Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Solicitation opportunity from California was posted on August 26, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

STWTP Roof and Gutter Waterproofing

Closed
VW0612State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 221310
New
Federal
Water Treatment Chemicals, Testing, Monitoring, and Reporting- Sources Sought Notice / Request for Information
Solicitation # 15B70027PR000089
The Federal Bureau of Prisons (FBOP) is conducting market research to establish a Blanket Purchase Agreement (BPA) for comprehensive water treatment chemicals, testing, monitoring, and reporting services for its correctional institutions nationwide. The scope includes the supply of treatment chemicals and the provision of technical support for steam and hot water boilers, chiller water loops, cooling towers, and domestic water systems. Key requirements include monthly testing and reporting for boiler and chiller systems, as well as quarterly domestic water testing for Legionella, E. coli, lead, arsenic, nitrates, and PFAS. The contractor must be capable of implementing treatment recommendations and delivering chemicals within 15 calendar days of test results. A critical component of the requirement is the maintenance of a secure, web-based online reporting portal that provides institution-level, regional, and central office access for tracking water quality dashboards, chemical usage, and compliance trends. All services and materials must adhere to a rigorous set of standards, including EPA, CDC, OSHA, NFPA, ASHRAE Standard 188, and various federal, state, and local codes. Deliveries to institutions must be made between 8:00 a.m. and 2:00 p.m., Monday through Friday. The government is seeking capable vendors who can manage large-scale, multi-site programs and maintain a valid SAM.gov status, with payments processed via Purchase Order or government credit card.
National Acquisitions - Co

POSTED

5 days ago

DEADLINE

in 16 days
NAICS: 221310
New
Federal
4610--FY27 Portable Reverse Osmosis (RO) Water Purification System
Solicitation # 36C24827Q0114
The Department of Veterans Affairs, Network Contracting Office 8, intends to award a sole-source, firm-fixed-price contract to Evoqua Water Technologies LLC for the procurement and installation of brand-name only EON portable reverse osmosis water purification systems. This requirement is specifically for eight EON Portable RO and ROVER ALX transport system kits to be installed on Government-owned EON rover carts at the Orlando VA Veterans Hospital. The scope of work includes the delivery, installation, and start-up of the kits, the provision of two spare carbon block filter cartridges per kit, and the delivery of onsite clinical and technical training and orientation. The contractor is responsible for providing all necessary labor, tools, materials, supervision, and transportation to complete the turnover to the Government. The contract falls under NAICS Code 221310, which has a small business size standard of 41 million dollars. Delivery is requested within 90 days after receipt of order. As this is a brand-name-only requirement based on the determination that only one responsible source can provide the specialized equipment, this notice serves as an intent to award rather than a solicitation for quotes. Interested parties wishing to challenge the sole-source determination must submit a capabilities statement providing clear and convincing evidence that competition is in the best interest of the Government to Susan Rodriguez-Perez by November 20, 2026.
248-NETWORK Contract Office 8 (36C248)

POSTED

5 days ago

DEADLINE

in 3 days

AI Contract Overview

Show more

Valley Water is seeking bids from qualified contractors to undertake the Roof Repair and Internal Gutter System Replacement project at the Santa Teresa Water Treatment Plant in San Jose, California. The scope of work involves cleaning and replacing approximately 1,000 linear feet of internal gutter systems, installing new clad metal flashing, applying a durable 45-mil TPA single-ply membrane, and installing new drip edges and coping metals. Additionally, contractors will be responsible for installing and heat-welding new drain flashings, conducting leak testing, and providing a comprehensive final quality assurance report. The project emphasizes strict adherence to safety standards, daily reporting, and close coordination with Valley Water to ensure minimal disruption to ongoing facility operations. The timeline mandates substantial completion within 30 days of mobilization, with the overall project scheduled for completion by October 31, 2025. The contract is valued between $250,000 and $500,000, and interested bidders are encouraged to respond by September 17, 2025. The procurement process includes a detailed contractor safety qualification review, requiring submission of safety policies, OSHA records, insurance details, and company history to ensure compliance with safety and operational standards.

General Info

Documents

3
DOCX, High priority: read this firstspecifications
High
PDF, Low priority9 pages · other
Low
DOCX, Low prioritycontract-document
Low

Read all 3 documents

Every page of every file, in your free workspace.

Read the documents

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • Water Retail ServicesOpen now
  • Sector NOLA Water Treatment for HVACOpen now, due in 8 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → Santa Clara Valley Water District
Contacts1 person available
OfficeN/A

Full Description

Show more
Valley Water is soliciting bids from qualified contractors for the Roof Repair and Internal Gutter System Replacement project at the Santa Teresa Water Treatment Plant (STWTP) in San Jose, California. The work includes cleaning and replacing approximately 1,000 linear feet of the internal gutter system, installing new clad metal flashing, applying a 45-mil TPA single-ply membrane, and installing new drip edge and coping metal. Contractors will also install and heat-weld new drain flashings, perform leak testing, and provide a final quality assurance report. The project requires strict compliance with safety standards, daily reporting, and coordination with Valley Water to minimize disruption to facility operations. Substantial completion is required within 30 calendar days of mobilization, with the overall project goal of completion by October 31, 2025.

More opportunities from California → Santa Clara Valley Water District

Same awarding agency

NAICS: 237990
New
SLED
Tularcitos Creek Downstream North Hillview Drive Levee RepairThe Tularcitos Creek Downstream North Hillview Drive Levee Repair Project, managed by the Santa Clara Valley Water District, focuses on repairing approximately 2,932 linear feet of the west bank levee in Milpitas, California. The project aims to address erosion and damage caused by rodent burrowing to protect public safety and property. Reconstruction will utilize SMP-2 Method 1A, which involves installing a buried rock buttress to stabilize the channel embankment and provide a stable foundation over saturated soils. The scope of work includes dewatering, the installation and removal of two temporary access ramps, and bank stabilization, with a total temporary disturbance area of approximately 2.7 acres. A key objective is to restore the levee to design elevation to support a Letter of Map Revision and achieve FEMA accreditation. Construction is anticipated to take place from summer to fall 2027. The project is subject to strict environmental compliance under CEQA and NEPA, with specific requirements for equipment emissions. Contractors must use diesel engines meeting U.S. EPA Tier 4 Final standards and CARB-certified Level 3 filters for equipment over 50 horsepower, and haul trucks must be 2010 model year or newer. Additional mandates include the use of electric or alternative-fueled equipment where feasible, strict hazardous material containment protocols, and the performance of nesting bird surveys by a qualified biologist. The project also requires rigorous dust control measures and the submission of all equipment specifications for agency confirmation prior to the start of construction.
Other Heavy and Civil Engineering Construction

POSTED

1 day ago

DEADLINE

N/A
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS