This Solicitation opportunity from Tennessee was posted on December 10, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
Summit Softball Concession Stand Ventilation
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The contract involves the installation of a new concession hood system at the Red Building in the Summit of the Softball complex, which includes a UL-listed grease exhaust hood, exhaust fan, makeup air unit, ductwork, and an integrated fire suppression system. Additionally, the scope covers electrical upgrades such as replacing the existing 400A service panel with a 500A panel, updating the service feeder in underground conduit, and installing a new 208/120V panel with a step-down transformer to support the new system. The project also entails replacing existing smoke detectors with dual fixed temperature and rate-of-rise heat detectors in multiple buildings, including the Red, Blue, and Maintenance Buildings, along with reprogramming fire alarm panels to minimize false alarms caused by dust. The solicitation, titled "Summit Softball Concession Stand Ventilation," was posted in December 2024 with a response deadline of December 19, 2024. It is managed by the City of Chattanooga, Tennessee, under NAICS code 334290, with project costs estimated between $150,000 and $300,000. The primary point of contact is Debbie J Talley, who can be reached via email for further inquiries. The contract aims to enhance ventilation, fire safety, and electrical infrastructure at the softball complex, ensuring compliance with safety standards and operational efficiency.
General Info
Place of Performance
TN, USASet-Aside
Documents
4AI Contract Breakdown
Uniform Contract FormatContract not broken down yet
CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.
Timeline
Submission Closed
Organization & Contact Information
Full Description
Adding new concession hood system in Red Building in the Summit of Softball complex. This system shall be complete with U.L. listed/labeled grease exhaust hood, grease exhaust fan, makeup air unit, interconnecting ductwork, and integral fire suppression system. Adding new power underneath new hood, including replacing existing 400A 480/277V service panel with 500A 480/277V service panel, replacing existing service feeder in existing underground conduit for 500A service, and adding new 208/120V panel and step-down transformer. Replacing existing photoelectric smoke detectors with new dual fixed temperature/rate-of-rise heat detectors to reduce continuing false alarms due to dust in Red Building, Blue Building, and Maintenance Building, including reprogramming of fire alarm panels.
Earlier notices in this NAICS code
Posted before this notice, open and closed
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS
