Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Arizona was posted on February 19, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

SUBREGIONAL OPERATING GROUP SOUTHERN AVENUE INTERCEPTOR REHABILITATION PROJECTS 1, 2, 3, & 4

Closed
WS90160114State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

The City of Phoenix, through its Design and Construction Procurement office, is soliciting qualifications for the Sub-regional Operating Group Southern Avenue Interceptor Rehabilitation Projects 1, 2, 3, and 4. This project involves professional engineering design and potential construction administration and inspection services for the rehabilitation of 82 manholes and 9,790 feet of large diameter sanitary sewer pipe. The estimated construction cost for this effort is 33 million dollars. Interested firms must submit their qualifications via the City's Procurement Portal by March 13, 2026. A pre-submittal meeting is scheduled for March 4, 2026. The procurement follows a trade-off evaluation process where technical merit, past performance, and team qualifications are prioritized over price alone. Key requirements include personnel certifications such as OSHA and NACE Level III. The selected Design-Builder will be subject to strict City oversight regarding subcontractor selection, requiring a formal Subcontractor Selection Plan and City approval for all major trades and suppliers. Evaluation of respondents will heavily weigh past performance, as evidenced by a structured reference check process where previous clients score teams on a scale of 1 to 4 across categories such as quality of work, innovation, and budget adherence.

Documents

5
DOC, High priority: read this first2 pages · amendment
High
PDF, High priority: read this first3 pages · contract-document
High
PDF, High priority: read this first5 pages · reference-check-instructions
High
DOCX, High priority: read this firstpast-performance
High
PDF, High priority: read this firstrfq
High

Read all 5 documents

Every page of every file, in your free workspace.

Read the documents

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • 26350 Lynchburg, VA - CSO 70 Sewer ImprovementsOpen now, due in 12 days
  • Lift Station No. 85 ReplacementOpen now, due in 23 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyArizona → Design and Construction Procurement
Contacts1 person available
OfficePHOENIX, AZ, 85003, USA

Full Description

Show more
The City of Phoenix is requesting qualifications for Project Title . Qualifications are to be submitted via the City's Procurement Portal at https://procurement.opengov.com/portal/phoenix before Response Submission Time on Response Submission Date .

More opportunities from Arizona → Design and Construction Procurement

Same awarding agency

NAICS: 237110
New
SLED
ARIZONA SCIENCE CENTER STORMWATER AND SEWER PIPE REPLACEMENT CONSTRUCTION MANAGER AT RISK SERVICES
Solicitation # PW26740069
The City of Phoenix is seeking a Construction Manager at Risk (CMAR) for the Arizona Science Center Stormwater and Sewer Pipe Replacement project, with an estimated construction cost of $8.2 million. The scope of work involves the replacement or approved remedy of all existing drain, waste, vent, and storm drainage systems to address aging infrastructure. The selected CMAR will provide preconstruction services, including detailed cost estimating and budget validation, and will be required to submit two Guaranteed Maximum Price (GMP) proposals in MAG or CSI format. Construction services include safety oversight, quality control, and a requirement for 24-hour, 7-day emergency response coverage with an on-site response time of two hours. Additionally, the project includes an add alternate for ADA upgrades, specifically adult changing stations. Interested firms must submit a Statement of Qualifications (SOQ) and a separate bonding statement from a surety company rated A- or better via the City's Procurement Portal by December 11, 2026. The SOQ is limited to 12 pages and must include an information sheet, an organization chart of key personnel, and evidence of at least three comparable CMAR projects. Evaluation is based on a 1,000-point scoring system and reference checks. The project emphasizes Small Business Enterprise (SBE) participation, requiring that eligible SBE subcontractors be located within Maricopa County and provide Letters of Intent. There is no set-aside status for this solicitation.
Water and Sewer Line and Related Structures Construction

POSTED

3 days ago

DEADLINE

in 19 days
View Details
NAICS: 237110
New
SLED
SANITARY SEWER REHABILITATION PROGRAM JOB ORDER CONTRACT
Solicitation # JOC261
The City of Phoenix is seeking up to five qualified contractors for the Sanitary Sewer Rehabilitation Program Job Order Contract (JOC261), an on-call program focused on maintaining the wastewater collection system. The scope of work primarily involves the rehabilitation of 8-inch to 15-inch diameter clay pipes using cured-in-place pipe (CIPP) lining, though it may include dig-and-replace operations, manhole repair, sewer cleaning, CCTV scans, and bypass pumping. The contract has a duration of 36 months with a potential value of up to $50,000,000, though individual JOCs are capped at $30,000,000. All work will be performed within the State of Arizona. Selection is based on a qualifications-based process where firms are evaluated on general information, Arizona contractor licensing, and performance reference checks. Applicants must submit a Statement of Qualifications (SOQ) in PDF format via the City's procurement portal by November 30, 2026. Required documentation includes a bonding capacity statement from a surety company and the firm's current Experience Modification Rate (EMR). While the contract includes a Small Business Enterprise (SBE) clause and requires a Statement of Proposed SBE Utilization, the SBE goal for this specific project is set at 0.00%. There is no set-aside status for this solicitation.
Water and Sewer Line and Related Structures Construction

POSTED

3 days ago

DEADLINE

in 8 days
View Details
NAICS: 236220
New
SLED
ESTRELLA CIVIC SPACE BRANCH LIBRARY (GO BOND) AND ROAD IMPROVEMENTS CONSTRUCTION MANAGER AT RISK SERVICES
Solicitation # PA75200751 & LS71200119
The City of Phoenix is seeking a Construction Manager at Risk (CMAR) to provide preconstruction and construction services for the Estrella Civic Space Branch Library (GO Bond) and Road Improvements project. The scope of work integrates goals from the Parks and Library Departments, involving the construction of a new 12,000 square foot branch library and significant street improvements at 99th Avenue and Lower Buckeye Road, including a new traffic light, bike lanes, and sidewalks. The estimated construction cost for the project is 9.7 million dollars, and the CMAR will be responsible for delivering the project via a Guaranteed Maximum Price (GMP) contract submitted in MAG or CSI format. Selection is based on a qualifications-based process where firms must submit a Statement of Qualifications (SOQ) by December 4, 2026. The evaluation includes a points-based scoring system for the SOQ and an additional 600 points for finalist interviews. Required submittals include a bonding statement from a surety company with a rating of A- or better, the firm's current Experience Modification Rate (EMR), and an organization chart of key personnel with Arizona contractor licenses. The project also mandates strict Small Business Enterprise (SBE) participation, requiring certified firms to perform at least 75 percent of their contract cost with their own workforce to be considered as performing a Commercially Useful Function. There is no set-aside status for this solicitation.
Commercial and Institutional Building Construction

POSTED

4 days ago

DEADLINE

in 12 days
View Details

Get AI-powered intelligence on the opportunities still open

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS