CONTRACTORS, INC.

POSTED

44 minutes ago

DEADLINE

in 29 days
NAICS: 236220
New
Water Damage Restoration
Solicitation # G26-005
Solicitation G26-005 is for a single lump sum contract to perform multi-floor water damage restoration in Building 17 at the Grafton Job Corps Center in North Grafton, Massachusetts. Operated by Adams and Associates, Inc. for the U.S. Department of Labor, the project follows a fire sprinkler discharge that affected the first, second, and third floors, including dormitories, offices, and conference rooms. The scope of work includes the replacement and painting of drywall and ceilings, flooring and rubber wall base installation, electrical repairs, and the replacement of vanities and cabinets. All work must comply with NFPA-101 Life Safety Code, ADA, OSHA, EPA, and local Massachusetts building codes. The total period of performance is 105 days, with substantial completion required within 90 days of the Notice to Proceed and final completion within 15 days thereafter. Award will be based on Best Value, evaluated through price (60 points), quality (20 points), past performance (10 points), and schedule (10 points). Bidders must attend a mandatory site visit on November 3, 2026, and submit proposals by November 17, 2026. Required submission documents include a detailed cost breakdown for labor, materials, and equipment, a timeline for substantial completion, a 90-day bid guarantee, a valid Massachusetts Contractor's License, and certification of compliance with local Wage Rate decisions. Contractors must adhere to strict labor standards, including providing one hour of paid sick leave for every 30 hours worked and paying covered workers at least $13.65 per hour. Insurance requirements include automobile liability coverage of $200,000 per person and $500,000 per occurrence, with Adams and Associates, Inc. named as an additional insured. Payment terms are Net 30. Final acceptance is contingent upon a substantial completion walk-through and the resolution of a contractor-developed punch list.
Grafton Job Corps

POSTED

44 minutes ago

DEADLINE

in 16 days
NAICS: 236220
New
Springdale JCC –Dormitory Interior Renovation & Repairs
Solicitation # springdale-jcc-dormitory-interior-renovation-repairs
Career Systems Development Corporation, operating for the U.S. Department of Labor, is soliciting proposals for the interior renovation and repair of the North Wing dormitory at the Springdale Job Corps Center in Troutdale, Oregon. The project focuses on restoring water-damaged interior spaces to safe residential use, including sixteen residential rooms and bathrooms, mechanical rooms, and various utility areas. The scope of work involves drywall installation, joint finishing, and painting, as well as the temporary removal and re-installation of HVAC equipment. The contractor is responsible for all labor, materials, equipment, and supervision, ensuring occupied-building protection and the testing of all restored mechanical, plumbing, electrical, and life-safety systems prior to final acceptance. This solicitation is set aside for small businesses, including VOSB, SDVOSB, WOSB, and HUBZone certified firms. The project is subject to the Davis Bacon Act under wage determination OR20260100, requiring the submission of weekly certified payrolls. Awardees must provide payment and performance bonding for the full project value, along with proof of general liability and worker's compensation insurance, within ten days of award. Proposals must include detailed relevant experience, a comprehensive work plan with phasing and safety methods, and itemized pricing by room and trade. A minimum one-year workmanship warranty is required upon final acceptance.
Career Systems Development Corporation

POSTED

44 minutes ago

DEADLINE

in 19 days
NAICS: 236220
New
SLED
Building 262 Renovations FLETC Glynco
Solicitation # 70LGLY27RSSB00001
The Building 262 Renovation project at the Federal Law Enforcement Training Center in Glynco, Georgia, is a total small business set-aside solicitation for comprehensive interior modernization. The scope of work includes replacing corridor and classroom flooring with LVP and carpet tiles, fully renovating restrooms with new vanities and lavatories, and updating doors and life-safety components. Technical upgrades involve installing raised flooring and electrical distribution for classrooms, replacing variable air volume systems, upgrading lighting controls, and correcting plumbing deficiencies. The project also requires repainting interior surfaces to a level 4 finish and providing new signage for all spaces. This firm fixed price contract has a performance period from January 11, 2027, to March 11, 2028, totaling 425 calendar days after the notice to proceed. Award will be based on a best suited then negotiate methodology, evaluating past performance, corporate relevant experience, and price. Offerors must provide payment and performance bonds, and a bid guarantee of 20 percent of the bid price or 3 million dollars. Personnel are subject to strict security clearances, including FBI fingerprinting and DHS non-disclosure agreements, and all work must comply with ADA accessibility guidelines and the FLETC Hazardous Waste Management Plan. Proposals are due by November 18, 2026.
Bristol Alliance of Companies

POSTED

44 minutes ago

DEADLINE

in 18 days
NAICS: 236220
New
SLED
Repair Auto Maintenance Bldg 575
Solicitation # N40085-27-R-9000
Solicitation N40085-27-R-9000 is a fixed-price construction project for the repair and modernization of the Auto Maintenance Facility, Building 575, at Marine Corps Base Camp Lejeune, North Carolina. The comprehensive scope of work includes selective demolition, building envelope repairs, new roofing with a 20-year warranty, and exterior wall system updates. Interior improvements involve reconfiguration, new finishes such as epoxy mortar flooring, and the installation of updated HVAC, exhaust extraction, compressed air, and NFPA-compliant fire suppression systems. Additionally, the project requires the replacement of electrical distribution, lighting, low-voltage systems, and building automation controls, alongside site improvements including paving, drainage upgrades, and hazardous materials abatement. The contract has an estimated value between 10 million and 25 million dollars with a performance period of 730 days after award. Bidders must provide pricing for two primary exhibit line items: ELIN 0001 for building renovation and ELIN 0002 for paving removal and replacement. Award is based on the lowest price. Proposals valued at 150 thousand dollars or more require bid, payment, and performance bonds, with bid bonds set at 20 percent of the proposal amount. The project is subject to the Davis-Bacon Act, Buy American requirements, and ADA accessibility guidelines. Invoicing is managed through Wide Area WorkFlow (WAWF) using specific NAVFAC forms. Quality control is strictly managed through a required Contractor QC Plan and a three-phase control process for each definable feature of work.
Bristol Alliance of Companies

POSTED

44 minutes ago

DEADLINE

in 23 days

AI Contract Overview

Show more

Northeast Ohio Medical University is seeking a Construction Manager at Risk (CMR) for the development of a 150,000 square foot Graduate Student Apartment Housing and Innovation Hub at its Rootstown campus. The facility will feature a one or two floor multi-use innovation hub for academic and collaborative programming, along with 130 single-unit graduate student apartments, each approximately 500 square feet. The selected CMR will be engaged as schematic design commences and will provide comprehensive pre-construction and construction services, including constructability reviews, cost estimating, value engineering, and the management of subcontractor bidding through an open book pricing method. The CMR is responsible for project safety, schedule adherence, and compliance with state prevailing wage laws and the Encouraging Diversity, Growth and Equity (EDGE) program. Evaluation for the award is based on a weighted scoring system focusing on firm location, workload, team qualifications, and experience with large-scale student housing and mixed-use vertical projects. The procurement process involves a multi-stage selection where qualified firms submit a Statement of Qualifications by September 30, 2026, followed by a Request for Proposal stage for short-listed candidates to provide pricing and a Guaranteed Maximum Price (GMP) proposal.

General Info

Northeast Ohio Medical University seeks a CMR for graduate housing and innovation hub.

Place of Performance

Not specified

Set-Aside

NONE

Documents

1
PDF, High priority: read this first5 pages · rfq
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyOhio → Neomed
ContactsNo contacts available
OfficeN/A
Organization / AgencyOhio → Neomed
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Project number: 20260615
Northeast Ohio Medical University (NEOMED), 4209 St Rt 44, PO Box 95, Rootstown, Ohio, 44272, requests interested vendors to submit qualifications for Construction Manager at Risk (CMR) to provide Pre-Construction and Construction Services for new construction of the Graduate Student Apartment Housing and Innovation Hub facility at the Rootstown campus. The project site is located north of the Medical Office Building and east of The Village apartments. The building layout had been conceptualized from a recently completed master plan study. The structure will be approximately 150,000 square feet. Features of this facility include a one or two floor multi-use innovation hub for academic and collaborative programming by NEOMED. The additional floors will be dedicated to 130 single unit apartments for graduate student housing. Each approximately 500 sf unit will include furnished bedroom, bathroom, kitchen, living area, and washer-dryer. The selected CMR is anticipated to be contracted as schematic design commences. An early site package and/or multiple GMP procurement packages are anticipated to be included to meet construction schedule. Professional design services have been acquired by the Contracting Authority under a separate contract. The Program of Requirements (“POR”) will be developed as a part of this project by the Architect/Engineer (“A/E”). All aspects of the project and related issues will be implemented and operated consistently with the Contracting Authority and/or Owner’s policies and procedures.
Scope of Services: The selected Construction Manager at Risk (“CM”), as a portion of its required Scope of Services and prior to submitting its proposal, will discuss and clarify with the Contracting Authority and/or Owner, the breakdown of the Agreement detailed cost components, to address the Owner’s project requirements and refine the project schedule. Participate in the Encouraging Diversity, Growth & Equity (EDGE) Program as required by statute and the Agreement. As required by the Agreement, and as properly authorized, provide the following categories of services: provide constructability review comments on documents produced by the A/E during the Schematic Design, Design Development, and Construction Document stages; develop and maintain estimates of probable construction cost, value engineering, project schedules, and construction schedules; lead and manage the Subcontractor Prequalification and Bidding process, Construction and Closeout Stage. Refer to the Ohio Facilities Construction Manual for additional information about the type and extent of services required for each. A copy of the standard Agreement can be obtained at the OFCC website at https://ofcc.ohio.gov. The preconstruction and construction services are generally described below. Subcontracts including but not limited to Plumbing, Fire Protection, HVAC, Electrical and AV/Technology will be awarded by the CM to prequalified vendors using a competitive process. The parties will engage in an “open book” pricing method in which all subcontracted work shall be based upon competitive pricing that will be reviewed by the Contracting Authority and/or Owner, the A/E and the CM. The Contracting Authority and/or Owner shall have access to all books, records, documents and other data in the CM's possession related to itself, its subcontractors and material suppliers pertaining to bidding, pricing or performance of the Agreement. Preconstruction Services: The CM will work cooperatively with the Contracting Authority and/or Owner, A/E, and Project Team, and will provide, among other services, schedule development, estimate development, Guaranteed Maximum Price (“GMP”) proposal, subcontractor prequalification and bidding, constructability review, permits, budgeting, value engineering, and preconstruction planning throughout the preconstruction stages. When the drawings and specifications are at the stage of completion specified in the Agreement, such partially completed documents (the “Basis Documents”) shall be provided to the CM, together with the A/E's detailed listing of any incomplete design elements and the A/E’s statement of intended scope with respect to such incomplete elements (the “Design Intent Statement”). Contingent upon the Contracting Authority’s approval of the GMP, the parties will enter into an amendment to the Agreement establishing the Contract Sum (“GMP Amendment”). If the proposed Contract Sum exceeds the Project Budget established for construction, then the Contracting Authority may terminate the agreement with the CM and seek proposals from other firms for completion of the Project. Construction Services: The CM shall construct the Project pursuant to the construction documents and in accordance with the schedule requirements. The CM shall hold all subcontracts and shall be fully responsible for the means and methods of construction, project safety, project completion within the schedule agreed upon in the preconstruction phase, compliance with all applicable laws and regulations including monitoring compliance with all EDGE, equal employment, and prevailing wage requirements, and submitting monthly reports of these activities to the Contracting Authority. All subcontracts shall be on the subcontract form prescribed by OAC Section 153:1-03-02. The Contracting Authority reserves the right to approve the CM’s selection of subcontractors and any supplemental terms to the form subcontract. For purposes of completing the Relevant Project Experience Matrix in Section F of the Statement of Qualifications (Form F110-330), below is a list of relevant scope of work requirements for this RFQ: 1. Successful experience with Construction Manager at Risk delivery method through the state of Ohio project administration and procurement process. 2. Demonstrated successful experience in collaborating with the Owner and Architect-Engineering team during pre-construction and throughout construction. 3. Experience with large scale student apartment housing construction in higher education settings. 4. Experience with residential over non-residential Vertical mixed-use projects. 5. Owner references and contact information 6. are required for each sample project. 7. Demonstrated track record of meeting strict academic milestone dates established at project start. 8. Experience relating to planning, scheduling and management of budget/schedule challenges encountered because of Northeast Ohio winter weather conditions, long lead items, and unforeseen conditions. 9. Successful experience coordinating early and/or phased construction bid packages to ensure consistent operation. 10. Demonstrated ability to maintain a consistent, experienced project leadership and on-site team from predesign through construction closeout. 11. Demonstrated ability to manage accurate and consistent construction budgets from predesign through the bidding process.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS